Powered By Kitlog Pro v2.0
RV-7
RV-7
Wings
Work Logs Found:
70
Category Work Time:
308 Hours
Date
Hours
Work Log Summary
Details
03-16-2020
4.00
Fuel tank flushing
Details
02-23-2020
4.00
Fit root fairings
Details
02-16-2020
7.00
Wing walk and wingtip tuneup
Details
02-01-2020
9.00
Wing fitup
Details
06-02-2019
4.50
Install wing tip lighting
Details
03-25-2017
2.00
Wingtip filling 6
Details
03-19-2017
2.00
Wingtip fitting 5
Details
03-05-2017
3.00
Wingtip fitting 4
Details
03-05-2017
3.00
Wingtip fitting 4
03-04-2017
3.00
Wingtip fitting 3
Details
02-26-2017
8.00
Wingtip fitting 2
Details
02-19-2017
7.00
Wingtip fitting 1
Details
03-12-2016
2.50
Wingtip filling 1
Details
10-11-2015
8.50
Install fuel tank brackets; adjust gap between top
Details
10-10-2015
9.00
Wing incidence setting and rear spar drilling
Details
10-04-2015
9.50
Left wing flap trimming
Details
10-03-2015
7.00
Left wing control surface alignmnet
Details
09-27-2015
7.00
Right wing control surface alignment
Details
09-26-2015
5.00
Initial install of the ailerons and flaps.
Details
07-20-2014
3.50
Installed right inboard bottom skin
Details
07-19-2014
3.50
Final prep of right wing for bottom skinning
Details
07-05-2014
5.50
Rivet on right top skin
Details
06-22-2014
6.50
Left outboard bottom skin riveting
Details
06-21-2014
6.00
Left inboard bottom skin riveting
Details
05-31-2014
5.00
Left wing internals
Details
04-05-2014
6.00
Finished up right aileron .. control surfaces done
Details
03-30-2014
2.00
Right aileron assembly and screw-up
Details
03-29-2014
6.00
Aileron assembly
Details
03-23-2014
6.50
Flaps done; ailerons in work
Details
03-22-2014
5.50
Flap assembly
Details
03-20-2014
1.50
Control surface riveting
Details
03-17-2014
0.50
Aileron and flap rivet prep
Details
03-16-2014
4.00
Aileron skin dimpling and priming
Details
02-09-2014
4.00
Finnished flap prep
Details
02-08-2014
4.00
Drilling the flaps
Details
02-02-2014
6.00
Attaching the flaps
Details
01-19-2014
6.00
L wing skin prep, aileron brackets
Details
01-18-2014
2.00
Prepping for L wing skin riveting
Details
01-12-2014
5.50
Finished left top skins; started ailerons
Details
01-11-2014
4.50
L wing top skins
Details
12-31-2013
4.50
Tank fitting and top skins cleco
Details
12-30-2013
3.00
Riveted topside LE to spar
Details
12-29-2013
3.50
Rivet right LE to spar
Details
12-28-2013
3.00
Stall warner and landing lights installed
Details
12-27-2013
4.50
Etch and prime skins
Details
12-24-2013
3.00
Drilling dimple relief countersinks in the spar
Details
12-23-2013
2.50
Main wing skin prep .. part 3
Details
12-22-2013
4.50
Main wing skin prep .. part 2
Details
12-21-2013
3.00
Main wing skin prep .. part 1
Details
12-14-2013
2.50
Assy the leading edges .. pt 2
Details
12-08-2013
6.00
Assy the leading edges .. pt 1
Details
12-07-2013
5.00
Prepping for LE riviting
Details
12-01-2013
1.50
Beginning LE dimpling
Details
09-07-2013
1.00
Drilling the LE and starting the tanks
Details
09-02-2013
6.00
Left outboard leading edge
Details
09-01-2013
2.00
Fitting the right bottom skins
Details
08-31-2013
2.50
Fitting the left bottom skins
Details
08-30-2013
2.50
Fittng the top skins
Details
08-24-2013
6.50
Buildup of wing skeleton
Details
08-18-2013
6.00
Wing rib prep and priming
Details
08-17-2013
10.00
First box assembly
Details
08-12-2013
2.00
Flat ribs!
Details
08-11-2013
2.00
Rear wing spar fitout
Details
08-03-2013
2.00
Wing tiedown hardware install
Details
07-31-2013
2.00
Tiedown mounts
Details
07-28-2013
2.00
Spar nutplates done
Details
07-27-2013
8.00
Back to work!
Details
07-25-2013
2.50
Let the wing build begin!
Details
07-13-2013
6.00
Wing stand
Details
04-30-2013
0.00
Wing kit on order!
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2025 Matronics. All Rights Reserved.