Powered By Kitlog Pro v2.0
Kupe's Zodiac 650B
Zodiac 650 B
Rudder
Work Logs Found:
25
Category Work Time:
70 Hours
Date
Hours
Work Log Summary
Details
11-27-2019
3.00
Rudder Cables Re-attach
Details
07-22-2019
4.00
N-Number Affixed to Rudder Right Side
Details
07-11-2019
2.50
Rudder Control Cables Safety-Wired
Details
06-20-2019
4.00
Added N-Number to Rudder Left Side
Details
05-21-2019
4.00
Rudder Cables Installation
Details
11-09-2017
2.00
Miscellaneous Tasks from TC Visit
Details
09-04-2017
2.00
Rudder Stops Installed
Details
08-23-2017
4.00
Tail Section Integration 8
Details
08-17-2017
3.00
Tail Section Integration 7 (Rudder Fairing)
Details
08-16-2017
2.50
Tail Section Integration 6
Details
08-10-2017
2.00
Tail Section Integration 5
Details
06-17-2017
2.00
Tail Section Integration 4
Details
06-11-2017
2.00
Tail Section Integration 3
Details
06-10-2017
2.00
Tail Section Integration 2
Details
05-29-2017
4.00
Tail Section Integration 1
Details
04-30-2017
2.00
Rudder Installation 2
Details
03-03-2017
1.50
Rudder Installation 1
Details
09-21-2013
0.00
Zenith Open Hangar Event
Details
03-08-2013
8.00
Polishing Skin
Details
01-23-2013
2.50
Rudder Final Assembly
Details
01-22-2013
2.00
Trimming Rudder Nose Skin
Details
01-21-2013
2.00
Rudder Nose Skin drilled/Cleco-fastened
Details
01-20-2013
4.00
Rudder Tail Skin Assembled
Details
01-19-2013
3.00
Finished the Rudder Skeleton
Details
01-17-2013
1.50
Started on the Rudder
Details
SITE NAVIGATION
Contact Builder
Zodiac 650 B Home
Category
# Logs
# Hours
All
774
1452
Avionics
35
54
Brakes
21
35
Canopy
38
72
Cockpit
34
54
Electrical
73
120
Engine
71
127
Flight Test
1
1
Fuel
26
48
Fuselage
136
252
Landing Gear
19
28
Miscellaneous
28
54
Polishing
8
24
Rudder
25
70
Shop
7
8
Stabilizer
37
77
Wings
215
428
Copyright © 2001-2024 Matronics. All Rights Reserved.