Powered By Kitlog Pro v2.0
Marks Web Site
Glastar GLST
Right Wing
Work Logs Found:
21
Category Work Time:
73 Hours
Date
Hours
Work Log Summary
Details
09-13-2003
7.50
Right wing smal rivets- hat sections
09-09-2003
2.00
Rivet Right wing - Rib and hard spors
09-08-2003
3.00
Rivet .125" on Lower spar
08-19-2003
6.50
Prep Hat sections & rivet Main Spar lowr
08-18-2003
6.50
Rivet Nose Rib Assy to Front Spar
08-16-2003
1.50
DeBur and Prime Skins
08-13-2003
2.00
Rivet Aft spar componets
08-12-2003
2.50
Dimple, Prime, Prep
08-11-2003
2.00
Dimple, Prime Nose Ribs
08-10-2003
1.50
Dimple
08-09-2003
6.00
Countersink front main rib, Rib 1 work
07-28-2003
3.50
Drill all brackets locations on Aft
07-27-2003
4.50
Drill all #30's on skins both sides
07-26-2003
6.00
Position and Drill HAT sections / Prep
07-25-2003
2.25
Drill Lower CAP section and prep Hat's
07-21-2003
3.50
Drill Bottom Skins all three
07-20-2003
3.00
Work on Main Rib 1, Strut beam Drill
07-18-2003
1.50
Drilled out rest of L.E. and Nose ribs
07-17-2003
3.00
Drill Right L/E and nose ribs
07-16-2003
1.50
Place top leading edges w/pilot holes
07-14-2003
3.00
Place in jig and attach ribs/drill out30
SITE NAVIGATION
Contact Builder
Glastar GLST Home
Category
# Logs
# Hours
All
403
1235
Aileron
8
30
Avionics Panel
74
254
Cowling
15
36
Elevator
6
36
Engine2.5
6
9
FAA Docs
2
4
Final Assy
93
263
Firewall Forward
6
13
Flaps
17
51
Freight
1
0
Fuselage Assy
30
73
Hanger Prep
6
44
Horizontal Stabilizer
10
34
Inspections
5
10
KitPickup
4
8
Left Wing
4
15
Paint
13
27
Plane Kit
1
2
Right Wing
21
73
Rudder
7
26
System Install
34
99
Tools
1
2
Trim Tab
4
12
Tunnel Work
6
14
Wings
29
100
Copyright © 2001-2024 Matronics. All Rights Reserved.