Kurt Haller RV-9A
Work Logs Found: 22
Category Work Time: 98 Hours
 Date
Hours
Work Log Summary

Details

 08-04-2019
0.00
Back-up EFIS install
Details
     

 07-17-2019
0.00
Remove SV-1000 screen
Details
       

 05-05-2019
0.00
ACK auxiliary batteries
Details
       

 12-30-2018
2.50
Zero p IAS.AOA cal; attitude check
Details
       

 12-28-2018
8.00
Static/pitot leaks resolved & misc jobs
Details
       

 12-08-2018
4.00
Temp probes and static leaks
Details

 09-22-2018
1.50
Pitot/Static Leak test
Details
       

 07-03-2017
5.50
Installed roll servo
Details
       

 10-15-2016
1.50
Stick grip switches
Details
       

 06-18-2015
0.00
Glareshield dimmer; terminal strip
Details
       

 04-12-2015
0.00
Wiring the ADAHRS units
Details
       

 02-09-2015
0.00
RG400 cable fabrication
Details
     

 01-12-2015
2.00
ELT/Static line routing
Details

 01-10-2015
8.00
TXPNDR wiring/GPS antenna doubler prep
Details

 01-04-2015
9.00
ELT GPS signal test, ELT & ADAHRS installed
Details

 01-03-2015
20.00
Antenna doublers
Details
     

 12-29-2014
6.00
Fabricated ELT/ADS-B shelf
Details
       

 12-28-2014
9.00
Designed ELT/ADS-B in shelf
Details

 12-26-2014
7.50
TXPNDR shelf
Details
       

 11-26-2012
3.30
Finishing the ADAHRS tray
Details

 11-18-2012
2.00
Solder-cup DB9 to elevator trim servo
Details

 11-17-2012
8.00
DB9 connector dwgs for electric trim
Details