Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
Electrical-cockpit
Work Logs Found:
12
Category Work Time:
16 Hours
Date
Hours
Work Log Summary
Details
11-15-2014
3.50
wig wag wiring redo
Details
10-03-2013
1.00
Install stallwarner cutoff switch and molex connec
Details
09-10-2013
0.50
Map light and external music jack final wiring
Details
09-08-2013
2.00
USB port install
Details
09-08-2013
0.50
Final stick grip wire connections at terminal bloc
Details
08-27-2013
1.00
map lights and stereo input wires cut for dsub pin
Details
08-15-2013
0.25
Test USB function
Details
08-03-2013
0.25
Re install the wigwag set up to lower console
Details
06-23-2013
1.00
Wig wag final wiring
Details
06-22-2013
3.00
WigWag wiring-1
Details
06-18-2013
2.00
Reinstall front stick grip and wire
Details
06-14-2013
0.50
wrap wire bundles under left and right lowere cons
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.