Work Logs Found: 52
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 12-17-2014
0.00
paint booth light REDO
Details
     

 12-12-2014
0.00
upgraded paint booth lights
Details
       

 09-22-2014
0.00
asphalt approach
       

 12-16-2013
0.00
build paint table and rig air hoses
       

 12-14-2013
0.00
paint booth complete!
Details
       

 12-13-2013
0.00
finish paint booth plastic
     

 12-12-2013
0.00
plastic installation
       

 12-11-2013
0.00
paint booth continued
       

 12-09-2013
0.00
install paint booth lights, fan
       

 12-07-2013
0.00
paint booth construction
Details
       

 11-18-2013
0.00
misc. finishing
       

 11-04-2013
0.00
install floor heat vents & fill system
       

 10-24-2013
0.00
gravel approach
     

 10-19-2013
0.00
movin in
       

 10-16-2013
0.00
install in floor heat backboard
     

 10-12-2013
0.00
new air compressor
       

 10-10-2013
0.00
install air distribution
       

 10-08-2013
0.00
add electrical outlets
       

 10-01-2013
0.00
apply epoxy floor coating
       

 09-30-2013
0.00
add 2 lights, prep floor for epoxy
       

 09-28-2013
0.00
finish interior steel
       

 09-27-2013
0.00
install upper facia trim
     

 09-26-2013
0.00
hangar door repair complete, gutters installed
       

 09-25-2013
0.00
hangar door rep arrived to fix door
       

 09-24-2013
0.00
paint upper trim, begin installing interior steel
       

 09-22-2013
0.00
insutate hangar door
       

 09-21-2013
0.00
insulate above door and by new man door
     

 09-20-2013
0.00
insulate south wall, outside is done
       

 09-19-2013
0.00
install man door, finish outside steel
       

 09-18-2013
0.00
test and skin door
       

 09-17-2013
0.00
mount door, run hydraulics and electrics
Details
       

 09-16-2013
0.00
paint door truss
     

 09-13-2013
0.00
foam board and trim
       

 09-12-2013
0.00
add purlins e and s
       

 09-11-2013
0.00
spray foam e and s walls
       

 09-10-2013
0.00
framing e wall
     

 09-05-2013
0.00
west wall insulation
       

 09-04-2013
0.00
frame for interior finish
       

 08-28-2013
0.00
begin door installation
       

 08-27-2013
0.00
elec panel installed
     

 08-12-2013
0.00
concrete
     

 08-09-2013
0.00
rebar
     

 08-08-2013
0.00
floor heat manifold
       

 08-05-2013
0.00
floor heat tubing
       

 08-02-2013
0.00
grading and steel installation
       

 07-31-2013
0.00

Details
     

 07-30-2013
0.00

       

 07-27-2013
0.00

       

 07-25-2013
0.00

       

 07-20-2013
0.00

       

 07-19-2013
0.00

       

 07-18-2013
0.00

     