KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
Work Logs Found: 34
Category Work Time: 99 Hours
 Date
Hours
Work Log Summary

Details

 12-07-2003
5.50
Fitting Gas Tanks Right wing - Hat sec's

 11-08-2003
4.00
Pitot Tube Bracket Assy

 11-06-2003
5.00
Drill Main gears

 11-05-2003
6.00
Fit and Position Main Landing Gear

 11-04-2003
5.50
Pulled Wings Off. Ailerons and Flaps

 11-03-2003
6.50
NicoPress Left Aileron/pitot

 11-02-2003
6.00
FLAP ADJUST Aileron NicoPress

 10-28-2003
1.00
Cable Covers

 10-26-2003
1.50
Adjust Aileron cables

 10-18-2003
1.00
Fit Aileron aft cables

 10-16-2003
3.50
Install Flap cables

 10-15-2003
1.00
NicoPress empanage cables - all 4

 10-14-2003
2.00
Install Ailerons and connecting rods

 10-13-2003
0.70
Install Flap conecting rods

 10-12-2003
3.00
Install both FLAPS - Left Aileron

 10-11-2003
1.50
Set wing angle of incidence

 10-11-2003
4.50
Drill upper wing strut holes

 10-10-2003
2.00
Wing Strut location - Drill lowers

 10-09-2003
1.50
Clean Hanger and relocate wing suppots

 10-08-2003
2.00
Mount wings to Fuselage

 10-07-2003
1.50
Drilled out front Landing gear- @ Don's

 09-28-2003
5.00
Assemble Rudder pedals

 09-26-2003
1.60
Install Elevator Pushrod to Elev.

 09-26-2003
4.60
Install Cables rudder and Elev

 09-26-2003
2.30
Fab Elevator Pushrod

 09-23-2003
2.50
Fabricate rudder pedal brackets steel

 09-23-2003
3.50
Fab and Install Bulk A pulleys

 09-22-2003
3.50
install Forward pulleys

 09-21-2003
2.50
Install lower / Aft pulleys

 09-21-2003
2.00
Fabricate Rudder pedals

 09-21-2003
1.50
Assemble elev/aileron controls

 09-20-2003
1.00
install lower forward pulleys

 09-20-2003
1.50
Install Flap handle

 09-18-2003
2.50
Fabricate rudder control supports










Copyright © 2001-2024 Matronics. All Rights Reserved.