Work Logs Found: 49
Category Work Time: 122 Hours
 Date
Hours
Work Log Summary

Details

 01-25-2016
2.00
Reassemble elevators onto canard
Details
       

 01-15-2016
2.00
Soldered eyelets on the ends of the rods
Details
     

 01-14-2016
5.00
Holding hinges for Dog house were installed
Details
       

 01-05-2016
1.00
More work on the dog house hinges
Details
     

 01-03-2016
3.00
Sand level dog house area for hinges then cut free
Details
       

 01-02-2016
2.00
Sand and apply one more coat of micro
Details
       

 01-01-2016
4.00
Worked on filling gaps and dog house
Details
       

 12-26-2015
3.00
Clean up bid and sand clean
Details
       

 12-25-2015
2.00
One bid on elevator end and dog house bottom
Details
       

 12-24-2015
2.00
2 bid on inside of dog house @ canard.
Details
       

 12-22-2015
2.00
Dog house is to wide at canard and needs to come i
Details
       

 12-13-2015
8.00
Fit canard to plane, reinstall speed brake, work o
Details
       

 12-10-2015
3.00
Level elevators and drill weight holes. Set up pla
Details
       

 12-08-2015
4.00
Assembled elevators to canard
Details
       

 11-30-2015
1.00
Glass in canard top tip
Details
       

 11-26-2015
2.00
Weight wells and elevator end clean up
Details
       

 11-24-2015
3.00
Weight wells and elevator ends
Details
       

 11-22-2015
4.00
Sand around hinge arms and install torque tubes
Details
       

 11-21-2015
2.00
Positioning torque / Counter weight Arm
Details
       

 11-20-2015
3.00
Micro in hinge arms tonight
Details
       

 11-19-2015
4.00
Hinge arm installation and set up
Details
       

 11-17-2015
2.00
Elevator hinge installation
Details
       

 11-16-2015
4.00
Hinge work from elevator to Canard
Details
       

 05-17-2015
1.00
Resin work on trailing edge of elevators
Details
     

 05-16-2015
2.00
Fix air voids and delaminating in elevator
Details
       

 03-16-2015
1.00
Fuselage and dog house clean up
Details
       

 03-14-2015
4.00
Getting the dog house sanded to clearances
Details
       

 03-10-2015
2.00
Change dog house clearances
Details
       

 06-19-2014
2.00
Sanded Canard and fill in low area
Details
       

 06-17-2014
2.00
Fill in spar depression and skim canard
Details
       

 06-13-2014
2.00
Canard TRAX repair sanded and resin injection.
Details
       

 06-09-2014
2.50
Canard Lay-up C air bubbles removed
Details
       

 11-28-2013
1.00
TRIAX on dog house for hold down hinges
Details
       

 11-26-2013
1.00
Sand Dog houes face and fuselage face
Details
       

 11-24-2013
3.00
1 bid on dog house and fuselage face's
Details
       

 11-22-2013
1.50
Fill the under side gap.
Details
       

 11-20-2013
3.50
Cut and prep tabs for nut plates and then install
Details
       

 11-17-2013
1.50
Cut backing boards off and remove Canard for clean
Details
       

 11-16-2013
4.00
Make front and back fusalage Canard tabs
Details
       

 11-15-2013
1.00
Dog house is off
Details
       

 11-11-2013
3.00
Fit dog house for TRIAX lup-ups
Details
       

 11-10-2013
2.00
Structurally resin in the hard point to the bulk h
Details
       

 11-10-2013
1.00
Remove foam from dog house
Details
       

 11-09-2013
4.00
Drill holes in bulk head for attachment points.
Details
       

 11-05-2013
1.00
Fit Canard
Details
       

 11-04-2013
1.00
Time to fit the canard onto the fuselage
Details
       

 10-27-2013
0.50
Peel-ply added
Details
       

 10-27-2013
4.50
Canard Attachment Reinforcment
Details
       

 02-24-2013
2.00
Canard needs some work
Details
       