KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 146
Category Work Time: 354 Hours
 Date
Hours
Work Log Summary

Details

 09-17-2014
1.50
Sanded the Awl Fair Around the Oil Door
Details

 09-13-2014
2.00
Fitting Oil Door to Cowling
Details
       

 09-12-2014
2.00
Fit Oil Door to Cowling
Details
       

 08-03-2014
6.00
Sanded the Cowling and Squeeged Epoxy Layers
Details
       

 07-31-2014
2.50
Installed a Latch In the Oil Door
Details

 07-30-2014
2.00
Creating Cowling Oil Access Door
Details
       

 07-06-2014
0.50
Sprayed UV Smooth Prime on the Cowling Halves
Details
       

 07-06-2014
4.00
More Wet Sanding of the Cowling
Details

 07-04-2014
4.00
Wet Sanded Cowling Epoxy Layers
Details
     

 03-06-2014
2.00
Sanded the Interior Around the Glued NACA Vents
Details

 03-05-2014
1.50
Glued the NACA Ducts to the Left Cowling Half
Details

 03-04-2014
3.00
Engine Intake NACA Openings Cut in Lt Cowl Half
Details
       

 03-03-2014
2.00
Planning Preparation for Engine Intake Inlets
Details

 02-23-2014
2.00
Sanding Cowling/Avionics Setup
Details

 02-22-2014
2.00
Sanding Cowling/Avionics Setup
Details

 02-20-2014
1.50
Sanding Cowling/Avionics Setup
Details

 02-18-2014
2.00
Worked on Setup/Programming of the Avionics
Details

 02-13-2014
0.50
Awl Fair to Part of Left Cowling
Details
       

 02-13-2014
2.00
Awl Fair Applied to Right Cowling Half
       

 10-09-2013
3.00
Split and Fit Cowling Oil Cooler Duct
Details
       

 10-08-2013
1.00
Attached Oil Cooler Duct Section to Cowling Inlet
Details
       

 10-02-2013
1.50
Re-attached/Reinforced Coolant Ducts
Details
       

 09-21-2013
2.00
Assembled the Cowl Flap Bearings
Details
       

 09-17-2013
0.50
Drilled Hole in Lip Above Oil Cooler Inlet for Nut
Details

 09-16-2013
2.00
Fine Sanding of the Right Cowling Front Side
Details

 09-15-2013
1.00
Glass Tacked the Radiator Duct to Glass Box
Details

 09-14-2013
1.00
Riveted the Cowl Flap Hinge to Cowling
Details
       

 09-14-2013
1.00
Made a Glass Box on the Interior of the Radiators
Details
     

 09-14-2013
1.00
Glassed a Lip Across the Cowling Split
Details
     

 09-14-2013
1.00
Attached Stiffeners to the Cowl Flap Opening
Details
       

 09-13-2013
1.50
Glassed the Cooling Duct to the Cowling Opening
Details
       

 09-12-2013
3.00
Applied Glass to Forward End of Cooling Ducts
Details
       

 09-10-2013
3.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details
       

 09-09-2013
3.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details

 09-08-2013
4.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details
       

 09-07-2013
3.00
Installing Honeycomb to the Cowling Interior
Details
       

 09-06-2013
3.00
Applied Nomex Honeycomb to the Cowling Interior
Details
       

 09-04-2013
6.00
Applied One Layer 9 Oz Glass to Cowling Interior
Details
     

 09-03-2013
3.00
Sanded the Interior of the Cowling
Details
       

 09-02-2013
3.50
Witness Sanded the Cowling and Re-applied Micro
Details

 08-31-2013
1.50
Sanding the Oil Cooler Inlet Shape
Details
       

 08-30-2013
2.00
Sanding Oil Cooler Inlet and Left Bottom of Cowlin
Details

 08-29-2013
2.00
Fit the Cowl Flap to the Cowling
Details
       

 08-28-2013
2.00
Washed Fiberglass Dust Off of Aircraft
Details
       

 08-27-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-26-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-25-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-24-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-23-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-22-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-21-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-20-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-19-2013
5.00
Sanded the Top, Front Cone and Sides
Details
       

