TERRY'S WEB SITE
Work Logs Found: 344
Category Work Time: 2131 Hours
 Date
Hours
Work Log Summary

Details

 03-03-2016
5.00
Prime fairings
Details
       

 02-17-2016
5.00
Fuel line install
Details
       

 02-16-2016
8.00
Main brakes bled
Details
     

 12-17-2015
3.00
Retest fuel tanks
Details
       

 12-14-2015
7.00
Reinstalled Avionics
Details
     

 12-10-2015
5.00
Tail wiring and MiniX antenna work
Details

 12-08-2015
7.00
Fuel Selector work
Details
       

 11-28-2015
6.00
Seat belts installed
Details
     

 11-27-2015
8.00
Front panel and seatbelt holder
Details
       

 11-24-2015
6.50
Overhead panels
Details
       

 11-23-2015
8.50
Interior panel
Details
       

 11-18-2015
6.00
Ground Power
Details
     

 11-17-2015
7.50
Ground Power
Details
       

 11-14-2015
3.60
Ground Power (GP)
Details
       

 11-14-2015
3.00
Ground Power
Details
       

 11-13-2015
8.00
Ground Power
Details
     

 11-12-2015
8.00
Ground Power Unit
Details
       

 11-11-2015
8.00
Ground Power fit up
Details
       

 11-10-2015
8.00
GP access door
Details
       

 11-09-2015
4.40
GP access door opening
Details
       

 11-04-2015
6.50
Sun Visor Install
Details
       

 11-03-2015
7.50
Door pin switches installed
Details
     

 11-02-2015
7.50
Upper cowling paint
Details
       

 10-30-2015
9.00
Door Lift Cylinder - replace
Details
       

 10-28-2015
8.00
Door Locks
Details
       

 10-28-2015
4.00
Cowling prime
Details
       

 10-26-2015
8.00
Block Sand to remove holes
Details
     

 10-20-2015
9.00
Cowling prep for paint
Details
       

 10-19-2015
8.50
Pin hole filling - first coat
Details
       

 10-19-2015
8.50
Block sanding
Details
     

 10-16-2015
3.50
Door cylinder bracket / insulation
Details
       

 10-15-2015
3.00
Pass through capped
Details
       

 10-12-2015
7.00
Interior parts/doors painted
Details
       

 10-10-2015
5.00
Post Cabin Paint
Details
       

 10-09-2015
8.50
Cabin door jamb painting
Details
       

 10-08-2015
8.50
Filling cabin radius
Details
       

 10-05-2015
7.00
Sanding doors
Details
     

 10-03-2015
3.50
Door sanding pin filling
Details
       

 10-02-2015
6.50
Door sanding
Details
       

 10-01-2015
7.00
Exterior door work
Details
       

 09-30-2015
6.00
Pin hole filling
Details
       

 09-29-2015
9.00
Jim Priming the cabin
Details
       

 09-28-2015
7.00
Prep cabin for Prime Paint
Details
       

 09-25-2015
7.00
Rough sanding cabin
Details
       

 09-24-2015
7.00
Pin hole filling
Details
     

 09-22-2015
6.50
Pin hole filling
Details
       

 09-21-2015
6.00
Prep for prime paint
Details
       

 09-18-2015
6.00
Rough sanding cabin cover
Details
       

 09-17-2015
5.50
Cabin fairing work
Details
       

 09-16-2015
3.00
Cabin Fairing
Details
     

 09-14-2015
4.50
Cabin Fairing
Details
       

 09-11-2015
8.00
Cabin Fairing
Details
       

 09-10-2015
3.50
Cabin Fairing
Details
     

 09-09-2015
6.00
Cabin Fairing
Details
       

 09-08-2015
2.50
Cabin Fairing
Details
       

 09-07-2015
7.50
Cabin Fairing
Details
       

 09-01-2015
5.00
Cabin Fairing
Details
       

 08-31-2015
5.50
Cabin Fairing
Details
       

 08-30-2015
5.50
Cabin Fairing
Details
       

 08-29-2015
5.50
Cabin Fairing
Details
       

