Powered By Kitlog Pro v2.0
Marks Web Site
Glastar GLST
Avionics Panel
Work Logs Found:
74
Category Work Time:
254 Hours
Date
Hours
Work Log Summary
Details
05-26-2005
5.00
Instercom / Radio work switches
05-25-2005
5.50
Flow Master fix - windshield final fit
05-24-2005
4.50
Intercom Sqwaks fixed new Mag sensors
05-17-2005
3.50
Scale pickup - door latches, gelcoat
05-14-2005
4.00
flap seals
05-13-2005
3.50
Cable connections
05-12-2005
3.50
Static lines installed- Flap handel redo
05-10-2005
3.50
Adjust Flaps and Prop pitch
05-04-2005
8.50
Solution to DEC A- Bad crank sensor fnd
05-03-2005
6.50
Cowling picked up, mount prop test
05-02-2005
6.50
Trouble shoot - egt, diodes on Panel #2
05-01-2005
4.50
Trouble shoot Panel #2
04-25-2005
5.50
Trouble shoot engine - Top windows
04-24-2005
2.50
Re-wire engine tach clock/Windows top
04-23-2005
5.50
STARTED ENGINE TODAY
04-22-2005
4.00
Re-Wire QD fittings engine side
04-21-2005
6.50
Install 8awg wires into CTS main
04-20-2005
5.50
CAP ECU Pre Mounting/DFU Power
04-19-2005
6.50
Mount COMPUTERS and QD Firewall
04-18-2005
8.00
Wire QD-1 and others, Static work/ GPS
04-17-2005
5.00
Wire CTS #1 & #2
04-16-2005
5.50
Wire CTS #4 and #3
04-15-2005
6.50
Wire CTS #5
04-14-2005
3.30
Hard mount panel to frame, rout wires
04-13-2005
4.00
Install Panel Relay tray
04-12-2005
2.00
Install Panel in plane
03-24-2005
2.50
Strobe lights attached to Wing Tips
03-19-2005
1.00
re-wire panel #2 SW-3
03-15-2005
2.00
Amp-Seal Connectors
03-13-2005
2.50
Wire AMP-SEAL Connectors
03-06-2005
5.00
rework NSI Panel #6 and check relays
03-05-2005
5.50
Re-wire Panel #2 with updates
01-16-2005
3.50
Completed Tunnel wires / Control wires
01-15-2005
2.50
Strobe Power wires
01-13-2005
2.50
Install Battery Rack
01-11-2005
3.50
Battery Area install
01-10-2005
3.50
Battery Tray
01-08-2005
2.50
Work on Battery Tray
01-05-2005
1.50
Floor Board Adjustments
01-04-2005
2.50
Panel # 3 Wiring
01-03-2005
5.50
Re-wire
12-19-2004
2.00
Rewire per new Drwg's
12-15-2004
1.50
Review drawings
12-13-2004
4.50
Working on New Drwg's CB panel
12-12-2004
2.00
Re-Wired to new drwgs 11/21/04 set
12-09-2004
2.00
Reviewed NEW NSI DRAWINGS Nov21
12-08-2004
2.50
Wiring #6
12-07-2004
1.50
Wire Panel #6
12-04-2004
2.50
Wired the rest of the relay's
11-17-2004
1.50
Mount GPS Antenna
11-15-2004
1.00
Panel #6 wiring
11-12-2004
3.50
Radio rack assy / Fitting
11-11-2004
1.50
Tested GTX327 and GNC300XL on/off
11-06-2004
3.20
Wiring Relay's
11-04-2004
2.00
Wire Relays
11-04-2004
1.50
Wire Relays
11-02-2004
2.20
Wire Relays
11-01-2004
2.00
Outside Vortex's and wire to fuel sensor
10-31-2004
3.00
CTS #7 and co-pilot handle
10-30-2004
1.00
Completed Right CTS box
10-28-2004
3.50
Complete Left CTS, Cut Right CTS Box
10-27-2004
2.20
Install tray #2 - Top left CTS #2 Fit
10-24-2004
3.50
Panel #1 finished wiring
10-23-2004
1.50
Glass in Ext mag Compass wires
10-22-2004
3.50
Dynon Temp and Ext mag install
10-20-2004
3.00
Wiring of Panel #5 and #1
10-19-2004
2.50
Panel Wiring Insert #5
10-18-2004
2.50
Panel Wiring
10-17-2004
4.00
Finished Panel #2 Wiring
10-15-2004
3.00
Wire Panel #2
10-13-2004
2.50
Panel #2 wiring
08-26-2004
2.00
Inserts #2,4,5
08-25-2004
2.00
Install Nutplates on Dash
08-24-2004
2.50
Prime and Paint Panel
SITE NAVIGATION
Contact Builder
Glastar GLST Home
Category
# Logs
# Hours
All
403
1235
Aileron
8
30
Avionics Panel
74
254
Cowling
15
36
Elevator
6
36
Engine2.5
6
9
FAA Docs
2
4
Final Assy
93
263
Firewall Forward
6
13
Flaps
17
51
Freight
1
0
Fuselage Assy
30
73
Hanger Prep
6
44
Horizontal Stabilizer
10
34
Inspections
5
10
KitPickup
4
8
Left Wing
4
15
Paint
13
27
Plane Kit
1
2
Right Wing
21
73
Rudder
7
26
System Install
34
99
Tools
1
2
Trim Tab
4
12
Tunnel Work
6
14
Wings
29
100
Copyright © 2001-2024 Matronics. All Rights Reserved.