Powered By Kitlog Pro v2.0
Hamiltons RV Website
RV-10
Elevator
Work Logs Found:
48
Category Work Time:
85 Hours
Date
Hours
Work Log Summary
Details
03-06-2013
0.50
Trim Cable Attachments
Details
03-06-2013
2.00
Rivet trailing edges.
Details
03-06-2013
1.00
Rivet the Counterbalance Rib aft of the Rear Spar
Details
03-06-2013
1.50
Cutting and preparing Lead Counterbalances
Details
03-06-2013
0.25
Blind Rivet Closetout Tabs
Details
03-03-2013
2.50
Proseal the Trailing Edge
Details
03-01-2013
2.50
Tip Rib Attachment
Details
02-26-2013
2.00
Rivet Front Spar to Skin (Most of it)
Details
02-26-2013
2.25
Attach Root Ribs
Details
02-26-2013
0.50
Attach Forward Spars
Details
02-25-2013
0.50
Clecoed Front spars to the Elevators
Details
02-24-2013
1.00
Right Elevator Second Skin
Details
02-24-2013
1.00
Right Elevator - Blind Riveting Ribs
Details
02-19-2013
0.20
Prepare the Foam trailing Edge Ribs
Details
02-17-2013
1.50
Riveting the second skin Left Elevator
Details
02-17-2013
2.00
Riveting the Rear spar to the skin
Details
02-17-2013
1.50
Blind Rivet Ribs
Details
02-16-2013
0.75
Rivet Static Wick attachment points
Details
02-16-2013
0.50
Adding the Gussets
Details
02-16-2013
1.50
Adding rear spars and shear clips
Details
02-12-2013
1.00
Attach Trim Reinforcements to Skins
Details
02-12-2013
1.50
Attach ribs to skins
Details
02-10-2013
4.00
Skin Priming and Spray Painting
Details
02-10-2013
1.50
Riveting Trim Reinforcement Nutplates
Details
02-10-2013
1.75
Riveting the Tip Ribs
Details
02-10-2013
1.00
Riveting the Spar Doublers
Details
02-10-2013
0.75
Elevator Horn Attachment
Details
02-10-2013
0.85
Attaching the Root Ribs and Snap Bushings
Details
02-09-2013
3.00
Priming Spars and skins
Details
02-08-2013
2.00
Priming Smaller Parts
Details
02-03-2013
3.10
Dimple Tips and countersink TE wedge - Then Static
Details
02-02-2013
0.60
Spar Flange Angles and Further Dimpling
Details
02-01-2013
1.50
Dimpling Substructure
Details
02-01-2013
6.00
Deburring and Dimpling
Details
01-31-2013
8.50
Final Drilling the Horns, Trim Cable Anchor bracke
Details
01-30-2013
2.00
Trim Access Reinforcement, Tip Ribs and Top Skins
Details
01-30-2013
4.00
Close Out Tabs and Elevator Horns
Details
01-30-2013
0.75
Adding Spars and Shear Clips.
Details
01-29-2013
0.75
Skin Close Out Tabs
Details
01-29-2013
1.25
Preparation of the Tip Subassemblies
Details
01-29-2013
1.00
Preparation of the Front Spars & Static Bonding
Details
01-29-2013
4.00
Ouch More Deburring - Skins
Details
01-29-2013
0.50
Clecoed the Ribs to the skins
Details
01-28-2013
3.00
More deburring
Details
01-27-2013
0.50
Preparation of the shear clips.
Details
01-26-2013
2.00
Deburing The Elevator Parts
Details
01-17-2013
1.50
Deburring Elevator Parts
Details
01-16-2013
1.00
Commenced Elevators
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
173
355
Elevator
48
85
Empenage
1
1
Horizontal Stabilise
38
87
Lighting
1
Miscellaneous
3
17
Rudder
31
67
Tail Cone
5
5
Tech Review
4
3
Tools
2
2
Training
4
8
Vertical Stabiliser
23
51
Workshop
13
29
Copyright © 2001-2024 Matronics. All Rights Reserved.