Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Interior
Work Logs Found:
52
Category Work Time:
192 Hours
Date
Hours
Work Log Summary
Details
03-11-2024
4.00
ZOLATON PAINT APOLLO GRAY to replace the vinyl
Details
02-15-2024
4.00
Remove vinyl and prime interior.
Details
04-16-2019
2.00
Made side panels to cover cables and wires.
Details
04-15-2019
3.00
Door panels got vinyl.
Details
03-13-2019
4.00
I finished the vinyl and installed the vanity pane
Details
03-12-2019
4.00
All the vanity pieces are done and ready to go in.
Details
03-09-2019
4.00
Armrest had the USB’s installed.
Details
03-08-2019
3.00
Painted window trim and touch up in the fuselage.
Details
03-07-2019
6.00
More vinyl on the fuselage sides.
Details
03-06-2019
8.00
Armrest done and fuselage side gets vinyl.
Details
03-04-2019
5.00
Vinyl on vanity panel and prep fuselage
Details
03-01-2019
10.00
Vinyl on Pilot side strake baggage area done.
Details
02-26-2019
4.00
Sanded and primed armrest. Vinyl on strake baggage
Details
02-25-2019
7.00
Trim box finished. Headliner was installed.
Details
02-25-2019
0.00
Interior paint on trim box.
Details
02-24-2019
5.00
Trim box has primer and armrest in place for flang
Details
02-21-2019
3.00
Template for arm rest, cardboard was used to form
Details
02-20-2019
3.00
Trim box trimmed and 2 bids on it for mounting fla
Details
02-18-2019
2.00
Time to make a box for the roll trim motor.
Details
03-24-2018
2.00
Worked on the shifter boot for the stick.
Details
03-05-2018
4.00
Finished defrost on glare shield.
Details
02-27-2018
3.00
Defrost out lets for glare shield.
Details
02-25-2018
2.00
3 bids lay-up for stick and rod to elevators boots
Details
06-04-2017
6.00
Paint some of the interior.
Details
06-01-2017
3.00
Made covers for door micro switches.
Details
05-25-2017
2.00
Prep and paint canard bulk head.
Details
04-10-2017
3.00
Cover plates for bolt holes or access holes.
Details
02-01-2017
4.00
Tabs, anchor nuts, and mount panel. 3 bid on holes
Details
01-31-2017
4.00
Clean up edges and add aluminum tabs
Details
01-30-2017
4.00
Trim and add 1 bid on all the sides of the panel p
Details
01-27-2017
5.00
Anchor nuts and 3 bids on vertical panel
Details
01-26-2017
6.00
Fit vertical back panel and anchor nuts
Details
01-25-2017
7.00
Clean up peaces, make and flox in mounting bracket
Details
01-24-2017
6.00
Glass vertical sides and load brace for luggage sh
Details
01-23-2017
5.00
Glass in Vanity side panels
Details
01-22-2017
4.00
Working on sides to back Vanity panel
Details
01-20-2017
3.00
Glassed in back rear cover panel bottom (Vanity)
Details
01-19-2017
3.00
Work on the bottom part of the back cover panel
Details
01-17-2017
1.00
Lay-up on rear cover panel items
Details
01-16-2017
2.00
Bid on foam for rear cover panel
Details
01-14-2017
4.00
Trim, sand, drill, and mount window frames.
Details
01-10-2017
6.00
Made window frames with 4 bids of fiber glass
Details
01-04-2017
1.00
Working on window frames
Details
01-17-2016
2.00
Other side of back cover panel
Details
01-16-2016
2.00
Interior rear cover panel
Details
11-07-2014
2.00
Interior door cover
Details
06-05-2014
3.00
Cut and fit front window trim
Details
06-05-2014
3.00
Cut and fit front window trim
Details
05-26-2014
1.00
Remove back panel and work on gas fittings
Details
05-20-2014
4.50
Front wind shield trim
Details
05-13-2014
1.00
Interior back panel
Details
04-04-2013
2.00
Work on back seats
Details
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.