 08-28-2015
7.00
Cabin Fairing
Details
       

 08-27-2015
6.00
Cabin Fairing
Details
       

 08-25-2015
8.00
Cabin Fairing
Details
       

 08-24-2015
5.00
Cabin/Fuselage joint treatment
Details
       

 08-23-2015
2.00
Cabin Fairing
Details
       

 08-22-2015
10.00
Cabin Fairing
Details
       

 08-19-2015
7.20
Window joint work
Details
       

 08-18-2015
6.00
Window joint work
Details
       

 08-17-2015
6.50
Window joint work
Details
       

 08-15-2015
3.00
Window joint treatment
Details
       

 08-14-2015
7.00
Window joint work
Details
     

 08-13-2015
5.00
Window joint treatment
Details
       

 08-10-2015
7.00
Windscreen fairing
Details
       

 08-07-2015
6.00
Windscreen sanding
Details
       

 07-31-2015
2.00
Fairing final void filling
Details
       

 07-30-2015
4.00
Fairing work
Details
       

 07-28-2015
10.00
Fairing work
Details
       

 07-25-2015
6.00
Fairing work
Details
       

 07-23-2015
8.00
Aft window install
Details
       

 07-21-2015
8.00
Windscreen sanding and fillet
Details
       

 07-18-2015
8.00
Installing windscreen
Details
       

 07-17-2015
8.00
Windscreen work
Details
       

 07-16-2015
8.00
Windscreen prep
Details
       

 07-14-2015
8.00
Windscreen prep
Details
       

 07-13-2015
8.00
Door windows
Details
       

 07-13-2015
5.00
Cabin install prework
Details
       

 07-08-2015
2.00
Window install
Details
       

 07-07-2015
9.00
Window work
Details
       

 07-06-2015
8.00
Window work
Details
       

 07-03-2015
7.00
Aft section riveting
Details
     

 07-01-2015
7.50
Aft cargo bay work
Details
       

 06-30-2015
7.50
Air vents
Details
       

 06-29-2015
8.50
Plane Around door latch
Details
       

 06-27-2015
7.00
Rework doors to install locks
Details
       

 06-26-2015
7.50
Door lock upgrade
Details
       

 06-25-2015
4.50
Side vents
Details
       

 06-24-2015
9.00
Aft side panel work
Details
       

 06-23-2015
8.80
Forward side panels
Details
       

 06-22-2015
8.00
Aerosport leather inserts
Details
       

 06-19-2015
8.00
Panel wire final routing
Details
       

 06-18-2015
5.00
Rear air vent SCAT tube
Details
       

 06-17-2015
9.00
Cabin install
Details
       

 06-16-2015
7.00
Headliner Install
Details
       

 06-15-2015
7.00
Cabin Install prework
Details
       

 06-12-2015
8.00
Internal covers installed
Details
       

 06-09-2015
7.00
Prep interior cabin for final paint
Details
       

 05-30-2015
6.00
Cargo bay door wiring
Details
       

 03-25-2015
6.80
Upper Forward Fuselage Install
Details
       

 03-10-2015
8.00
Boost Pump Rework
Details
       

 02-16-2015
8.00
Heat cables installed and trimmed
Details
       

 02-07-2015
8.00
Glare screen fit up
Details
       

 01-26-2015
7.00
Static line reworked
Details
       

 01-09-2015
8.00
Fuel Transducer Bracket
Details
       

 01-03-2015
5.00
Seats
Details
       

 12-01-2014
4.00
Oil service door, baffle rods
Details
       

 11-21-2014
6.00
Oil service door
Details
       

 11-20-2014
5.00
Oil service door
Details
       

 11-19-2014
6.00
Oil service door
Details

 11-18-2014
6.00
Oil service door
Details
       

 10-04-2014
4.00
Completed lower fairings
Details

 10-03-2014
4.00
Sanded right wheel fairing
Details
       

