KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
Work Logs Found: 21
Category Work Time: 66 Hours
 Date
Hours
Work Log Summary

Details

 02-17-2019
5.00
Fuel probes get wired in.
Details
       

 02-16-2019
5.00
Alternator and regulator wiring
Details
       

 02-08-2019
4.00
More wiring done on the plane.
Details
       

 02-04-2019
4.00
Working on the electrical system.
Details
       

 04-16-2018
3.00
Bus bar for fire wall side.
Details
       

 03-26-2018
3.00
Wired in jumper and charger wires from the out sid
Details
       

 03-23-2018
4.00
Wire in starter relay and starter.
Details
       

 03-15-2018
6.00
Working on wiring in battery and main power.
Details
       

 03-15-2018
0.00
More on the wire work.
Details
       

 03-13-2018
8.00
Running more wire for defrost and power bars.
Details
       

 03-01-2018
4.00
Made power bar for positive and negative.
Details
       

 02-22-2018
4.00
Made landing rear switch panel
Details
     

 02-20-2018
3.00
Had to move avionics tray.
Details
       

 02-07-2018
4.00
Wiring the overhead lights and switches in.
Details
       

 04-20-2017
1.00
Wire from nose gear micro switch
Details
     

 01-05-2017
1.00
Install welding receptacles for charging and jumpi
Details
     

 01-03-2017
2.00
Welding plugs for external charging and jumping.
Details
       

 06-05-2013
1.00
Pushed in switches and bolted in place.
Details
     

 06-01-2013
1.50
Cut panel for swiches
Details
     

 05-31-2013
1.50
Ran wire for over head lights
Details
     

 05-22-2013
1.00
Swiches to make things brighter
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.