Powered By Kitlog Pro v2.0
Brians Pietenpol Web Site
Tear drop camper
Tear sides
Work Logs Found:
10
Category Work Time:
14 Hours
Date
Hours
Work Log Summary
Details
08-01-2012
0.00
Fergie posing with her handy work.
Details
07-31-2012
2.00
Sides bolted and secured to trailer
Details
07-29-2012
0.50
Gluing up carpet and cutting door hole
Details
07-29-2012
1.50
Glued carpet to to interior of trailer sides
Details
07-28-2012
1.00
Cutting door holes
Details
07-22-2012
2.00
Test fitting the sides
Details
07-21-2012
3.00
Next step cutting doors
Details
07-20-2012
2.50
Cutting sides for the tear
Details
11-26-2011
1.00
Designing tear sides
Details
10-22-2011
1.00
Working on the Tear drop sides
Details
SITE NAVIGATION
Contact Builder
F-19 Sportsman Home
Tear drop camper Home
Category
# Logs
# Hours
All
35
68
Frame
6
10
Tear drop
5
13
Tear floor
3
6
Tear galley
2
6
Tear Interior
3
4
Tear roof
6
15
Tear sides
10
14
Air camper Home
Copyright © 2001-2025 Matronics. All Rights Reserved.