KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
Work Logs Found: 103
Category Work Time: 219 Hours
 Date
Hours
Work Log Summary

Details

 08-23-2020
2.00
EFII Controller Wiring
Details

 08-22-2020
2.30
EFII Controller Wiring
Details

 07-19-2020
3.00
Install Wingtips
Details

 07-17-2020
4.00
Install Wingtips
Details

 07-05-2020
3.50
Spar Bolts, Wing Root Wiring, Taxi Lights
Details
       

 05-25-2020
2.90
Install Stick Grip Wiring
Details
     

 05-24-2020
3.30
Install Charge/Jump Port, Stick Grip Wiring
Details

 05-19-2020
3.40
G3X Discrete Wiring
Details

 05-18-2020
2.00
Install Battery Retainer
Details
       

 05-18-2020
1.50
Install Battery Cables
Details
       

 04-29-2020
1.40
Install Temperature Probe Wiring
Details

 04-28-2020
2.50
Install Temperature Probe Wiring
Details

 04-26-2020
1.60
Heat Valve Controllers
Details

 08-16-2019
2.30
Install Overhead Switch Panel Wiring
Details
     

 08-14-2019
2.10
Install Overhead Switch Panel Wiring
Details
       

 08-08-2019
2.50
Install Overhead Switch Panel Wiring
Details
       

 08-07-2019
2.00
Fabricate PCB for Overhead Switch Panel
Details
       

 07-27-2019
2.20
Install Overhead Console Wiring
Details
       

 06-16-2019
1.50
Install Overhead Console Panel Inserts
Details
       

 06-03-2019
2.00
Install Overhead Console Wiring, Cowling
Details

 06-02-2019
4.00
Overhead Console Wiring, Sand and Seal Cowling
Details
       

 05-14-2019
3.00
Install Overhead Lighting
Details
       

 05-13-2019
1.50
Install Overhead Panel Lighting
Details
       

 05-05-2019
2.00
Install Overhead Console Lighting
Details
       

 05-04-2019
1.80
Install Overhead Lighting
Details

 04-27-2019
2.70
Install Baggage, Overhead Lighting
Details
       

 04-26-2019
2.70
Install Baggage Area Lights
Details
       

 04-18-2019
3.40
Install Baggae Compartment Lights, Seal Windshield
Details
       

 02-19-2019
1.00
Install Garmin GEA 24 Harness
Details

 02-16-2019
1.30
Install Garmin GEA 24 Harness
Details

 02-09-2019
1.50
Install Garmin GEA 24 Harness
Details
     

 02-03-2019
2.30
Install EFII Harness
Details

 01-28-2019
0.80
Install EFII Harness
Details
       

 01-28-2019
1.20
Install EFII Harness
Details

 01-27-2019
3.00
Install EFII Harness
Details
       

 01-26-2019
2.70
Install EFII Harness
Details
       

 01-25-2019
3.00
Install EFII Harness
Details

 01-24-2019
3.50
Install EFII Harness
Details
       

 01-23-2019
3.30
Fabricate Loom Supports
Details
     

 01-21-2019
2.70
Install EFII Harness
Details

 01-19-2019
2.00
Install EFII Harness
Details
       

 01-18-2019
2.50
Install Wiring
Details

 01-16-2019
1.90
Install Wiring
Details

 01-13-2019
1.00
Install Wiring
Details

 01-12-2019
2.00
Wiring
Details
     

 01-11-2019
3.00
Install Servo Controller, Overhead Wiring
Details
       

 01-10-2019
2.00
Install Servo Controller, Wiring
Details

 01-09-2019
1.50
Install Servo Controller
Details

 01-08-2019
1.50
Install Servo Controller, Fans
Details

 01-07-2019
1.50
Install Servo Valve Controller
Details

 01-06-2019
2.00
Install Servo Controller
Details

 01-02-2019
1.50
Fabricate Loom Supports
Details
     

 12-20-2018
2.00
Install Garmin GEA 24 Harness
Details
       

 12-16-2018
1.70
Install System 32 EFII Harness
Details
     

 12-15-2018
3.50
Install EFII System 32 Harness
Details
       

 12-14-2018
2.00
Install EFII System 32 Harness
Details

 12-14-2018
1.20
Install EFII System 32 Harness
Details

 10-30-2018
1.00
Install Panel Ground Bus
Details
     

 10-26-2018
2.50
Install Main, Essential Bus Bars
Details
       

 10-26-2018
1.50
Install Fuel Pump Relay
Details
       

 10-15-2018
2.90
Install Bus Manager
Details
       

 10-13-2018
1.60
Install Bus Manager
Details
       

 10-09-2018
2.50
Install Bus Manager
Details
     

 10-07-2018
1.60
Install Backbone Wiring
Details
     

 09-30-2018
2.50
Install Battery Tray, Servo Mounts
Details
       

 09-10-2018
1.00
Install Main Ground Bus
Details
     

 08-12-2018
2.00
Install Door Warning Wiring
Details

 08-11-2018
1.50
Install Backbone Wiring
Details
       

 08-11-2018
1.00
Install Backbone Wiring
Details
       

 08-06-2018
2.00
Install Backbone Wiring
Details
       

 08-05-2018
2.30
Install Backbone Wiring
Details
       

 08-04-2018
1.20
Install Conduit Supports
Details
       

 08-03-2018
3.10
Install Backbone Wiring
Details
       

 08-02-2018
1.40
Install Backbone Wiring
Details
       

 07-06-2018
6.00
Install Main DC Contactor Deck
Details
       

 07-03-2018
1.20
Install Alternator Wiring
Details
       

 07-01-2018
3.80
Modify Battery Mount
Details
       

 06-30-2018
2.90
Install Main Altenator Shunt, Aux Alternator
Details
       

 06-24-2018
2.40
Install Firewall Wiring
Details
       

 06-22-2018
2.00
Install Alternator B Lead
Details
       

 06-18-2018
1.40
Install Main Alternator Wiring
Details
       

 06-17-2018
6.00
Heavy Cable Wiring
Details
       

 03-09-2018
1.40
Install Chafe Protectors on Actuator Wires
Details

 02-28-2018
1.00
Fabricate Linear Actuator Wiring
Details

 06-01-2017
1.00
Install Fresh Air Valve Wiring
Details

 05-12-2017
3.00
Install Pitch Trim Assembly, Wiring
Details

 02-21-2015
0.40
Install Flap Position Sensor Arm
Details
       

 02-02-2015
1.20
Install Flap Position Sensor
Details
       

 02-01-2015
0.40
Fabricate Flap Position Sensor Mount
Details

 01-26-2015
1.30
Install Flap Position Sensor
Details
       

 10-28-2014
2.00
Route Conduits Through Sidewall
Details
       

 10-01-2014
2.00
Fabricate Left Side Wire Cover
Details
     

 09-28-2014
3.40
Install Main Starter Cable and Ground
Details
       

 09-27-2014
0.50
Rivet Power Post Doublers
Details
       

 09-27-2014
1.20
Install Main Starter Cable
Details
     

 09-23-2014
1.20
Install Power Posts
Details

 09-19-2014
2.20
Install Power Post in Firewall
Details
       

 09-19-2014
1.70
Fabricate Power Post Doublers
Details
     

 05-10-2014
1.00
Install Main Ground Wire
Details

 05-03-2013
1.00
Reroute Fuselage Conduits
Details
       

 05-02-2013
3.00
Install Fuselage Conduit
Details
       

 05-01-2013
3.60
Fabricate Conduit Brackets, Install Conduit
Details
       

 03-07-2013
1.00
Mount and Wire Elevator Trim Servo
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.