Date
|
Hours
|
Work Log Summary
|
Details
|
06-02-2004
|
0.50
|
Rear tie-down support glass work
|
|
|
|
10-08-2003
|
3.50
|
Fitted fonrt landing gear to frame
|
|
|
|
10-05-2003
|
2.00
|
Position and Drill lower shell angles
|
|
|
|
10-04-2003
|
3.50
|
Fuselage side supports installed
|
|
|
|
09-25-2003
|
3.50
|
Placement of 4 empanage cables routed
|
|
|
|
09-24-2003
|
3.00
|
Install Rudder actuator left and right -
|
|
|
|
09-23-2003
|
1.50
|
install fuselage struts
|
|
|
|
09-17-2003
|
1.90
|
Cut-out aft inter-bulkhd shearweb
|
|
|
|
09-16-2003
|
2.60
|
Install HStab to attach brckt
|
|
|
|
09-16-2003
|
3.50
|
Aft inter buckhead drilled and fitted
|
|
|
|
09-15-2003
|
4.50
|
Work on Bulkhead E fitting
|
|
|
|
09-15-2003
|
1.50
|
Install forwd sherweb attach angles
|
|
|
|
09-14-2003
|
3.60
|
Laminate aft flange for inter-bulkhd
|
|
|
|
09-14-2003
|
2.50
|
Drill inspection hole in Lower Aft
|
|
|
|
09-13-2003
|
2.50
|
Position & Drill HStab bracket
|
|
|
|
09-13-2003
|
1.25
|
Cut-out fuselage for Hstab fit
|
|
|
|
09-12-2003
|
1.00
|
Rivet Rudder stop to Yoke
|
|
|
|
09-11-2003
|
0.50
|
Install elevator bellcrank to bracket
|
|
|
|
09-10-2003
|
1.75
|
Prep Elevator Bellcrank
|
|
|
|
09-09-2003
|
2.20
|
Rudder control stop plate fitted
|
|
|
|
09-09-2003
|
1.60
|
Install Stop plate to yoke
|
|
|
|
09-08-2003
|
5.00
|
Hang Rudder, sand to fit, sand to fit
|
|
|
|
09-06-2003
|
2.00
|
Rivet Vertical Spar
|
|
|
|
09-05-2003
|
2.00
|
Install Vertical Spar Resin Bed
|
|
|
|
09-05-2003
|
1.50
|
Attach Door handle angles with bushings
|
|
|
|
09-04-2003
|
5.50
|
Work on Rudder Vertical Spar fittings
|
|
|
|
09-04-2003
|
1.50
|
Mark the Fuslage water LINE
|
|
|
|
09-04-2003
|
3.50
|
Install forward shell attach fittings
|
|
|
|
09-03-2003
|
1.60
|
Position and drill aft shell fittings
|
|
|
|
09-01-2003
|
2.50
|
Fitting Fabrication- Shell angles
|
|
|