Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
05- Fuselage
Work Logs Found:
121
Category Work Time:
238 Hours
Date
Hours
Work Log Summary
Details
12-26-2013
2.00
Reinstalled Wheel Pants and Fairings
Details
11-28-2013
0.00
Completed Weight and Balance - addl pics
11-28-2013
4.00
Completed Weight and Balance
Details
11-27-2013
4.00
Punch list items completed
Details
11-23-2013
6.00
Rigging Ailerons, Elevator and Flaps
Details
10-06-2013
1.00
Final Install Rear Plexiglass
Details
09-23-2013
0.50
Installed Aileron Boot Flange
Details
09-22-2013
1.50
Pop-Riveted bottom cover plate
Details
09-16-2013
0.75
Front Skin 45% complete
Details
09-15-2013
1.00
Started riveting front skin
Details
09-01-2013
3.50
Installed cap strips
Details
09-01-2013
2.00
Dimpled, marked and installed Top forward skin
Details
08-31-2013
1.50
Added missing rivets to F-757-T
Details
08-30-2013
1.50
Fuel Tank Sender Wiring
Details
08-27-2013
0.50
Riveted Rudder Stops
Details
08-27-2013
1.50
Installed Springs for Electric Aileron Trim
Details
08-27-2013
0.50
Drilled and Tapped Co-Pilot set screw
Details
08-24-2013
3.00
Added additional center section hole for wiring
Details
08-18-2013
1.00
Added Dual USB Charger Port
Details
07-07-2013
4.50
Cut and Installed Control Sticks
Details
07-06-2013
2.00
Added Brake Fluid
Details
08-05-2012
1.50
Mounted ELT Antenna
Details
07-21-2012
1.50
Prepped Cockpit for Painting
Details
07-21-2012
2.00
Cockpit Painting Completed
Details
07-13-2012
1.50
Safety tied elevator servo
Details
07-02-2012
2.00
Fabricated Oil Cooler shutter FW pass thru
Details
06-03-2012
0.50
Switched out Adel G7 for G6 clamps for hoses
Details
03-04-2012
3.50
Brake Line Installation
Details
02-19-2012
1.50
Secured Static line at rear bulkhead
Details
02-18-2012
3.00
AOA, Pitot and Static lines , cabin painting
Details
02-12-2012
1.50
Static Line routing
Details
02-27-2011
2.50
Builder Mod Cabin frame support cover
Details
01-30-2011
0.00
Drilling the Canopy Bolts (Right Side)
Details
01-30-2011
2.00
Drilling Canopy Attach Bolts (Left side)
Details
01-29-2011
5.00
Trimming and priming for Canopy Attach bolt
Details
01-17-2011
2.00
Completed riveting cabin frame
Details
01-08-2011
3.50
Riveted Forward Section of the Cabin Frame
Details
01-03-2011
1.00
Canopy Frame priming
Details
01-03-2011
3.00
Canopy Frame countersinking
Details
12-30-2010
1.50
Installed fuel vent line passenger side
Details
12-30-2010
1.00
Drilled out broken tap on longeron
Details
12-29-2010
4.00
Installed Fuel vent tubing pilot side
Details
12-29-2010
0.00
Add'l pictures Fuel vent tubing
Details
12-26-2010
2.00
Canopy Frame mechanical countersinking - Day 3
Details
12-22-2010
3.50
Drilling Canopy Frame forward holes
Details
12-19-2010
3.50
Cabin Frame Assembly Day 2
Details
12-18-2010
3.50
Cabin Frame Assembly Day 1
Details
12-12-2010
1.00
Riveting Rudder cable exit fairings
Details
12-12-2010
1.50
Priming Parts
Details
12-05-2010
4.00
Rivet Rear Fuselage skins
Details
11-23-2010
1.50
ProSeal NACA Fresh air ducts
Details
11-16-2010
0.00
Cockpit parts painted #2
11-16-2010
0.00
Cockpit parts painted #1
Details
10-31-2010
3.00
Rudder Cable Exit Fairings
Details
10-31-2010
3.50
Electric Elevator Trim
Details
10-31-2010
1.50
Bottom Rudder Fairing test fit
Details
10-30-2010
3.50
Rudder Cables
Details
10-24-2010
1.00
Reamed Gear Leg holes
Details
10-23-2010
1.00
Lower elevator horn hole (continued)
Details
10-23-2010
2.50
Lower elevator horn hole
Details