 10-02-2014
4.00
Nose fairing work
Details

 10-01-2014
6.00
Transition pieces
Details
       

 09-29-2014
6.00
Transition fairing work
Details
       

 09-26-2014
3.00
Fairing fiberglass work
Details
       

 09-25-2014
7.00
Fairing and seat work
Details
       

 09-24-2014
3.00
Fairing landing work
Details
     

 09-23-2014
8.00
Front leg fairing
Details
       

 09-12-2014
6.00
Nose wheel fairing
Details
       

 09-11-2014
3.50
Front fairing fiberglass reinforcement
Details
       

 09-10-2014
5.00
Front fairing work and panel review
Details
       

 09-09-2014
8.00
Main wheel transistion pieces
Details
       

 09-08-2014
7.00
Transistion pieces
Details
       

 09-06-2014
4.00
Upper fairing transistion
Details
       

 09-05-2014
6.00
Upper fairing transition
Details
       

 09-04-2014
4.00
Leg fairings
Details
       

 09-03-2014
6.00
Leg fairings
Details
       

 09-02-2014
7.00
Main fairing work. Leg fairing
Details
       

 09-01-2014
4.50
Wheel fairing
Details
       

 08-29-2014
6.00
Main gear fairing
Details
       

 08-28-2014
7.00
Main wheel fairing work
Details
       

 08-27-2014
7.00
Main gear fairing
Details
       

 08-26-2014
7.00
Main wheel fairings
Details
       

 08-25-2014
7.00
Lower gear fairings
Details
       

 08-24-2014
3.00
Cowling pin covers
Details
       

 08-21-2014
6.00
Cowling pin / Fuel pump heat shield
Details
       

 08-20-2014
6.00
Cowling hinge
Details
       

 08-19-2014
8.00
Cowling
Details
       

 08-18-2014
8.00
Cowling vent
Details
       

 08-16-2014
1.50
Air inlet ramps attach
Details
       

 08-14-2014
8.00
Lower cowling work
Details
       

 08-13-2014
4.00
Lower cowl riveting
Details
       

 08-12-2014
8.00
Lower cowling hinge reworked
Details
       

 08-11-2014
8.00
Lower cowling work
Details
       

 08-10-2014
3.00
Air inlet ramps
Details
       

 08-09-2014
6.00
Air inlet ramp work
Details
       

 08-08-2014
7.00
Cowl air inlet ramps
Details
       

 08-07-2014
8.00
EAA Inspection and upper cowl fit
Details
       

 08-06-2014
6.00
Cowling Install
Details
       

 08-05-2014
8.00
Prop Installed
Details
       

 07-16-2014
8.00
Front wheel installed
Details
       

 07-15-2014
8.00
Michelin tires mounted
Details
       

 07-14-2014
5.00
MATCO brakes
Details
       

 07-14-2014
3.00
Lower gear install
Details
       

 07-12-2014
8.00
Rudder pedal final install
Details
       

 07-09-2014
4.00
Fuselage paint
Details
       

 06-14-2014
3.00
Prime inside cabin and doors
Details
       

 06-12-2014
5.00
Nose wheel gear assembly
Details
       

 06-09-2014
5.00
Paint caster wheel and fairing brackets
Details
       

 06-06-2014
8.00
Poly Fill interior cabin doors
Details
       

 06-05-2014
6.00
More Poly Fill
Details
     

 06-04-2014
7.00
Poly Fill cabin interior
Details
       

 06-03-2014
7.00
Overhead console wiring and venting
Details
       

 06-01-2014
2.00
Clear coat console
Details
       

 05-31-2014
3.00
Caster wheel upgrade
Details
     

 05-30-2014
6.00
Prep overhead console
Details
     

 05-28-2014
5.00
Wet sanding the overhead console
Details
     

 05-27-2014
6.00
Forming wheel fairing
Details
       

 05-23-2014
8.00
Prep fuselage
Details
       

 05-21-2014
5.00
Balance Wheels
