Date
|
Hours
|
Work Log Summary
|
Details
|
12-07-2014
|
0.50
|
SCAT hose from baffle to muffler
|
Details
|
|
|
10-26-2014
|
4.00
|
Firesleeve on remaining tubing
|
Details
|
|
|
10-15-2014
|
1.50
|
Standoffs for spark plug wires
|
Details
|
|
|
10-08-2014
|
3.50
|
Spark plug wires
|
Details
|
|
|
09-15-2014
|
3.00
|
Manifold Pressure Sensor
|
Details
|
|
|
09-03-2014
|
4.00
|
Secured more lines
|
Details
|
|
|
09-01-2014
|
2.00
|
Secured wires
|
Details
|
|
|
08-31-2014
|
2.00
|
Secured lines with Adel clamps
|
Details
|
|
|
08-30-2014
|
2.00
|
Torqued steel hose fittings
|
Details
|
|
|
08-29-2014
|
3.50
|
Baffle supports, seal holes
|
Details
|
|
|
08-24-2014
|
2.00
|
Baffle support
|
Details
|
|
|
08-23-2014
|
3.50
|
Blast tubes for alternators
|
Details
|
|
|
08-22-2014
|
2.00
|
Outboard tension rods, other
|
Details
|
|
|
08-21-2014
|
1.00
|
Finished inner tension rods
|
Details
|
|
|
08-20-2014
|
4.00
|
Various
|
Details
|
|
|
08-18-2014
|
1.50
|
Various
|
Details
|
|
|
08-14-2014
|
0.50
|
Attached cabin heat flange to rear baffle
|
Details
|
|
|
08-13-2014
|
2.50
|
Miscellaneous
|
Details
|
|
|
08-13-2014
|
2.00
|
Fit and measure trial fuel lines
|
Details
|
|
|
08-10-2014
|
0.50
|
Added exhaust shields
|
Details
|
|
|
08-09-2014
|
1.50
|
Finished mixture cable
|
Details
|
|
|
08-09-2014
|
2.00
|
Finished left hangers for exhaust
|
Details
|
|
|
08-08-2014
|
1.50
|
Mixture cable install
|
Details
|
|
|
08-06-2014
|
5.00
|
Exhaust system install
|
Details
|
|
|
08-02-2014
|
2.00
|
Oil cooler, coils
|
Details
|
|
|
07-30-2014
|
4.00
|
Various engine sensors
|
Details
|
|
|
07-27-2014
|
1.50
|
Finish heater cable, baffle adj.
|
Details
|
|
|
07-26-2014
|
1.00
|
Heat box cable
|
Details
|
|
|
07-23-2014
|
3.00
|
Throttle and other controls.
|
Details
|
|
|
07-19-2014
|
1.00
|
Throttle rod-end bolt, cabin heat control
|
Details
|
|
|
07-16-2014
|
2.00
|
Mixture and Throttle controls
|
Details
|
|
|
07-11-2014
|
0.50
|
Clearance for airbox plate/NG
|
Details
|
|
|
07-09-2014
|
4.00
|
Engine controls
|
Details
|
|
|
05-20-2014
|
4.00
|
Finished baffling
|
Details
|
|
|
05-17-2014
|
1.50
|
Fuel lines and baffling
|
Details
|
|
|
05-14-2014
|
4.00
|
Continue baffling
|
Details
|
|
|
05-11-2014
|
1.50
|
Right aft baffling
|
Details
|
|
|
05-10-2014
|
1.50
|
Left aft baffling
|
Details
|
|
|
05-09-2014
|
1.00
|
Finished left side baffling
|
Details
|
|
|
05-08-2014
|
1.00
|
Left Baffling
|
Details
|
|
|
05-07-2014
|
4.00
|
Baffling
|
Details
|
|
|
05-04-2014
|
6.25
|
Airbox, Oil cooler brace
|
Details
|
|
|
04-27-2014
|
3.50
|
Baffles, oil cooler
|
Details
|
|
|
04-26-2014
