KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 21
Category Work Time: 38 Hours
 Date
Hours
Work Log Summary

Details

 08-18-2014
2.75
sand and superfill #1
Details
       

 05-18-2014
1.50
rivit R side hinges with new. shorter grip SS rivi
Details
       

 05-18-2014
0.50
redo o/s L hinge with shorter grip 3/16" SS rivits
Details
       

 05-12-2014
0.50
drill out o/s L hinge; flox holes for redo
Details
       

 05-11-2014
3.00
L side elevators to HS
       

 05-11-2014
2.50
hinges rivited in
Details
       

 05-05-2014
3.00
square TE of HS
       

 05-05-2014
3.00
elevators hinges - continued
       

 04-29-2013
3.00
modify trim tab hinge; prep and s/f elev. and ligh
Details
       

 04-21-2013
0.50
modify hinge for trim tab
Details
       

 04-21-2013
2.50
micro to close out elev and trim tab
       

 04-21-2013
2.50
grind and sand micro on tabs and around hinge
Details
       

 04-21-2013
0.25
fit servo and cover after c/s cover holes
       

 04-08-2013
2.50
trim motor fit, nutplates, rivnuts & cover
       

 04-08-2013
0.00
fit and match drill servo cover; install rivnuts
Details
       

 04-07-2013
0.00
trim to fit
       

 04-07-2013
2.50
fab, fit and flox in trim tab horn
       

 04-07-2013
2.50
clean up hinges at trim tab, clean out pins
Details
       

 04-01-2013
1.75
grind out, prep and flox in trim tab hinges
       

 04-01-2013
2.00
elev trim
Details
       

 04-01-2013
1.75
design flange and flox in
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.