KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
Work Logs Found: 64
Category Work Time: 380 Hours
 Date
Hours
Work Log Summary

Details

 03-03-2016
3.00
Engine oil
Details

 12-22-2015
7.00
Baffle extension
Details
       

 12-21-2015
6.00
#5 Cly Baffle rework
Details
       

 11-05-2015
6.50
Mixture arm reset/reflective material install
Details
       

 05-25-2015
8.00
Fuel pressure test
Details
     

 05-22-2015
7.00
Reiff preheat plug installed
Details
       

 05-21-2015
7.00
Reiff preheat install
Details
       

 04-07-2015
3.50
Oil Cooler Butterfly Valve Cable Install
Details
       

 04-06-2015
8.00
Auxiliary Air Inlet Cable Install
Details
       

 03-26-2015
1.00
Engine Timing
Details
       

 03-12-2015
8.50
SCAT Tube Installed
Details
       

 03-09-2015
6.00
Glare Screen Primed
Details
     

 03-03-2015
8.00
Misc Forward Work
Details
       

 03-02-2015
8.00
Fuel Flow Transducer Install
Details
       

 02-19-2015
7.50
Oil cooler vent and control cable work up
Details
       

 02-14-2015
3.50
Paint airbox
Details
       

 02-09-2015
7.50
Fuel lines - establish length
Details
       

 01-12-2015
4.00
Fumes Disposal and SCAT Tubes
Details
       

 01-07-2015
8.00
Exhaust Install
Details
       

 01-06-2015
8.00
Engine Oil Screen Service
Details
       

 01-05-2015
5.00
Exhaust System Bench Assembly
Details
     

 01-02-2015
2.00
Cowlilng Stretch, Rough Fit and Finish Fit
Details
       

 01-01-2015
5.00
Oil Service Door Safety and MISC
Details
       

 12-30-2014
4.00
Cowling stretching
Details
       

 12-29-2014
4.00
Stretching the cowling
Details
       

 12-20-2014
3.00
Alternator Installed
Details
       

 12-18-2014
6.00
Air Box Fuel Drain Tube
Details
       

 12-16-2014
6.00
Aux Air Inlet proseal with nut plates
Details
       

 12-15-2014
9.00
Air box aux air
Details
       

 12-12-2014
6.00
Air box seal install
Details
       

 12-11-2014
6.00
Air inlet balloon removal
Details
       

 12-10-2014
4.00
Air inlet, balloon install
Details
       

 12-08-2014
8.00
Air inlet, foam block
Details
       

 12-05-2014
8.00
Air box, air cleaner clips install
Details
       

 12-04-2014
6.00
Fuel injector throttle body
Details
       

 12-02-2014
5.00
Desiccant added to cylinders
Details
       

 11-13-2014
8.00
Baffle air seal fabric
Details
       

 11-11-2014
3.00
Baffle paint
Details
     

 11-03-2014
6.00
Air seal fabric final install
Details
       

 11-01-2014
4.00
Air shield fabric - air inlet
Details
       

 10-31-2014
7.50
More air seal fabric on baffles
Details
       

 10-30-2014
9.00
More baffles and blast tube holes
Details
       

 10-29-2014
7.20
Adding air fabric
Details
       

 10-28-2014
7.50
Air fabric templates
Details
       

 10-25-2014
7.00
Carbon fiber engine mount covers
Details
       

 10-23-2014
7.20
Rough fit carbon engine mount covers
Details
     

 10-21-2014
7.00
Baffle height adjustment
Details
       

 10-20-2014
7.00
Baffle - air inlet
Details
       

 10-19-2014
3.00
Left air inlet
Details
       

 10-18-2014
2.50
Right inlet air ramp
Details
       

 10-17-2014
8.00
Transition gap
Details
       

 10-16-2014
6.00
Prop governor baffle
Details
       

 10-15-2014
5.00
Front air ramps
Details
       

 10-13-2014
9.00
Prop governor cable baffle hole
Details
       

 10-09-2014
7.00
Right side baffles
Details
       

 10-08-2014
8.00
Fitting baffles
Details
       

 10-07-2014
7.00
Assembling baffles
Details
       

 10-06-2014
7.00
Engine baffles
Details
       

 07-24-2014
2.00
Prop governor installed
Details
     

 07-22-2014
2.00
Engine installation
Details
       

 07-19-2014
8.00
Heat duct controls and misc installed
Details
       

 07-18-2014
2.00
Oil galley plug removal
Details
       

 07-17-2014
8.00
Engine prep for installation
Details
       

 06-11-2014
2.00
Engine Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.