Details
       

 05-19-2014
5.00
Engine mount
Details
       

 05-16-2014
5.00
Forward Insulation
Details
       

 05-15-2014
1.00
Overhead console aft edge replace
Details
     

 05-05-2014
8.00
Fitting the headliner
Details
       

 05-04-2014
5.00
Oil cooler bracket install
Details
     

 04-30-2014
7.00

Details
       

 04-29-2014
5.00
Overhead console install
Details
       

 04-28-2014
8.00
Cabin console work
Details
       

 04-18-2014
5.00
Door panels
Details
       

 04-17-2014
8.00
Door panel lay up with fiberglass
Details
       

 04-16-2014
6.00
Door panel start lay up
Details
       

 04-14-2014
7.00
Firewall forward inventory
Details

 04-09-2014
7.00
Hinge covers
Details
       

 04-08-2014
5.00
Aluminum hinge covers
Details
       

 04-07-2014
4.00
Hinge pockets
Details
     

 04-02-2014
4.00
Door seal
Details

 03-31-2014
5.00
Door seal work
Details
     

 03-31-2014
6.00
Door seal and duct opening
Details
       

 03-30-2014
2.00
Cutting cabin for door seal
Details
       

 03-29-2014
4.00
Door ledge
Details
       

 03-28-2014
3.00
Door ledge moving
Details
       

 03-27-2014
7.00
Door seal work
Details
       

 03-26-2014
2.50
Master Carr door seal
Details
       

 03-25-2014
8.00
Master Carr door seal
Details
       

 03-24-2014
8.00
Door mechanism
Details
       

 03-22-2014
7.00
Door mechanism
Details
       

 03-21-2014
8.00
Door mechanism and pin locator switch
Details
       

 03-20-2014
4.00
Door mechanism locator pins
Details
       

 03-20-2014
4.00
Door mechanism
Details
       

 03-19-2014
8.00
Cabin door mechanism
Details
       

 03-18-2014
8.00
Cabin door mechanism
Details
       

 03-17-2014
2.00
Making brackets to cover door hinges inside
Details
     

 03-13-2014
8.00
Door mechanism
Details
       

 03-06-2014
8.00
Cabin door hinge shims
Details
       

 03-05-2014
4.00
Installing right cabin door
Details
       

 03-05-2014
3.00
Cabin Hinges
Details
       

 02-28-2014
6.00
Door skin voids filled
Details
       

 02-27-2014
7.00
Cabin door rough fit up completed
Details
       

 02-26-2014
7.00
Cabin door fit up
Details
     

 02-25-2014
7.00
Cabin door rough fit
Details
       

 02-24-2014
7.00
Cabin door fit up
Details
       

 02-21-2014
4.00
Left door glue up
Details
       

 02-20-2014
7.00
Cabin door hinge pins
Details
       

 02-19-2014
5.00
Door skin glue
Details
       

 02-13-2014
4.00
Strut doubler
Details
       

 02-12-2014
6.00
Door skin drilled
Details
       

 02-10-2014
3.00
Tires and Wheels
Details
       

 02-10-2014
3.00
Main tires and wheels
Details
       

 02-07-2014
6.00
Prep for cabin door work
Details

 02-06-2014
5.00
Cabin doors - cont
Details
       

 02-05-2014
2.00
Cowling attach hinges & tools
Details
       

 02-05-2014
5.00
Cabin doors
Details
       

 02-04-2014
6.00
Left wing fairing brackets
Details
       

 01-30-2014
8.00
Left wing fairings initial attach
Details
       

 01-29-2014
7.00
Left wing initial fit up
Details
       

 01-26-2014
3.00
Installed Garmin autopilot brackets
Details

 01-23-2014
6.00
Finished Right wing initial fit up
Details
       

 01-22-2014
7.00
Wing fairing support angles attach
Details
       

 01-21-2014
8.00
Right wing initial fit
Details
       

