KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
Work Logs Found: 74
Category Work Time: 254 Hours
 Date
Hours
Work Log Summary

Details

 05-26-2005
5.00
Instercom / Radio work switches

 05-25-2005
5.50
Flow Master fix - windshield final fit

 05-24-2005
4.50
Intercom Sqwaks fixed new Mag sensors

 05-17-2005
3.50
Scale pickup - door latches, gelcoat

 05-14-2005
4.00
flap seals

 05-13-2005
3.50
Cable connections

 05-12-2005
3.50
Static lines installed- Flap handel redo

 05-10-2005
3.50
Adjust Flaps and Prop pitch

 05-04-2005
8.50
Solution to DEC A- Bad crank sensor fnd

 05-03-2005
6.50
Cowling picked up, mount prop test

 05-02-2005
6.50
Trouble shoot - egt, diodes on Panel #2

 05-01-2005
4.50
Trouble shoot Panel #2

 04-25-2005
5.50
Trouble shoot engine - Top windows

 04-24-2005
2.50
Re-wire engine tach clock/Windows top

 04-23-2005
5.50
STARTED ENGINE TODAY

 04-22-2005
4.00
Re-Wire QD fittings engine side

 04-21-2005
6.50
Install 8awg wires into CTS main

 04-20-2005
5.50
CAP ECU Pre Mounting/DFU Power

 04-19-2005
6.50
Mount COMPUTERS and QD Firewall

 04-18-2005
8.00
Wire QD-1 and others, Static work/ GPS

 04-17-2005
5.00
Wire CTS #1 & #2

 04-16-2005
5.50
Wire CTS #4 and #3

 04-15-2005
6.50
Wire CTS #5

 04-14-2005
3.30
Hard mount panel to frame, rout wires

 04-13-2005
4.00
Install Panel Relay tray

 04-12-2005
2.00
Install Panel in plane

 03-24-2005
2.50
Strobe lights attached to Wing Tips

 03-19-2005
1.00
re-wire panel #2 SW-3

 03-15-2005
2.00
Amp-Seal Connectors

 03-13-2005
2.50
Wire AMP-SEAL Connectors

 03-06-2005
5.00
rework NSI Panel #6 and check relays

 03-05-2005
5.50
Re-wire Panel #2 with updates

 01-16-2005
3.50
Completed Tunnel wires / Control wires

 01-15-2005
2.50
Strobe Power wires

 01-13-2005
2.50
Install Battery Rack

 01-11-2005
3.50
Battery Area install

 01-10-2005
3.50
Battery Tray

 01-08-2005
2.50
Work on Battery Tray

 01-05-2005
1.50
Floor Board Adjustments

 01-04-2005
2.50
Panel # 3 Wiring

 01-03-2005
5.50
Re-wire

 12-19-2004
2.00
Rewire per new Drwg's

 12-15-2004
1.50
Review drawings

 12-13-2004
4.50
Working on New Drwg's CB panel

 12-12-2004
2.00
Re-Wired to new drwgs 11/21/04 set

 12-09-2004
2.00
Reviewed NEW NSI DRAWINGS Nov21

 12-08-2004
2.50
Wiring #6

 12-07-2004
1.50
Wire Panel #6

 12-04-2004
2.50
Wired the rest of the relay's

 11-17-2004
1.50
Mount GPS Antenna

 11-15-2004
1.00
Panel #6 wiring

 11-12-2004
3.50
Radio rack assy / Fitting

 11-11-2004
1.50
Tested GTX327 and GNC300XL on/off

 11-06-2004
3.20
Wiring Relay's

 11-04-2004
2.00
Wire Relays

 11-04-2004
1.50
Wire Relays

 11-02-2004
2.20
Wire Relays

 11-01-2004
2.00
Outside Vortex's and wire to fuel sensor

 10-31-2004
3.00
CTS #7 and co-pilot handle

 10-30-2004
1.00
Completed Right CTS box

 10-28-2004
3.50
Complete Left CTS, Cut Right CTS Box

 10-27-2004
2.20
Install tray #2 - Top left CTS #2 Fit

 10-24-2004
3.50
Panel #1 finished wiring

 10-23-2004
1.50
Glass in Ext mag Compass wires

 10-22-2004
3.50
Dynon Temp and Ext mag install

 10-20-2004
3.00
Wiring of Panel #5 and #1

 10-19-2004
2.50
Panel Wiring Insert #5

 10-18-2004
2.50
Panel Wiring

 10-17-2004
4.00
Finished Panel #2 Wiring

 10-15-2004
3.00
Wire Panel #2

 10-13-2004
2.50
Panel #2 wiring

 08-26-2004
2.00
Inserts #2,4,5

 08-25-2004
2.00
Install Nutplates on Dash

 08-24-2004
2.50
Prime and Paint Panel










Copyright © 2001-2024 Matronics. All Rights Reserved.