Powered By Kitlog Pro v2.0
My RV-8 Project
RV-8
Firewall Forward
Work Logs Found:
30
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
01-14-2014
2.00
Plenum lid
Details
01-12-2014
2.00
Spark plug wire routing
Details
01-10-2014
2.00
Bottom baffle safety wiring
Details
12-28-2013
1.00
Crankcase evacutation valve
Details
12-22-2013
6.00
Air Oil Separator install and G3X GPS antenna
Details
12-02-2013
8.00
Intake install day 3
Details
11-27-2013
5.00
Intake install day 2
Details
11-23-2013
6.00
Intake install day 1
Details
11-16-2013
3.00
Plenum day 5
Details
11-13-2013
4.00
Oil cooler mount
Details
11-02-2013
5.00
Plenum day 3
Details
11-01-2013
5.00
Plenum day 2
Details
10-29-2013
4.00
Plenum day 1
Details
10-28-2013
5.00
Baffles day 5
Details
10-23-2013
4.00
Baffles day 4
Details
10-20-2013
4.00
Baffles day 3
Details
10-19-2013
4.00
Baffles day 2
Details
10-16-2013
5.00
Baffles day 1
Details
09-07-2013
3.00
Mixture control bracket
Details
09-06-2013
4.00
Throttle cable bracket
Details
08-20-2013
3.00
Heater and Oil Cooler control cables
Details
08-16-2013
3.00
Installed Voltage regulator
Details
08-03-2013
3.00
More engine wiring
Details
07-31-2013
3.00
FWF wiring
Details
07-29-2013
2.00
Pmag install
Details
07-23-2013
1.00
Governor line
Details
07-22-2013
3.00
Installed Jihostrag governor for whirlwind prop
Details
06-29-2013
2.00
Vetterman Exhaust installed
Details
04-05-2013
1.00
Engine Mount Continued
Details
04-02-2013
0.50
Engine Mount
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
239
854
Avionics
52
158
Canopy
26
105
Cowl
9
43
Electrical
28
89
Empennage
7
27
Engine
11
35
Firewall Forward
30
104
Fuel System
3
8
Fuselage
49
174
Gear
10
58
Oxygen System
1
4
Prop
1
2
Shop Supplies
3
5
Wings
9
42
Copyright © 2001-2024 Matronics. All Rights Reserved.