Date
|
Hours
|
Work Log Summary
|
Details
|
06-22-2022
|
3.00
|
prime the enpennage fairings
|
Details
|
|
|
06-21-2022
|
1.00
|
prep empenage fairings for prime
|
Details
|
|
|
04-10-2022
|
3.25
|
attached the rudder cable links, stab cables
|
Details
|
|
|
04-09-2022
|
2.50
|
fabricate rudder cable links
|
Details
|
|
|
04-07-2022
|
1.50
|
work on rudder cable links
|
Details
|
|
|
04-02-2022
|
1.50
|
open talcone fairing hole
|
Details
|
|
|
03-29-2022
|
2.50
|
check horiz stab servo trim tab clearance
|
Details
|
|
|
03-28-2022
|
1.25
|
torque stabilator bolts,
|
Details
|
|
|
03-25-2022
|
3.00
|
stabilator install.
|
Details
|
|
|
03-23-2022
|
1.00
|
Prep part for SB-00053
|
Details
|
|
|
03-20-2022
|
1.75
|
Remove stabilator and reglue washers
|
Details
|
|
|
02-15-2022
|
1.00
|
corrected trim servo wiring
|
Details
|
|
|
02-12-2022
|
0.50
|
enlarge bottom tailcone fairing hole an slot
|
Details
|
|
|
02-10-2022
|
2.50
|
install tailcone fairings, check clearance
|
Details
|
|
|
02-08-2022
|
2.25
|
step drill 3/4" hole in bottom tailcone fairing
|
Details
|
|
|
01-29-2022
|
1.50
|
Temporary install of horz stab
|
Details
|
|
|
01-27-2022
|
1.00
|
Update Syview, install horiz stab counter weight
|
Details
|
|
|
01-13-2022
|
0.50
|
Installed the vertical stabilizer leading edge pie
|
Details
|
|
|
01-08-2022
|
1.00
|
installed rudder top bolt, torqued vert. stab bolt
|
Details
|
|
|
01-04-2022
|
2.00
|
moved H. Stab to hangar, mounted V. Stab
|
Details
|
|
|
01-01-2022
|
1.50
|
Happy New Year, glued washers to H. stab.
|
Details
|
|
|
08-30-2021
|
3.00
|
cut paper templates for foil cowl heat shield
|
Details
|
|
|
06-19-2020
|
4.00
|
rivet the tailcone onto the fuselage
|
Details
|
|
|
06-18-2020
|
3.00
|
wire tie fuel air vent, rivet shoulder harness lug
|
Details
|
|
|
06-16-2020
|
2.75
|
bend tailcone tabs, cleco tailcone bottom
|
Details
|
|
|
06-10-2020
|
2.50
|
countersink bottom fairing, rivet clamps
|
Details
|
|
|
06-09-2020
|
0.75
|
sand empanage fairings to final fit
|
Details
|
|
|
06-08-2020
|
2.00
|
countersink bottom fairing and rivet nut plates
|
Details
|
|
|
06-07-2020
|
2.75
|
tempoary attachment and drill for fairing clamps
|
Details
|
|
|
06-06-2020
|
3.00
|
finish sanding fairings, apply masking tape templa
|
Details
|
|
|
06-05-2020
|
2.75
|
trim bottom and top tailcone fairings
|
Details
|
|
|
06-04-2020
|
2.50
|
marked 3/4" masking tape for tailcone, fairings
|
Details
|
|
|
05-09-2020
|
1.00
|
investigate cable attach process for rudder & stab
|
Details
|
|
|
04-29-2020
|
1.50
|
re-hang stab. in basement, get ready for wing mtg.
