Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lightning (EAB-LSA)
Canopy
Work Logs Found:
34
Category Work Time:
53 Hours
Date
Hours
Work Log Summary
Details
02-09-2015
1.50
repair cracks at alignment tabs
Details
01-26-2015
2.50
super fill to canopy - pull off
Details
01-26-2015
1.00
adhere front canopy seal with silicon adhesive
01-19-2015
2.00
prep for micro to canopy flange
01-19-2015
2.25
micro to canopy flange - pass #1
Details
01-19-2015
0.00
gaps before bodywork - for reference
Details
12-24-2014
2.00
prep canopy for bodywork needed
Details
12-24-2014
3.00
2 BID applied; fill thickness measured
11-03-2014
2.00
prep foam and canopy frame
Details
11-03-2014
2.75
add 2 BID skirt around canopy frame
Details
10-06-2014
2.50
trim foam and add superfill; cut FG BID various si
Details
09-08-2014
0.50
trim foam with hacksaw blade
Details
08-25-2014
1.50
prep and bond canopy
Details
08-25-2014
1.50
canopy pics (cont'd)
08-25-2014
0.50
add expanding foam to channel in canopy frame
Details
08-18-2014
1.25
sand i/s edge of canopy for bonding
Details
08-11-2014
1.50
tape off inside and outside edges
Details
08-11-2014
1.00
pull outside 3" of plastic, inside and out
Details
08-11-2014
1.00
latch handle; nyloc nuts for struts
08-11-2014
0.50
grind out clearance for latch; super glue latch in
Details
08-11-2014
2.50
fit, mark, trim cut and repeat
Details
08-11-2014
0.75
drill latch hole; fit handle to fuselage
08-04-2014
1.00
fine tune back of hinge to fit at fuselage - took
08-04-2014
1.25
fab and install strike plates
08-04-2014
1.50
drill and fit latch block; flox in
08-04-2014
1.50
canopy struts to frame and fuselage
Details
07-21-2014
0.00
flox in canopy hinge backing plates
07-21-2014
3.00
fab and install hinges to canopy frame
Details
07-21-2014
0.00
canopy frame fit .. getting there
07-21-2014
2.50
canopy fit cont'd
07-21-2014
5.25
canopy fit and research
Details
04-29-2013
0.25
measurements for canopy hinges - to fit AFS 5500
Details
04-29-2013
1.25
install canopy hinges; AN3 A's various lenghts
04-29-2013
1.25
fabricate hinge brackets; research placement
Details
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Category
# Logs
# Hours
All
428
4066
Avionics
5
163
Canopy
34
53
Controls
2
4
Cowling
24
48
Electrical
2
36
Elevators
21
60
Engine
6
86
Firewall forward
42
163
Fuselage
107
1070
Gear and wheels
31
196
Horizontal Stab
22
148
Miscellaneous
19
298
Move
21
60
Paint
7
973
Prop
3
13
Research, prep shop,
1
1
Rudder
4
7
Shop Supplies
1
0
Tools
1
2
Vert Stab - Rudder
1
166
Wings
70
393
Wiring
4
126
Lancair Super ES Home
Copyright © 2001-2024 Matronics. All Rights Reserved.