KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
Work Logs Found: 13
Category Work Time: 19 Hours
 Date
Hours
Work Log Summary

Details

 05-12-2016
1.20
Install Flexo Loom on Brake Lines
Details
       

 05-19-2014
2.00
Tighten all Fuel and Brake Fittings, Fabricate Pre
Details
     

 04-25-2014
0.80
Install Braided SS Brake Lines, Fuel Pressure Sens
Details
       

 09-08-2013
3.50
Finish Brake Line Installation
Details
       

 09-06-2013
1.30
Pirme Firewall
Details
       

 09-06-2013
1.50
Finish Brake Lines
Details
       

 08-26-2013
2.00
Fabricate Brake Lines
Details
       

 08-09-2013
1.80
Fabricate Tunnel Brake Lines
Details
     

 08-07-2013
0.90
Fabricate Tunnel Brake Lines
Details

 08-07-2013
1.30
Fabricate Bulkhead to gear Leg Brake Lines
Details
       

 07-30-2013
1.50
Fabricate Left Brake Line
Details
     

 07-28-2013
0.70
Install Brake Line Fittings
Details
       

 06-21-2013
0.60
Remove Cabin Heat Flanges
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.