|
Details
|
|
|
04-25-2020
|
1.40
|
attach stabilator trims
|
Details
|
|
|
04-24-2020
|
1.00
|
make stabilator hinge wires
|
Details
|
|
|
04-22-2020
|
2.75
|
assemble stab. trim pushrod assembly
|
Details
|
|
|
04-21-2020
|
2.00
|
install connector on stab trim servo tray
|
Details
|
|
|
04-19-2020
|
1.00
|
finish bushing on servo trim tray
|
Details
|
|
|
04-18-2020
|
1.50
|
add bushings to servo tray and link
|
Details
|
|
|
04-17-2020
|
2.00
|
prep parts for horiz. stab. trim control and servo
|
Details
|
|
|
04-15-2020
|
1.75
|
separate and deburr F-1294C
|
Details
|
|
|
04-14-2020
|
1.50
|
vert. stab. fiberglass tip trim to match rudder ti
|
Details
|
|
|
04-13-2020
|
2.50
|
vertical stab. fiberglass tip preparation
|
Details
|
|
|
04-12-2020
|
2.00
|
rudder fiberglass tip trim, drill, sand
|
Details
|
|
|
04-11-2020
|
0.75
|
work on rudder fiberglass tip
|
Details
|
|
|
03-31-2020
|
2.00
|
Fabricate temporary spacers and F-1258 parts
|
Details
|
|
|
03-28-2020
|
1.00
|
re-insertion and gluing of stabilator bearings
|
Details
|
|
|
03-27-2020
|
2.50
|
Remove the stabilator bearings per SB 16-08-01
|
Details
|
|
|
03-26-2020
|
2.75
|
Install ADAHRS stiffener to tail cone
|
Details
|
|
|
03-09-2020
|
0.75
|
Install rudder trim tab
|
Details
|
|
|
11-13-2019
|
2.40
|
deburr all parts needed
|
Details
|
|
|
11-06-2019
|
1.15
|
check vert stab, rudder and trim tabs
|
Details
|
|
|
03-29-2014
|
1.00
|
Hang tailcone in garage
|
Details
|
|
|
03-18-2014
|
0.83
|
Finish riveting tailcone assembly
|
Details
|
|
|
03-15-2014
|
3.00
|
tailcone fwd skin rib, stiffeners, rivet right
|
Details
|
|
|
03-14-2014
|
2.85
|
Finish rivet tailcone sides, cleco top skin
|
Details
|
|
|
03-13-2014
|
2.00
|
Rivet left half of tailcone sides
|
Details
|
|
|
03-11-2014
|
1.75
|
Install snap bushing brackets and guide strings
|
Details
|
|
|
03-08-2014
|
1.25
|
deburr all holes and edges F-1279-L & R
|
Details
|
|
|
03-07-2014
|
3.50
|
Route elev. trim wiring and static plumbing
|
Details
|
|
|
02-25-2014
|
1.25
|
remove plastic from F-1279-L & R
|
Details
|
|
|
02-24-2014
|
1.00
|
Flip tailcone and install skins
|
Details
|
|
|
02-19-2014
|
5.09
|
Complete manual 10-06 and 10-07
|
Details
|
|
|
02-05-2014
|
2.50
|
Add stiffeners to bottom tailcone skins
|
Details
|
|
|
02-04-2014
|
0.42
|
Start prep of F-1282-L
|
Details
|
|
|
02-04-2014
|
1.00
|
Deburr and break F-1278
|
Details
|
|
|
01-29-2014
|
1.67
|
Deburr and break F-1280-L & R
|
Details
|
|
|
01-22-2014
|
2.25
|
Deburr and break F-1281-L & R
|
Details
|
|
|
01-21-2014
|
1.00
|
Deburr and break F-1282-R
|
Details
|
|
|
01-16-2014
|
2.50
|
remove blue plastic from tail cone skins
|
Details
|
|
|
11-06-2013
|
1.75
|
Figure out and add washers to horz. stab.
|
Details
|
|
|
10-28-2013
|
1.20
|
Finish F-1211 assembly
|
Details
|
|
|
10-25-2013
|
3.20
|
Rivet F-1211 assembly
|
Details
|
|
|
10-18-2013
|
0.70
|
Match drill, final drill, Prime remaining nut plat
|
Details
|
|
|
10-17-2013
|
1.55
|
work on fuselage rear bulkhead
|
Details
|
|
|
10-16-2013
|
2.20
|
Complete manual page 10-03
|
Details
|
|
|
09-25-2013
|
1.75
|
Fabricate Tail Skid bracket
|
Details
|
|
|
09-19-2013
|
2.65
|
Finish F-1210 frame
|
Details
|
|
|
09-13-2013
|
0.50
|
Rivet wear plate and tail cone ribs
|
Details
|
|
|
09-11-2013
|
2.15
|
Deburred ribs F-1208 and F-1209
|
Details
|
|
|
09-09-2013
|
0.60
|
Remove plastic and flute tailcone ribs
|
Details
|
|
|
09-05-2013
|
0.70
|
sort parts and 10-02 step 3
|
Details
|
|
|
09-03-2013
|
0.50
|
Hang the finished horizontal stab
|
Details
|
|
|
08-30-2013
|
0.50
|
Add counterbalance weights
|
Details
|
|
|
08-29-2013
|
2.90
|
Installed aft outside skins on stab
|
Details
|
|
|
08-27-2013
|
2.00
|
Rivet hinges and aft ribs on stab.