 08-18-2013
3.00
Installed Three Skybolts on Lower Front of Cowling
Details
       

 08-18-2013
0.00
Cowling Bottom Front Skybolts in Place
Details
       

 08-17-2013
4.00
Drilled the Cowling Holes for the Skybolt Fastener
Details
       

 08-16-2013
2.00
Sanded the Nose Ring and Re-applied Micro
Details
       

 08-15-2013
0.50
Sanded the Cowling Level with the Firewall
Details
     

 08-15-2013
3.00
Installed the Firewall Skybolt Fasteners
Details
       

 08-15-2013
1.00
Applied 2 Layers of Glass to the Cowling Nose Ring
Details
       

 08-14-2013
2.00
Tacked the Cowling Nose Ring to the Cowling
Details
       

 08-13-2013
3.00
Made a Form for Making a New Cowling Nose Ring
Details
       

 08-13-2013
1.00
Layed Some Glass Mat on Cowling Rt Firewall Edge
Details
       

 08-12-2013
1.50
Reinforced the Cowling Firewall Edge
Details

 08-11-2013
2.00
Applied UV Smooth Prime to Empennage Fairings
Details

 08-10-2013
1.00
Sanded and Re-applied Micro to Rt Side of Cowling
Details

 08-09-2013
3.00
Worked on the Fit on Both Side of the Cowling
Details
       

 08-08-2013
4.00
Applied Micro to Cowling Right Aft Lower Corner
Details
       

 08-07-2013
3.00
Altered the Fit of Cowling Right Lower Aft Corner
Details
     

 08-06-2013
6.00
Cut the Cowling Aft Edge To Match the Firewall
Details
       

 08-05-2013
4.00
Drilled & Riveted Skybolt Brackets to the Firewall
Details

 08-04-2013
0.50
Started to Position the Skybolt Fastener Brackets
Details
     

 07-24-2013
2.00
Fine Sanding of Cowling on the Aircraft.
Details

 07-23-2013
2.00
Continued Sanding the Cowling Off of the Aircraft
Details

 07-22-2013
2.50
Sanded the Bottom Front of the Cowling
Details

 07-20-2013
2.50
Sanding of the Front of the Cowling
Details

 07-19-2013
1.00
Lightly Sanded the Front Outboard of the Inlets
Details

 07-18-2013
3.00
Sanded the Front of the Cowling
Details

 07-17-2013
3.00
More Sanding of the Cowling Top
Details

 07-15-2013
4.00
Sanded Cowling Top and Front with Fine Sponge
Details

 07-14-2013
3.00
Rough Sanded Micro on about 2/3 of Cowling
Details

 07-13-2013
2.00
Applied Micro Over the Entire Cowling Top & Sides
Details
       

 07-12-2013
3.00
Fine Sanded Micro on Entire Cowling Top
Details
     

 07-11-2013
3.00
Fine Sanded the Right Forward Corner
Details

 07-10-2013
4.00
Sanded the Cowling Top, Re-applied Light Micro
Details

 07-09-2013
3.00
Sanded the Cowling Top and Re-applied Micro
Details
       

 07-08-2013
2.00
Sanded Cowling Top Forward Corner
Details
       

 07-06-2013
1.50
Sanded the Top and Sides of the Cowling
Details
       

 07-04-2013
2.00
Installed the Flanges and Pins for the Skybolts
Details
       

 07-03-2013
6.00
Sanded Cowling and Installed Skybolt Fasteners
Details
     

 07-02-2013
8.00
Sanded the Front and Sides of the Cowling
Details
       

 07-01-2013
2.00
Sanded Left Side and Bottom of the Cowling
Details

 06-30-2013
3.00
Sanded and Re-Applied Filler
Details

 06-29-2013
3.00
Sanded and Re-Applied Filler
Details

 06-28-2013
2.50
Sanded the Contour of the Cowling Forward Bottom
Details

 06-27-2013
3.00
Sanded Cowling Bottom and Forward Corners
Details

 06-26-2013
4.00
Sanded the Right Forward Bottom Corner
Details
       

 06-25-2013
3.00
Sanded the Bottom Forward Corners of the Cowling
Details

 06-24-2013
3.00
Sanded the Bottom Forward Corners of the Cowling
Details
       

 06-20-2013
3.00
