KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 6
Category Work Time: 9 Hours
 Date
Hours
Work Log Summary

Details

 08-12-2014
1.00
Installed Electrical Terminals Cover
Details
     

 04-19-2014
2.00
Attached Tool Box to Fwd Baggage Comp. Floor
Details
       

 02-16-2013
2.00
Installed Baggage Door Latch Blocks
Details
       

 02-16-2013
1.00
Installed "SeaDog SS Hatch Spring" Door Stay
Details
       

 02-15-2013
1.00
Installed Baggage Door Lock and Latch Bars
Details
       

 02-15-2013
2.00
Drilled and Riveted Baggage Door Hinge
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.