10-23-2010
0.50
Elevator push pull tube allignment
Details
10-23-2010
1.50
Adjusted Elevator up / down stops
Details
10-10-2010
2.00
Passenger side Crotch Strap assembly
Details
10-10-2010
1.00
Elevator Push Pull tube blind rivets
Details
10-03-2010
0.50
Crotch strap with seats installed
Details
10-02-2010
2.00
Finish Crotch strap assembly (pilot side)
Details
09-26-2010
2.00
Primed Push Pull Tubes
Details
09-19-2010
3.00
Crotch Strap assembly
Details
09-18-2010
1.50
Moved Rudder pedal assembly aft
Details
09-18-2010
1.00
Adjusted control stick clearance
Details
09-10-2010
0.50
Test Fit Interior seating
Details
09-10-2010
0.00
Leather fitting
07-05-2010
1.50
SafeAir Pitot Static fuselage install
Details
06-13-2010
2.50
Electric Flap Assembly - 2
Details
06-06-2010
3.00
Electric Flap assembly -1
Details
06-05-2010
1.00
Riveted Heat baffle
Details
06-05-2010
1.50
Mounting the Andiar Fuel Valve & Priming parts
Details
06-05-2010
2.00
Finishing the Forward Fuselage Cover
Details
06-05-2010
0.50
Drilled nutplates on firewall recesss
Details
05-31-2010
3.00
Fitting the Forward Top Skins
Details
05-31-2010
2.00
Fitting the Forward Top Skin - Continued
Details
05-30-2010
1.00
Priming parts
Details
05-30-2010
2.50
Elevator Bellcrank Assembly
Details
05-29-2010
1.50
Ordered Oregon Aero Seats package
Details
05-16-2010
1.00
Rudder Pedals Finish Painting
Details
05-15-2010
2.00
Drilling Landing Gear (Con't)
Details
05-15-2010
4.00
Drilling Landing Gear
Details
05-08-2010
1.00
Mounted Brake fluid resorvior
Details
05-08-2010
4.00
Drilled Brake Pedal piston holes & final assembly
Details
05-02-2010
1.50
Cleaned & Primed Rudder Pedals
Details
05-01-2010
4.00
Fabricated Rudder Pedals
Details
04-25-2010
3.00
Rudder Pedals bearing assembly
Details
04-24-2010
3.00
Test Fit rudder pedal assembly and deburred parts
Details
04-23-2010
1.00
Right side seat riveted
Details
04-18-2010
2.00
Riveted Left Seat
Details
04-18-2010
3.00
Drilled Steat backs
Details
04-17-2010
2.00
Final Assembly Right Side Step
Details
04-10-2010
2.50
Finish installing left side step
Details
04-01-2010
2.00
Final fitting left side fuselage step
Details
03-28-2010
1.50
Rough cut install of Fuselage Steps
Details
03-28-2010
2.50
Removed Baggage floor and side skins
Details
03-24-2010
1.50
Tunnel Cover & Flap Bracket
Details
03-21-2010
4.50
Seat Adjustment Supports
Details
03-21-2010
1.50
Enlarging Ribs for Control Stick Fitting
Details
03-21-2010
1.00
Completed Control stick installation
Details
03-21-2010
1.00
Added spacing washers to Control stick assmb
Details
03-20-2010
1.50
Fuel Pump Doubler Prime and Rivet
Details
03-20-2010
2.50
Fuel Pump Doubler Fabrication
Details
03-14-2010
2.00
Tunnel Cover (F-741B)
Details
03-14-2010
2.00
Drilling lightening holes for seatback support
Details
03-13-2010
3.00
Control Stick Assembly
Details
03-12-2010
1.50
Firewall Recess Drill & Dimple
Details
03-06-2010
0.50
Tap Tie-Down Bar (W-933)
Details
03-06-2010
4.50
Parts Inventory and Storage
Details
03-06-2010
2.00
Drill, Prime and Rivet brake line bracket (F-6122)
Details
02-28-2010
0.00
QB Fuselage Quality Pictures #2
02-28-2010
0.00
QB Fuselage Quality Pictures #1
02-27-2010
4.00
Fabricate Seat Back Assembly & Tie down bar
Details
02-20-2010
2.00
QB Fuselage and Wing Inventory
Details
02-20-2010
2.00
Inventoried Parts Fabrication
Details
02-17-2010
1.00
QB Fuselage & Wings Delivery
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2025 Matronics. All Rights Reserved.