KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
Work Logs Found: 26
Category Work Time: 38 Hours
 Date
Hours
Work Log Summary

Details

 05-12-2020
1.00
Install Suntail Light
Details
     

 05-24-2013
0.50
Rivet Corrugation Nut Plates, Wear Blocks
Details
     

 05-23-2013
1.40
Prime Baggage Corrugation, Aileron Trim Parts
Details
       

 05-22-2013
0.60
Rivet Baggage Bulkhead Nut Plates
Details
       

 05-22-2013
1.70
Prepare Baggage Corrugation for Priming
Details
       

 05-21-2013
1.00
Rivet Right Baggage Area Cover
Details
       

 05-21-2013
0.80
Locate and Drill Nut Plate Mounts
Details
       

 05-20-2013
1.10
Rivet Lower, Upper Baggage Door Seal Channels
Details
       

 05-20-2013
2.10
Baggage Bulkhead Corrugation
Details
       

 05-20-2013
0.80
Baggage Bulkhead Channel, Forward Top Skin
Details
       

 05-19-2013
2.00
Rivet Baggage Floor, Fabricate Wear Blocks, Hinge
Details
       

 05-19-2013
1.80
Rivet Baggage Floor
Details
       

 05-18-2013
1.30
Prepare to Rivet Seat & Baggage Floors
Details
       

 05-18-2013
0.70
Enlarge Step Bolt Access Holes
Details

 04-22-2013
2.00
Baggage Area Insulation
Details
       

 04-21-2013
0.90
Install Baggage Area Access Panel
Details
       

 04-21-2013
0.30
Install Antenna Doublers
Details
       

 04-21-2013
2.10
Electrical Conduits
Details
       

 04-21-2013
1.50
Baggage Area Insulation
Details
       

 04-20-2013
2.50
Prime Baggage area Parts
Details
     

 04-15-2013
3.20
Fabricate Antenna Access in Seat Floors
Details
       

 04-14-2013
1.50
Baggage Area Floors
Details

 04-13-2013
1.50
Fabricate Antenna Doubler
Details
       

 04-09-2013
2.00
Fabricate Antenna Doubler
Details
       

 04-09-2013
1.00
Baggage Door Seal Channels
Details
       

 04-08-2013
2.30
Baggage Floors, Seat Hinge, Door Channel
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.