Powered By Kitlog Pro v2.0
TERRY'S WEB SITE
RV 10
Wings
Work Logs Found:
78
Category Work Time:
542 Hours
Date
Hours
Work Log Summary
Details
05-09-2013
8.00
Wing Harness, Antenna Connection
Details
05-08-2013
8.00
NS90 plates, harness connections and ground lug
Details
05-07-2013
7.00
Angle of Attack Sensors, Aileron Bias Spring Insta
Details
05-04-2013
5.00
Duckworth Lights Install
Details
05-03-2013
8.00
Duckwork HID Lights Install
Details
05-02-2013
8.00
Duckworth HID Landing Lights Install
Details
05-01-2013
8.00
Duckworth Lights Install
Details
04-30-2013
8.00
Wing Fairing Rib Install
Details
04-29-2013
8.00
Left wing fairing and NAV 2 Antenna
Details
04-25-2013
6.00
Right wing fairing
Details
04-24-2013
4.00
Wing fairing prework
Details
04-23-2013
6.00
Complete left wing bottom skin install
Details
04-22-2013
8.00
Aileron trim install and bottom skin start
Details
04-21-2013
2.00
Aileron Trim Assembly
Details
04-18-2013
8.00
Bottom Skin
Details
04-17-2013
8.00
Solder sleeve and labels
Details
04-16-2013
8.00
Left bottom skin and pitot tube
Details
04-15-2013
2.00
Conduit Seal
Details
04-12-2013
8.00
Wiring Left Wing
Details
04-11-2013
5.00
Bottom skin dimple and prime
Details
04-10-2013
8.00
Pitot controller plate / Bottom Skin
Details
04-09-2013
5.00
Pitot tube rough in
Details
04-08-2013
7.00
Misc wiring
Details
04-05-2013
1.00
Autopilot Wiring Harness Manufacture
04-05-2013
6.00
Auto pilot wiring harness build and install
Details
04-04-2013
8.00
Finish Aileron Push Rods
Details
04-03-2013
3.00
Working on the wing push tubes
Details
04-03-2013
4.00
Bellcrank assembly and mount
Details
04-02-2013
6.00
Wing Control Rods
Details
04-01-2013
8.00
Fuel tank test and install
Details
03-29-2013
6.00
Right Flap Complete
Details
03-28-2013
8.00
Left flap complete
Details
03-27-2013
6.00
Begin Flap final assembly
Details
03-26-2013
9.50
Paint Flaps
Details
03-25-2013
9.00
Left Flap Manufacture
Details
03-22-2013
6.00
Initial Flap Assembly
Details
03-21-2013
6.00
Flaps
Details
03-20-2013
8.00
Aileron / Flap Gap Fairing
Details
03-19-2013
7.00
Aileron/Flap Gap Fairing
Details
03-18-2013
8.00
Final assembly of fuel tanks
Details
03-14-2013
7.00
Aileron assembly
Details
03-13-2013
7.00
Prep and paint aileron components
Details
03-11-2013
8.00
Backrivet aileron skin and preassemble
Details
03-09-2013
5.00
Fuel level sending unit, ailerons
Details
03-08-2013
8.00
Finished fit up of aileron leading edge and start
Details
03-07-2013
7.00
Left aileron initial fit up and jigs manufactured.
Details
03-06-2013
12.00
Proseal right wing tank leading edge
Details
03-04-2013
8.00
Misc proseal
Details
03-02-2013
6.00
Final test fit prior to final assembly
Details
03-01-2013
5.00
Finish right wing fit up
Details
02-27-2013
8.00
Starting right wing fuel tank
Details
02-26-2013
16.00
Sealed 80% of left wing fuel tank
Details
02-23-2013
3.00
Left wing tank nose rib proseal
Details
02-22-2013
4.00
Prosealed left fuel tank stiffeners and back rivet
Details
02-21-2013
4.00
Sealing the manufacture holes in the fuel tank
Details
02-21-2013
4.00
Left fuel tank build underway
Details
02-20-2013
3.00
Final prep for tank assembly
Details
02-19-2013
8.00
Dimpled, alumipreped and alodined the left tank
Details
02-18-2013
5.00
Left Wing Fuel Tank
Details
02-18-2013
5.00
Install Right Wing Leading Edge
Details
02-16-2013
7.00
Left fuel tank first assembly
Details
02-15-2013
8.00
Right leading edge
Details
02-14-2013
5.00
Right leading edge prep and paint
Details
02-13-2013
13.00
Left leading edge installed on wing
Details
02-12-2013
9.00
Left wing leading edge with stall horn switch
Details
02-11-2013
7.00
Left Leading Mfg
Details
02-07-2013
6.00
Left leading edge first assembly
Details
02-06-2013
11.00
Finished top wing skin riveting
Details
02-05-2013
15.00
Rivet top skins
Details
02-04-2013
6.00
Cleco top wing skins
Details
02-04-2013
4.00
AM - Prime and Square
Details
02-02-2013
14.00
Top wing skins
Details
02-01-2013
9.00
Top Skin
Details
01-31-2013
8.00
Rear spar detail
Details
01-25-2013
8.00
Wing spar reassemble
Details
01-22-2013
8.00
Wing Rib Manufacture
Details
01-17-2013
8.00
Main spar extension & start tank nut plates
Details
01-11-2013
1.00
522 lbs of aircraft aluminum arrived today
SITE NAVIGATION
Contact Builder
RV 10 Home
Category
# Logs
# Hours
All
643
3955
Avionics
73
463
Empennage
22
130
Engine
64
380
Final Assembly
37
228
Fuselage
344
2131
Milestones
6
11
Miscellaneous
4
12
None
6
11
Prop
8
46
Tools
1
1
Wings
78
542
Copyright © 2001-2024 Matronics. All Rights Reserved.