KitLog pro

Powered By Kitlog Pro v2.0

Andrew's RV10
Work Logs Found: 22
Category Work Time: 85 Hours
 Date
Hours
Work Log Summary

Details

 04-07-2017
1.00
SB 16-03-28 compliance
Details
       

 04-07-2017
1.00
SB 16-03-28 Compliance
Details
       

 01-16-2017
4.00
Wing Root Fairing
Details
       

 07-06-2016
3.00
Fitting FLYLEDs to wingtip
     

 03-06-2015
10.00
Wing tips
Details
       

 03-22-2014
15.00
Rivet Wing Skins
Details
       

 03-22-2014
2.00
Completed Wing Skin pictures
       

 03-21-2014
2.00
Gretz Pitot Mast doubler / cut-out
Details
       

 03-21-2014
2.00
Gretz Pitot Mast doubler / cut-out
       

 03-14-2014
7.00
Aileron Push Tubes
Details
       

 02-17-2014
4.00
Deburr, Dimple and Prime Lower Wing Skinks
       

 02-07-2014
3.00
Final Drilling Lower Wing Skins
       

 01-10-2014
10.00
Installing Duckworks Leading Edge Kit
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-07-2014
1.00
Duckworks LED Leading Edge Light Kit
Details
       

 11-26-2013
5.00
Flap and Aileron gap farings
       

 11-26-2013
2.00
Flap and Aileron gap fairings
       

 11-15-2013
4.00
Wiring Conduit
Details
     

 03-15-2013
5.00
Wing Cradle Construction
Details
       

 03-14-2013
1.00
Quickbuild wings arrived
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.