KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
Work Logs Found: 93
Category Work Time: 263 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2005
4.00
Put Elevator on Plane - 88R

 06-05-2005
2.50
Move plane to Spicewood Airport

 06-05-2005
2.50
Clean up few details. cowling, dr pulls,

 06-01-2005
6.50
Elev wgts, change oil, drs on,

 05-31-2005
6.50
Seats in, Rear Bulkhead attached, winds

 05-30-2005
4.50
Seat Rails and Seat Belts Installed

 05-29-2005
5.50
Final Wire check / fittings / Windshield

 05-28-2005
3.50
Install Windshield Final

 05-23-2005
5.50
Glare shield. mag sensors dimmer

 05-22-2005
3.50
Fitting of front Window / Spinner work

 05-21-2005
3.50
Weight and Balance

 05-11-2005
3.00
Rudder and flap seals

 05-09-2005
4.50
Letters on Plane - Rudder attached Final

 05-08-2005
3.50
Door windows installed

 05-07-2005
5.00
Place Flaps ailerons back on Plane

 04-26-2005
2.50
Side windows install

 04-25-2005
2.50
Prep of side windows / Sulpruf Sides

 04-07-2005
1.00
Strobe lights assy on wintips

 02-07-2005
2.50
Prep work for PAINT- WINGS

 02-03-2005
1.00
Left leg fairing completed

 02-02-2005
4.50
Left gear leg Fairings

 02-01-2005
2.50
Work on lower leg fairings

 01-31-2005
2.50
Work on lower leg fairngs

 01-26-2005
1.50
Prime Co-Pilot inside door

 10-01-2004
2.00
Right wing wires routing/tunnel

 09-20-2004
1.00
Hand Sand gel-coat on strake

 09-18-2004
2.50
Spray White Gel-coat on Tail

 09-17-2004
2.50
Spray Gelcoat on Air-Vents and others

 09-16-2004
2.00
Side air-vents Bondo/Sand

 09-15-2004
1.50
Handle holes w/Bondo fill/sand

 08-22-2004
2.50
Door Springs and final latch fittings

 08-07-2004
3.50
Door tabs install'd

 08-06-2004
1.50
Pull plastic off rudder/hStab, elevator

 08-02-2004
2.60
Q-cell door hinges in place

 08-01-2004
3.50
Dill out door hinges/placement

 07-31-2004
2.90
Fitting of front leg faring

 07-19-2004
1.50
Stick control handle assy

 07-18-2004
2.00
Fit baggage door locks

 07-17-2004
2.50
Fitting of doors / hinges

 07-16-2004
3.00
Door toggle pieces mgf'd

 07-15-2004
4.00
Fab all door latch pieces / prime

 06-16-2004
2.50
Wing-tip glassed together

 06-05-2004
3.00
Aft Fuselage supports glassed in

 06-04-2004
1.50
Wing fuselage cloase-out - Fitting/Glass

 06-03-2004
2.00
Wing fuselage close-out glass work

 05-31-2004
1.00
Flex Gas hose connections to tanks

 05-30-2004
2.50
Gas Tank Fittings cut-outs on Fuse

 05-16-2004
2.50
Install Aileron counter wgts on wings

 05-15-2004
3.50
Install Flaps on Wings - Final

 05-15-2004
1.20
Install Cove inspection plates on Wings

 05-14-2004
1.00
Cove skin inspection plates

 05-10-2004
2.00
Rivet right wing cove skins

 05-09-2004
2.25
Prime amnd Rivet Left wing cove skings

 05-08-2004
1.50
Install Pitot and Vent line in Left wing

 05-05-2004
1.00
Expanded wings in Hanger

 04-25-2004
1.50
Rudder attach pts for wing brace

 04-22-2004
1.50
ELT antenna mounting

 03-28-2004
1.00
Put wings on

 03-22-2004
2.50
Wing cove skins drilling

 03-21-2004
2.50
Wing cove skins drilling

 02-28-2004
2.50
Top skin left wing- outbd ruvet

 02-25-2004
4.50
Left wing prep- hat sections

 02-24-2004
5.50
Prep Left Wing- route air vent/cables

 02-23-2004
4.50
Cut rgt vent/glass wire wing

 02-22-2004
1.50
Cut-out left air vent

 02-21-2004
2.90
Finished Rgt Top skins/tank

 02-20-2004
4.00
Work on top skins riveting

 02-10-2004
4.00
Work on Left wing

 02-09-2004
4.00
Rgt Wing Vent routing

 02-08-2004
2.00
Close in Strakes on Leading edge

 02-07-2004
6.80
Hortz Stab Completed, firewall, rudder

 02-06-2004
5.50
Horztl stab rivets - hinge pins

 01-26-2004
2.00
Right Strake resin'd to plane

 01-25-2004
3.50
Strake Assy onto Fuselage

 01-25-2004
1.00
Glue on Strake Left side

 01-24-2004
2.50
Wingtip Elevator Nutplates

 01-22-2004
3.50
Elevator Wing tips / Carbon Fiber

 01-21-2004
2.50
Srake Position assy

 01-13-2004
2.00
Header Tanks installed

 01-11-2004
5.00
Painted Floorboards, Transpdr antenna-

 01-10-2004
2.50
Front cable cover - left and right

 01-09-2004
3.50
Brake Line install'd -Dash Bd Prep

 01-08-2004
5.50
Rivet Firewall assy together

 01-07-2004
3.50
Work on Firewall Assy - Fitting

 11-30-2003
1.80
Rear luggage Door assy

 11-19-2003
1.50
Install front wheel pant

 11-18-2003
0.50
Font wheel pant glass work

 11-13-2003
4.00
Install Wheel pants- Fitting and assy

 11-12-2003
2.00
Gear wheel pants - bulkheads and support

 11-11-2003
1.50
Glass wheel pant skins together

 11-08-2003
1.20
Elevator Stop Installed

 10-20-2003
2.50
Install seat pans - Fitting

 10-18-2003
1.00
Cutout Bulkhead A Cover










Copyright © 2001-2024 Matronics. All Rights Reserved.