 01-20-2014
8.00
Right wing fit up
Details
       

 01-16-2014
8.00
Wing/fuselage attach angle & nut plates
Details
       

 01-11-2014
6.00
Cowl attach spacers and hinges
Details
       

 01-10-2014
4.00
Tunnel fuel line connections & control connections
Details
       

 01-09-2014
4.00
Boost pump platform paint, boost pump attach
Details
       

 01-08-2014
6.00
FT60 transducer & boost pump platform
Details
       

 01-07-2014
1.00
FT60 Fuel Transducer
Details
     

 12-18-2013
7.00
Andair fuel selector
Details
       

 12-16-2013
8.00
Andair fuel selector install
Details
     

 11-26-2013
8.00
Overhead Console
Details
       

 11-19-2013
8.00
Cabin Cover forward brace
Details
       

 11-18-2013
7.00
Cabin Cover - fasten
Details
       

 11-12-2013
8.00
Cabin Cover
Details
       

 11-06-2013
8.00
Cabin Cover
Details
       

 11-04-2013
7.00
Cabin Cover fit up
Details
       

 11-03-2013
8.00
Cabin Cover
Details
       

 10-28-2013
3.00
Assemble and install rear seat backs
     

 10-26-2013
3.00
Primed rear seat backs
Details
     

 10-25-2013
5.00
Rear seat back assembly
Details
       

 10-23-2013
7.00
Flap motor install
Details
       

 10-22-2013
5.00
Flap torque tube assembly
Details
       

 10-21-2013
8.00
Control Stick Install
Details
       

 10-18-2013
3.00
Paint push tubes
Details
     

 10-17-2013
7.00
Elevator push tubes before paint
Details
       

 10-16-2013
6.00
Rudder cable and push tube
Details
       

 10-15-2013
1.00
Avionics Thoughts
Details
     

 10-11-2013
8.00
Brake lines / Rudder cables
Details
       

 10-10-2013
5.00
Brake / rudder pedal assembly
Details
       

 10-09-2013
6.00
Installing brake lines
Details
       

 10-08-2013
4.00
Panel covers prep and paint
Details
       

 10-07-2013
8.00
Misc covers and floor panels manufacture
Details
       

 10-04-2013
7.00
Floor pan installed
Details
       

 10-03-2013
7.00
Cargo bay door install
Details
       

 10-02-2013
6.00
Floor panels and insulation
Details
       

 10-01-2013
4.00
NAV1 Cable and static tube support
Details
       

 10-01-2013
5.00
Assemble cargo bay door
Details
       

 09-30-2013
8.00
Cargo bay door assembly
Details
       

 09-27-2013
8.00
Static line, RG400 NAV1 run
Details
       

 09-26-2013
8.00
Pitot line run and conduit
Details
       

 09-25-2013
8.00
Floor insulate and conduit runs
Details
       

 09-24-2013
7.00
Right side wire cover
Details
     

 09-23-2013
6.00
RG400 wire run
Details
       

 09-20-2013
6.00
Aux battery, conduit runs and insulation install
Details
       

 09-19-2013
8.00
Install step, prime paint floor panels
Details
       

 09-18-2013
8.00
Conduit under floor start
Details
       

 09-17-2013
8.00
Cargo bay floor fit up
Details
       

 09-16-2013
8.00
Finish empennage attach, build tail support
Details
       

 09-14-2013
7.00
Empennage attach
Details
       

 09-13-2013
8.00
NAV1 VOR/GS dipole antenna installed
Details
       

 09-12-2013
7.00
Joining the empennage and aft mid section
Details
       

 09-10-2013
5.00
NAV1 Antenna install prep
Details
       

 09-09-2013
7.00
Begin empennage connection to mid section
Details
       

 09-06-2013
8.00
Prime fuselage skin, assemble upper forward fusela
Details
       