|
0.25
|
Torque airbox plate bolts
|
Details
|
|
|
04-24-2014
|
1.00
|
Forward baffles
|
Details
|
|
|
04-23-2014
|
2.00
|
Airbox work
|
Details
|
|
|
04-16-2014
|
1.50
|
Front baffles
|
Details
|
|
|
04-12-2014
|
1.00
|
Fix Front baffles
|
Details
|
|
|
04-11-2014
|
1.00
|
Rivet front baffles
|
Details
|
|
|
04-06-2014
|
1.50
|
Baffle dimpling and riveting
|
Details
|
|
|
04-05-2014
|
2.00
|
Baffle work
|
Details
|
|
|
04-02-2014
|
2.00
|
Baffles
|
Details
|
|
|
03-30-2014
|
1.00
|
Triangle baffle
|
Details
|
|
|
03-26-2014
|
2.50
|
Baffles
|
Details
|
|
|
03-16-2014
|
2.00
|
More baffle work
|
Details
|
|
|
03-09-2014
|
1.00
|
Baffle work
|
Details
|
|
|
03-08-2014
|
2.50
|
Baffle work
|
Details
|
|
|
03-05-2014
|
3.00
|
Baffling work
|
Details
|
|
|
12-25-2013
|
4.00
|
Baffles
|
Details
|
|
|
11-30-2013
|
3.00
|
Oil cooler
|
Details
|
|
|
05-31-2013
|
1.50
|
Right air ramp baffle trimming
|
Details
|
|
|
05-30-2013
|
1.00
|
Top-Center baffle trimming
|
Details
|
|
|
05-29-2013
|
1.50
|
Top-Center baffle trimming
|
Details
|
|
|
05-28-2013
|
2.00
|
Baffle fitting
|
Details
|
|
|
05-25-2013
|
1.50
|
Baffle fitting
|
Details
|
|
|
05-18-2013
|
4.00
|
Baffle work
|
Details
|
|
|
04-20-2013
|
3.00
|
Finally attached prop extension
|
Details
|
|
|
04-19-2013
|
2.00
|
1 step backward
|
Details
|
|
|
04-17-2013
|
2.00
|
Prepped for prop extension
|
Details
|
|
|
03-21-2013
|
1.00
|
Baffle work continues
|
Details
|
|
|
03-20-2013
|
5.50
|
Mounted Lightspeed modules and cont baffles
|
Details
|
|
|
03-17-2013
|
6.00
|
Add brace for 2nd Lightspeed module pair
|
Details
|
|
|
03-16-2013
|
1.50
|
Continued with baffles
|
Details
|
|
|
03-15-2013
|
1.00
|
Continued tinkering with baffles
|
Details
|
|
|
03-14-2013
|
1.00
|
Finished Lightspeed attachment
|
Details
|
|
|
03-12-2013
|
1.00
|
Continued with Lightspeed attachment
|
Details
|
|
|
03-11-2013
|
3.00
|
Aft baffle brace, Lightspeed attachment
|
Details
|
|
|
03-09-2013
|
4.00
|
Fit baffles
|
Details
|
|
|
03-08-2013
|
1.50
|
Cyls 1 and 2 baffles
|
Details
|
|
|
03-07-2013
|
1.50
|
Cylinder 3 baffles
|
Details
|
|
|
03-06-2013
|
4.00
|
"Finished" cylinder 4 baffles
|
Details
|
|
|
03-04-2013
|
1.50
|
Alodined baffle parts
|
Details
|
|
|
03-01-2013
|
1.50
|
Drilled out rivet holes, fit together first baffle
|
Details
|
|
|
02-28-2013
|
1.50
|
Cut, trimmed, deburred parts for engine baffle
|
Details
|
|
|
02-22-2013
|
0.50
|
Inserted cotter pins
|
Details
|
|
|
02-21-2013
|
1.00
|
Torqued engine bolts
|
Details
|
|
|
02-20-2013
|
1.50
|
Mounted engine on fuselage
|
|
|
|
02-08-2013
|
2.00
|
Retrieved engine
|
Details
|
|