KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
Work Logs Found: 20
Category Work Time: 39 Hours
 Date
Hours
Work Log Summary

Details

 10-19-2013
1.50
Added coolant and air filters to engine
Details
     

 09-15-2013
1.25
Purged oil into engine
Details
     

 08-30-2013
0.25
Temp Wired Oil Cooler to engine for test firing.

 06-09-2013
1.50
Installed Blasttube and Regulator Cooling Shroud
       

 06-09-2013
2.00
Finished install of oil cooler and repaired sensor
Details
     

 06-08-2013
1.00
Installed oil hoses up to step 6.
Details
       

 06-08-2013
0.25
Epoxy glued lable to inside of lower cowl
     

 06-08-2013
1.50
Added seals to cowl vent
Details
       

 06-07-2013
1.00
Added epoxy/flox to lower cowl gap
Details
     

 06-02-2013
0.25
Primed / debured / painted F-00002 Cooling Shroud

 06-02-2013
2.00
Epoxy/floxed cooling and interface ducts to cowl
Details
       

 06-01-2013
4.50
Fit the cooling duct to the lower cowl
Details
       

 05-31-2013
2.50
Installed oil cooler to cooler duct
Details
     

 05-30-2013
3.00
Completed install of heater door control cable
Details
       

 05-29-2013
1.50
Began installing heater door control cable
     

 05-28-2013
2.00
Installed heat exchanger and hoses
       

 05-26-2013
1.25
Completed oil cooler assembly
Details
       

 05-25-2013
5.00
Installed overflow bottle and began working on coo
Details
       

 05-24-2013
6.00
Installed cooling door and oil tank
Details
       

 05-22-2013
0.50
Installed springs into coolant hoses
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.