|
Details
|
|
|
08-27-2013
|
0.55
|
Finish riveting on horz. stabilator skeleton
|
Details
|
|
|
08-26-2013
|
1.55
|
Rivet right main stab skin onto skeleton
|
Details
|
|
|
08-22-2013
|
2.25
|
Rivet left main stab skin top and bottom
|
Details
|
|
|
08-21-2013
|
3.80
|
Deburr main stab skins and cleco on skeleton
|
Details
|
|
|
08-20-2013
|
1.00
|
Deburr inside of stab main skins
|
Details
|
|
|
08-16-2013
|
1.75
|
Drill stab hinges
|
Details
|
|
|
07-18-2013
|
2.00
|
Install horz stab stops and torque, mark hinges
|
Details
|
|
|
07-16-2013
|
0.75
|
Install horz stab hinges
|
Details
|
|
|
07-11-2013
|
4.50
|
Finish Stabilator Skeleton Assembly
|
Details
|
|
|
07-03-2013
|
1.00
|
Rivet horz spar rib clips, radius ribs
|
Details
|
|
|
06-28-2013
|
2.50
|
Fab hinge stops,rivet spar caps
|
Details
|
|
|
06-27-2013
|
2.50
|
Rivet all nut plates and counterbalance brackets
|
Details
|
|
|
06-26-2013
|
3.25
|
horz stab spar work
|
Details
|
|
|
06-25-2013
|
2.80
|
Cleco attach and drill counterbalance pieces
|
Details
|
|
|
06-21-2013
|
4.00
|
Deburr and rivet stab spar caps
|
Details
|
|
|
06-19-2013
|
1.50
|
Match drill #12, cut and deburr pieces
|
Details
|
|
|
06-15-2013
|
1.50
|
Reread manual section 5, countersink holes
|
Details
|
|
|
06-12-2013
|
2.10
|
Countersink horz stab spar pieces
|
Details
|
|
|
06-06-2013
|
2.50
|
Drilled 2 hinges pieces, finished AST assemblies
|
Details
|
|
|
06-05-2013
|
1.50
|
installed AST spars, cut AST hinges
|
Details
|
|
|
06-03-2013
|
1.00
|
Countersink and rivet AST control horns
|
Details
|
|
|
05-22-2013
|
1.10
|
Debur edges and rivet AST skins
|
Details
|
|
|
05-21-2013
|
1.25
|
Debur HS-1222 ribs and HS-1221-L & R skins
|
Details
|
|
|
05-16-2013
|
1.25
|
Prepare/drill left and right anti-servo tabs
|
Details
|
|
|
05-15-2013
|
3.25
|
Finish rudder
|
Details
|
|
|
05-14-2013
|
3.50
|
Finished Rudder skeleton assembly
|
Details
|
|
|
05-08-2013
|
0.50
|
Screw on vert stab fwd skin & hinges
|
Details
|
|
|
05-08-2013
|
2.00
|
Finish rudder spar assembly
|
Details
|
|
|
04-26-2013
|
1.25
|
Finish riveting vert stab skin
|
Details
|
|
|
04-25-2013
|
2.50
|
Rivet vert stab skin on skeleton
|
Details
|
|
|
04-24-2013
|
3.00
|
Vert Stab main skin
|
Details
|
|
|
04-12-2013
|
1.00
|
Finish riveting nut plates on VS-1201
|
Details
|
|
|
04-11-2013
|
2.25
|
Final drill, dimple & rivet vert stab skins
|
Details
|
|
|
04-10-2013
|
1.00
|
Trim fwd and main vert stab skins
|
Details
|
|
|
04-06-2013
|
2.40
|
Complete V-Stab Skeleton Assembly
|
Details
|
|
|
04-05-2013
|
0.60
|
Rivet two ribs to vert stab front spar
|
Details
|
|
|
04-03-2013
|
1.75
|
Radius vert stab ribs, debur, flute
|
Details
|
|
|
04-02-2013
|
1.30
|
Rivet the nut plates page 06-04
|
Details
|
|
|
03-29-2013
|
0.50
|
Prime nut plates, deburr
|
Details
|
|
|
03-22-2013
|
1.00
|
Rivet spar caps to vert stab rear spar
|
Details
|
|
|
03-20-2013
|
1.50
|
Countersink #40 holes
|
Details
|
|
|
03-16-2013
|
1.25
|
Match drill #40 and #12 holes
|
Details
|
|
|
03-14-2013
|
1.50
|
Finish match drilling #30
|
Details
|
|
|
03-01-2013
|
1.00
|
Finish rudder hinges
|
Details
|
|
|
02-25-2013
|
3.00
|
Match drill #30 holes
|
Details
|
|
|
02-22-2013
|
2.00
|
Prime and work on more rudder pieces
|
Details
|
|
|
02-21-2013
|
2.50
|
Rudder hinges
|
Details
|
|
|
02-16-2013
|
2.00
|
Sort and store misc hardware
|
Details
|
|
|
02-09-2013
|
3.00
|
Inventory Empenage
|
Details
|
|
|
02-08-2013
|
1.75
|
Unpack kit from crate
|
Details
|
|
|
01-29-2013
|
0.50
|
Empennage crate delivered
|
Details
|
|
|
01-21-2013
|
0.50
|
Order RV-12 empennage and fastener kit
|
Details
|
|