Powered By Kitlog Pro v2.0
Traci and Tom's RV-7A
RV-7A
Elevator
Work Logs Found:
59
Category Work Time:
65 Hours
Date
Hours
Work Log Summary
Details
11-15-2013
0.50
Drilling the pivot point in the elvator horns
Details
11-13-2013
1.30
trimming H. stab trim to fit elevator counterweigh
Details
11-13-2013
0.70
Fitting elevator hinges.
Details
11-12-2013
0.70
Screwing in the hinge bearing bolts to the elevato
Details
11-11-2013
0.50
PVC hinge beariing screwing-in tool.
Details
11-11-2013
1.50
Final leading edge rolling of left elevator
Details
11-08-2013
1.00
Left elevator leading edge rolling.
Details
11-07-2013
1.70
Rolling the right elevator leading edge.
Details
11-07-2013
1.50
Riveting the right elevator leading edges.
Details
11-05-2013
0.50
Some fine tuning the elevator tab bends.
Details
11-04-2013
0.70
Riveting left elevator skeleton.
Details
11-04-2013
1.00
Bending tab for trim tab on left elevator skin.
Details
11-01-2013
0.70
Setting up for elevator/trim tab flange bending.
Details
10-22-2013
1.50
Riveting the skin on the left skeleton.
Details
10-22-2013
1.00
Riveting the right elevator skeleton.
Details
10-21-2013
1.00
Trimming the right side elevator counterweight.
Details
10-21-2013
2.50
Preparing the right elevator spar and rib - again.
Details
10-17-2013
1.00
RTV on the trailing edge and counterweight marking
Details
10-15-2013
0.70
Completing right elevator skeleton assembly.
Details
10-14-2013
1.00
Riveting the right elevator skeleton.
Details
10-14-2013
0.50
Riveting and completeing the trim tab server mount
Details
10-11-2013
1.50
Preparing the trim tab servo mounting.
Details
10-11-2013
2.50
Left spar rebuild/reprime
Details
10-10-2013
0.70
Left elevator rib/spar mistake
Details
10-09-2013
0.70
Trim tab plate - nut plate riveting.
Details
10-09-2013
0.50
Machine countersinking the trim tab hinge spar.
Details
10-09-2013
0.70
Left counterweight skin dimpling.
Details
10-09-2013
0.50
Dimpling the bottom of the trim tab hinge spar.
Details
10-08-2013
0.70
Trim nutplate rivet countersinking.
Details
10-07-2013
0.70
Left horn, skeleton, and trim spar fitting.
Details
10-07-2013
1.25
Left elevator counterweight rib fitting.
Details
10-04-2013
0.00
Just me. :-)
10-04-2013
1.50
Final dimpling and skeleton prep for right elevato
Details
10-03-2013
0.50
Left elevator rib dimpling. E-705 error.
Details
10-03-2013
1.00
Dimpling elevator counterweight skin for mounting
Details
10-03-2013
0.70
Dimple flattening, and counterweight drillling.
Details
10-02-2013
0.70
Checking the radius of the elevator bend.
Details
10-02-2013
0.50
Bending left elevator trailing edge.
Details
10-02-2013
0.70
Assembling and match drilling left elevator skin a
Details
10-01-2013
0.70
Counterweight drilling (right elevator)
Details
09-30-2013
1.50
Riveting lessons and successful stiffener riveting
Details
09-26-2013
1.50
Dimpling elevator skins and ready for primer prep.
Details
09-25-2013
3.00
Match drilling stiffeners and skin holes.
Details
09-24-2013
1.00
Cutting and fittig the stiffeners.
Details
09-19-2013
1.70
New elevators arrive - and cutting stiffeners
Details
09-17-2013
1.00
Rivet removal practice from elevators.
Details
09-13-2013
1.00
Staring at rivets....put in order with Van's
Details
09-11-2013
1.00
Elevator trailing edge bending brake.
Details
09-10-2013
0.70
Instaling the trim backing plate.
Details
09-09-2013
2.00
Right elevator back riveting.
Details
09-05-2013
1.50
Back riveting elevator skin - problems.
Details
09-04-2013
0.50
Backriveting problems with the elevator stiffeners
Details
08-30-2013
0.70
Prepping the elevator skins for priming
Details
07-18-2013
0.70
Replaced the E-720 L stiffener
Details
07-17-2013
0.70
Trim tab plate
Details
07-17-2013
2.50
Elevator Stiffeners
Details
07-15-2013
3.00
Right elevator drill, cut, deburr, grind and match
Details
07-15-2013
1.00
A mistake - cut one of the E720 stiffeners wrong.
Details
07-11-2013
2.00
Priming...and starting the rudder.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
176
198
Horz Stablizer
45
54
Arrival
1
0
Elevator
59
65
Empennage
1
2
Firewall
3
3
Fuselage
2
3
Inventory
2
3
Rudder
36
34
Shop setup
5
10
Trim Tab
9
8
Vert Stabilizer
13
16
Copyright © 2001-2024 Matronics. All Rights Reserved.