Powered By Kitlog Pro v2.0
Alaskan Bearhawk
Bearhawk
Fuel System
Work Logs Found:
29
Category Work Time:
87 Hours
Date
Hours
Work Log Summary
Details
04-17-2024
2.00
SPRL Fuel Valve Seal Flaw
Details
08-09-2023
1.00
Pressure Test
Details
03-05-2021
2.00
Leak testing!
Details
05-05-2020
2.00
Aux Tank to Pump Connection
Details
05-02-2020
2.00
Fuel Tank Grounding Wire
Details
04-23-2020
0.50
Fuel Tank Cross Vent Part 7
Details
04-19-2020
8.00
Fuel Tank Cross Vent Part 6
Details
04-18-2020
0.50
Fuel Tank Cross Vent Part 6
Details
04-18-2020
4.00
Fuel Tank Cross Vent Part 5
Details
04-15-2020
3.00
Fuel Tank Cross Vent Part 3
Details
04-13-2020
2.00
Fuel Tank Strap Bolts Safety Wire
Details
04-11-2020
6.00
Fuel Tank Cross Vent Part 4
Details
04-06-2020
1.00
Fuel System Overview
Details
04-05-2020
5.00
Fuel Line Clamps Part 2
Details
04-04-2020
8.00
Fuel Line Clamps Part 1
Details
03-28-2020
2.00
Fuel Tank Cross Vent Part 2
Details
03-27-2020
3.00
Fuel Valve Floor Mount
Details
03-25-2020
3.00
Fuel Sight Gages Part 3
Details
03-14-2020
1.00
Fuel Filler Necks Part 3
Details
03-14-2020
4.00
Aux Fuel Line Reducers
Details
03-09-2020
4.00
Fuel Tank Cross Vent and Grounding tab
Details
03-07-2020
8.00
Fuel Filler Necks Part 2
Details
02-09-2020
2.00
Fuel Filler Necks Part 1
Details
12-15-2019
2.00
Aft fuel linel sumps Part 2
Details
12-11-2019
4.00
Aft fuel linel sumps Part 1
Details
03-05-2017
2.00
Fuel Sight Gages Part 2
Details
03-04-2017
2.50
Fuel Sight Gages Part 1
Details
02-24-2017
2.00
Tank Straps
Details
03-04-2013
0.50
New Tanks!
Details
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
1409
4384
Avionics
23
61
Electrical
29
80
Empennage
167
416
Engine
141
499
Fabric
67
187
Flight Controls
57
148
Floats
31
125
Fuel System
29
87
Fuselage
380
1150
Hardware
4
16
Instruments
26
80
Interior
94
280
Miscellaneous
10
64
Paint
131
518
Prop
1
1
Tools
26
107
Welding
5
13
Wheels/Landing Gear
50
114
Wheels/Landing Gear/
50
114
Wings
88
324
Copyright © 2001-2024 Matronics. All Rights Reserved.