Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lightning (EAB-LSA)
Elevators
Work Logs Found:
21
Category Work Time:
38 Hours
Date
Hours
Work Log Summary
Details
08-18-2014
2.75
sand and superfill #1
Details
05-18-2014
1.50
rivit R side hinges with new. shorter grip SS rivi
Details
05-18-2014
0.50
redo o/s L hinge with shorter grip 3/16" SS rivits
Details
05-12-2014
0.50
drill out o/s L hinge; flox holes for redo
Details
05-11-2014
3.00
L side elevators to HS
05-11-2014
2.50
hinges rivited in
Details
05-05-2014
3.00
square TE of HS
05-05-2014
3.00
elevators hinges - continued
04-29-2013
3.00
modify trim tab hinge; prep and s/f elev. and ligh
Details
04-21-2013
0.50
modify hinge for trim tab
Details
04-21-2013
2.50
micro to close out elev and trim tab
04-21-2013
2.50
grind and sand micro on tabs and around hinge
Details
04-21-2013
0.25
fit servo and cover after c/s cover holes
04-08-2013
2.50
trim motor fit, nutplates, rivnuts & cover
04-08-2013
0.00
fit and match drill servo cover; install rivnuts
Details
04-07-2013
0.00
trim to fit
04-07-2013
2.50
fab, fit and flox in trim tab horn
04-07-2013
2.50
clean up hinges at trim tab, clean out pins
Details
04-01-2013
1.75
grind out, prep and flox in trim tab hinges
04-01-2013
2.00
elev trim
Details
04-01-2013
1.75
design flange and flox in
Details
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Category
# Logs
# Hours
All
428
4066
Avionics
5
163
Canopy
34
53
Controls
2
4
Cowling
24
48
Electrical
2
36
Elevators
21
60
Engine
6
86
Firewall forward
42
163
Fuselage
107
1070
Gear and wheels
31
196
Horizontal Stab
22
148
Miscellaneous
19
298
Move
21
60
Paint
7
973
Prop
3
13
Research, prep shop,
1
1
Rudder
4
7
Shop Supplies
1
0
Tools
1
2
Vert Stab - Rudder
1
166
Wings
70
393
Wiring
4
126
Lancair Super ES Home
Copyright © 2001-2024 Matronics. All Rights Reserved.