 09-05-2013
8.00
Fuselage side vent assembly and install
Details
       

 09-04-2013
8.00
Skin fit up on upper forward fuselage
Details
       

 09-03-2013
8.00
Forward upper fuselage assembly
Details
       

 09-02-2013
4.00
Step Installation
Details
       

 08-30-2013
8.00
Forward floor pans and lower gear installed
Details
       

 08-29-2013
6.00
Forward insulation and floor pans install
Details
       

 08-28-2013
7.00
Step bolt access covers
Details
       

 08-28-2013
2.00
EAA Technical Advisor Review
Details
     

 08-27-2013
12.00
Forward skin rivet & mid cabin deck attach
Details
       

 08-26-2013
7.00
Forward skin and insulation
Details
       

 08-23-2013
8.00
R Side, mid section skin attach
Details
     

 08-22-2013
7.00
Mid section skin install
Details
       

 08-21-2013
10.00
Midsection sub structure assemble
Details
       

 08-19-2013
3.00
Epoxy paint midsection parts
Details

 08-16-2013
7.00
More prep for paint
Details
     

 08-15-2013
8.00
Fuse substructure and skin prep for prime paint
Details
       

 08-14-2013
9.00
Fuselage skin substructure
Details
       

 08-13-2013
10.00
Form tool, form forward skins
Details
       

 08-12-2013
9.00
Forming skin on midsection aft
Details
       

 08-09-2013
8.00
Shape longerons and roll mid section lower skin
Details
       

 08-08-2013
8.50
Attaching gear mount and shaping longerons
Details
       

 08-07-2013
8.00
Seat structure and gear mount fit up
Details
       

 08-06-2013
11.00
Forward and middle sections joined
Details
       

 08-05-2013
7.00
Assemble forward fuselage
Details
       

 07-26-2013
5.00
Insulation patterns and forward sub assemblies
Details
       

 07-25-2013
4.00
Forward section alumiprep, alodine and primed
Details
       

 07-24-2013
8.00
Final fitup and disassembly
Details
       

 07-23-2013
9.00
First bolt up of forward and middle sections
Details
       

 07-22-2013
7.00
Forward fuse sub assembly
Details
       

 07-21-2013
4.00
Misc Fabrication
Details
     

 07-20-2013
4.00
Firewall sub assembly
Details
       

 07-19-2013
5.00
Brake lines in tunnel
Details
       

 07-18-2013
4.00
Tunnel side... left and right rib assembly
Details
     

 07-17-2013
1.00
Flange duct install
Details
     

 07-13-2013
5.00
Firewall Polish
Details
       

 07-12-2013
7.00
Firewall Assemble
Details
       

 07-10-2013
4.00
Conduit run... prepping the ribs
Details
       

 07-10-2013
4.00
Conduit run - lightening hole preparation
Details
       

 07-09-2013
3.00
Firewall fitup
Details
       

 07-07-2013
4.00
COMM Antenna Base Mounting
Details
       

 06-29-2013
4.00
COM Antenna doubler
Details
       

 06-28-2013
8.00
Fuselage lower skin.
Details
       

 06-27-2013
8.00
Fuse rib attach
Details
       

 06-25-2013
8.00
Rib attach to rear spar
Details
       

 06-24-2013
7.00
Inboard seat rib subassembly
Details
       

 06-20-2013
4.00
Mid Fuse Bulkhead
Details
       

 06-20-2013
5.00
Mid Fuse Bulkhead
Details
       

 06-19-2013
8.00
Mid Fuse Bulkhead Assembly
Details
       

 06-18-2013
7.00
Mid Fuse Bulkhead Assembly
Details
       

 06-17-2013
8.00
Fuse Inventory
Details
       

 06-13-2013
4.00
Kit arrives
Details
     

 06-12-2013
5.00
Built Fuse Dolley
Details
     