KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
Work Logs Found: 85
Category Work Time: 172 Hours
 Date
Hours
Work Log Summary

Details

 09-03-2014
1.00
Placed Al adhesive sheet inside lower cowl
Details
     

 08-17-2014
1.00
Sanded outside of air intake
Details

 06-21-2014
1.00
Sand/smooth lower cowl bulge
Details

 06-17-2014
1.00
Lower cowl bulge
Details

 06-15-2014
1.00
Lower cowl bulge work
Details

 06-04-2014
4.00
Fiberglassed lower cowl bulge
Details

 04-27-2014
2.50
Air inlet
Details

 04-26-2014
1.50
Continue work on air inlet
Details

 04-24-2014
2.50
Airbox inlet
Details

 04-23-2014
2.00
Glassed Air inlet
Details
     

 04-20-2014
1.00
Removed foam in engine air inlet
Details
     

 04-19-2014
2.00
Finished elephant ears
Details
       

 04-18-2014
1.00
Elephant ears again
Details

 04-16-2014
2.50
Air box
Details

 04-11-2014
2.00
Air box
Details

 04-09-2014
3.00
Air box
Details
       

 04-08-2014
3.00
Finished elephant ears
Details
     

 04-06-2014
2.00
Elephant ears
Details
       

 04-05-2014
1.50
Elephant ears
Details
       

 04-02-2014
2.00
Trim and fit of cowl
Details

 03-30-2014
1.00
Continue aft extension
Details

 03-28-2014
0.50
Continue aft cowl extension
Details

 03-26-2014
1.50
Extend aft cowl
Details

 03-23-2014
3.00
Completed oil door
Details
     

 03-19-2014
3.50
Fit and epoxied upper forward inlets, fit oil door
Details

 08-09-2013
1.50
Started making forward cover plate
Details

 08-08-2013
1.00
Bolted outlet brace
Details

 07-30-2013
1.00
Assembled air outlet brace
Details

 07-28-2013
6.50
Made air outlet brace
Details
     

 07-21-2013
3.00
Installed from nutplates
Details
       

 07-20-2013
2.00
Cowl re-fitting
Details

 07-17-2013
2.00
Cowl work
Details

 07-16-2013
1.00
Epoxied lower cowl
Details

 07-15-2013
1.00
Finished sanding lower cowl
Details

 07-13-2013
3.00
More sanding, lower cowl
Details

 07-12-2013
4.00
Upper and lower cowl, more epoxy
Details

 07-10-2013
2.00
Upper cowl work
Details
     

 07-09-2013
1.50
Sand, reinforce lower cowl
Details

 07-07-2013
2.00
Sand lower cowl
Details

 07-04-2013
2.00
Sand lower cowl
Details

 06-29-2013
2.00
Upper cowl
Details

 06-27-2013
1.50
Sand upper cowl
Details

 06-26-2013
2.50
Upper cowl outside surface
Details
       

 06-25-2013
1.00
Sealed inside of lower cowl
Details

 06-25-2013
1.00
Riveted hinge strips on upper cowl
Details

 06-24-2013
1.50
Riveted hinges
Details

 06-23-2013
3.50
Sand and alodine
Details

 06-23-2013
1.50
Epoxied hinge strips
Details
     

 06-22-2013
3.00
Sealed lower cowl, sanded upper
Details
     

 06-22-2013
3.00
Sanded upper cowl, lower cowl
Details

 06-22-2013
2.00
2nd epoxy seal, scuff/drill hinges
Details

 06-19-2013
3.00
Upper/lower cowl epoxy seal
Details

 06-19-2013
3.00
Upper cowl epoxy seal
Details
     

 06-18-2013
1.50
Trimmed gap between halves
Details

 06-16-2013
3.00
Finished upper cowl Skybolt fasteners
Details
       

 06-15-2013
2.00
Started upper cowl Skybolt fasteners
Details

 06-14-2013
1.00
Finished all Skybolt fasteners on lower cowl
Details
     

 06-13-2013
3.00
Finished installing Skybolts on lower sides
Details
       

 06-11-2013
1.00
Finished lower cowl drilling for Skybolt
Details

 06-10-2013
1.00
More Skybolt work
Details
       

 06-09-2013
3.00
Right side hinge, Skybolt fasteners
Details
       

 06-08-2013
2.00
Started right hinge
Details

 06-06-2013
1.00
Drilled holes for lower left hinge strip
Details
       

 06-05-2013
4.00
Tentative location of left horiz hinge
Details
       

 06-04-2013
1.00
Top and bottom fit
Details

 06-03-2013
1.00
More fitting
Details
       

 06-02-2013
2.50
Top/bottom cowl trimming
Details
       

 06-01-2013
1.50
More cowl fitting
Details

 05-25-2013
1.50
More cowl fitting
Details

 05-24-2013
1.00
More cowl fitting
Details

 05-23-2013
2.00
Back to fitting cowl.
Details

 05-12-2013
1.50
More cowl fitting
Details
       

 05-11-2013
2.00
More cowl fitting
Details

 05-08-2013
4.00
Oil door and more fitting/trimming
Details
       

 05-07-2013
1.50
Cowl fitting
Details
       

 05-06-2013
1.00
Removed some Skybolt flanges
Details

 05-05-2013
2.00
Riveted and fit remaining Skybolt flanges
Details

 05-04-2013
5.00
Lower cowl and Skybolt flange work
Details
       

 05-01-2013
2.00
Bottom cowl and oil door
Details

 04-27-2013
4.00
Started fitting top/bottom
Details
       

 04-27-2013
0.00
Cowl fitting, continued from previous entry.
     

 04-24-2013
1.50
Cut oil door opening in top cowl
Details
     

 03-29-2013
1.50
Cut slot for nose gear
Details
     

 03-01-2013
2.50
Countersunk and alodined Skybolt flanges
Details

 02-28-2013
1.50
Deburred flanges from Skybolt.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.