Sanded Cowling Bottom and Forward Corners
Details

 06-18-2013
3.00
Cut and Removed the Forward Half of the Hinge
Details
       

 06-17-2013
2.00
Installed the Hinge in the Bottom of the Cowling
Details
     

 06-15-2013
3.00
Sanded Hinge Edges While on the Aircraft
Details
       

 06-14-2013
1.00
Applied Micro/Flox/Epoxy to Bottom Hinge Lines
Details
       

 06-13-2013
5.00
Glassed Cooling Inlet Flanges
Details
       

 06-12-2013
2.50
Cut Opening for the Cowl Flap
Details
       

 06-11-2013
2.00
Glassed the Bottom Centerline With 3 Plys of Glass
Details
       

 06-10-2013
1.00
Applied 9 Oz. 8 Harness Glass to Oil Cooler Inlet
Details
       

 06-09-2013
4.00
Sanded Micro on Oil Cooler Inlet
Details
       

 06-08-2013
5.00
Shaping Oil Cooler Inlet
Details
       

 06-07-2013
6.00
Sanding and Fitting Oil Cooler Inlet Box
Details

 06-06-2013
4.00
Shaped Oil Cooler Inlet Box Form
Details
       

 06-05-2013
5.00
Cut, Sanded and Shaped the Oil Cooler Inlet Plug
Details
     

 06-04-2013
2.00
Glued Layers of Pink Styrofoam Sheet Together
Details

 06-03-2013
1.50
Drilled Attachment Holes for the Oil Cooler Duct
Details

 06-02-2013
1.00
Built up the Oil Cooler Duct Flange with 9 oz glas
Details

 06-01-2013
2.00
Riveted the Hinge Half to the Left Cowling Half To
Details
       

 05-31-2013
2.00
Drilled the Left Cowling Half Top Hinge to Cowling
Details
       

 05-30-2013
2.00
Cut and Sanded the Left Cowling Top Center Line
Details
     

 05-27-2013
2.00
Attached Hinge Half to the Right Cowling Half
Details
     

 05-26-2013
2.00
Cut Right Cowling Half Top Center Line Edge
Details
     

 05-25-2013
1.50
Applied 3 More Layers of Glass to the Front Corner
Details
     

 05-24-2013
3.50
Applied Clay to Cowling Front Bottom Corners
Details

 05-23-2013
1.50
Installed Aluminum Strips for Backing to Corners
Details
       

 05-22-2013
3.00
Worked on Right Side Bottom Relieving Stresses
Details
       

 05-21-2013
3.00
Worked on Shaping the Bottom Front Of Cowling
Details
       

 05-20-2013
3.00
Re-did the Left Cowling Opening Using Styrofoam
Details
       

 05-18-2013
2.00
Cut and Sanded the Foam, Applies Clay and Micro
Details
       

 05-17-2013
1.00
Used Spray Foam to Fill the Void for Shaping
Details
     

 05-16-2013
2.00
Cut the Left Side From Firewall to Front Corner
Details
     

 05-15-2013
2.00
Centerline Split the Bottom of the Cowling
Details
       

 05-14-2013
3.00
Applied 3 Layers of Glass to the Cowling Bottom
Details

 05-13-2013
3.00
Finished Molding Clay, Applied 2 Ply 9 oz Glass
Details
       

 05-12-2013
4.00
Cut Front Bottom Cowling, Installed Foam Sheets
Details

 05-10-2013
3.00
Layed 2 Ply 9oz Glass Transverse the Cowl Bottom
Details
       

 05-10-2013
1.50
Apply 2 ply 9oz Glass to Cowling Aft Bottom
Details
       

 05-09-2013
1.50
Shaped the Foam Frame for the Cowling Bottom
Details
     

 05-07-2013
1.00
Assembled Foam Framing to Shape Cowling Bottom
Details
       

 05-05-2013
1.00
Made Some Relief Cuts in the Cowling Bottom
Details
       

 05-02-2013
2.00
Got the Cowling Sides Attached to the Firewall
Details
       

 05-02-2013
0.00
Got the Cowling Sides Attached to the Firewall
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
4.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 04-26-2013
2.00
Made a 13.5" Prop Disc for Mounting the Cowling
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.