KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
Work Logs Found: 137
Category Work Time: 407 Hours
 Date
Hours
Work Log Summary

Details

 02-18-2019
2.00
Installed the low fuel warning sensor in the heade
Details
     

 11-07-2015
2.00
One bid on strake to wing at wing spar
Details
       

 10-19-2014
0.00
Wing and strake front end
Details
       

 10-19-2014
3.00
Strake arm rest
Details
       

 10-16-2014
3.00
Finish up strakes at door and baggage
Details
       

 10-07-2014
3.50
Finish door area and front strake storage
Details
       

 10-07-2014
0.00
Continued
Details
       

 10-05-2014
4.50
UNI and Bid in front baggage bulkheads
Details
       

 10-04-2014
3.00
Prep baggage front bulkhead
Details
       

 09-24-2014
4.50
Triax Strake ends
Details
       

 09-22-2014
3.00
Back strake ribs from main spar
Details
       

 09-15-2014
3.00
Hell hole done on Co-pilot side
Details
       

 09-09-2014
3.00
Strake ribs to main spare
Details
     

 08-05-2014
6.00
More work on the baggage area and Hell hole
Details
       

 08-03-2014
4.00
More strake work
Details
       

 07-28-2014
4.00
Glass in top strake to fuselage
Details
     

 07-27-2014
4.00
Install top Co-Pilot strake
Details
       

 07-17-2014
3.00
Prep for Co-Pilot strake
Details
       

 07-06-2014
0.00
Working on strake
Details
       

 07-06-2014
4.00
Working on finishing Pilot strake
Details
     

 06-30-2014
4.50
Glassed in top strake to fuselage
Details
       

 06-26-2014
4.50
Top strake went on tonight
Details
       

 06-21-2014
2.00
Get plane ready for Pilot strake top
Details
       

 06-08-2014
1.00
Safety wiring of fuel gages
Details
     

 04-24-2014
3.00
Wing strake cut out and fuel proofing top strakes
Details
       

 04-16-2014
2.00
Relief in upper strake for tire clearance
Details
     

 04-13-2014
2.00
Bid in sight gage
Details
       

 04-12-2014
3.00
Fuel sight gage and fuel probes
Details
       

 04-10-2014
3.00
Fuel proofing strake with 3 coats of resin.
Details
     

 04-07-2014
3.00
Fuel cap ground wire & prep for fuel proofing
Details
       

 04-05-2014
3.00
Relocate Pilot fuel flange and then 3 bid
Details
       

 04-04-2014
3.00
Fule probes
Details
       

 03-31-2014
5.00
Sanding and prep for top of flanges
Details
       

 03-30-2014
3.00
Clean up and flanges
Details
       

 03-29-2014
2.50
Bolt hole, screen bid, micro upper strake
Details
       

 03-27-2014
3.00
Out-let screens & Fuel cap
Details
       

 03-25-2014
2.00
Sand mouse holes and install flanges on baffles
Details
       

 03-24-2014
3.50
Strake baffles and clean up -02
Details
       

 03-24-2014
3.50
Strake baffles and clean up -01
Details
       

 03-23-2014
4.00
Wheel well & gear leg well- 02
Details
       

 03-23-2014
4.00
Wheel well & gear leg well- 01
Details
       

 03-22-2014
5.00
Vent line, mouse holes, gear leg baffle.
Details
       

 03-21-2014
4.50
Flanges, fit baffles , mouse holes Friday night
Details
       

 03-20-2014
3.00
Install flanges, fit baffles and fuel line made.
Details
       

 03-19-2014
1.50
Clean up trough hole and install fuel line
Details
       

 03-18-2014
2.50
Clean up hard points, made line,triax & bid @ hole
Details
       

 03-17-2014
3.50
Installed fuel hard points, flange work
Details
       

 03-16-2014
5.00
Clean up, prep for flanges, fill in over leg well
Details
       

 03-15-2014
5.50
2 bids on baggage bulkhead and outer bulkhead
Details
       

 03-14-2014
3.50
Fuel line and back, outside bulkhead 2 bids
Details
       

 03-13-2014
2.00
Worked on fuel bulkhead and back line pic-up
Details
       

 03-12-2014
1.50
Fit fuel bulkheads
Details
       

 03-11-2014
3.50
Wheel well flange clean up and fit Fuel bulkhead
Details
       

 03-09-2014
1.50
Measurements and bondo well. 1
Details
       

 03-09-2014
2.50
Do wheel well flange on top strake. 2
Details
       

 03-09-2014
1.00
Bulkhead glass and flange. 3
Details
       

 03-08-2014
2.50
Second layer of bid cloth on bulkheads
Details
       

 03-03-2014
1.50
Cut relief for wheel when retracted.
Details
     

 03-02-2014
3.00
Fit and glass in section on wheel well
Details
       

 02-24-2014
0.50
Micro fillets on main spar
Details
       

 02-24-2014
2.50
Glass in gear leg well
Details
       

 02-23-2014
5.50
Removed wing and started on wheel well.
Details
       

 02-22-2014
4.00
Glass lower strake to fueslage
Details
       

 02-21-2014
2.00
Prep for lower strake to fuselage lay-ups
Details
       

 02-21-2014
0.75
Cut out baggage access area
Details
     

 02-20-2014
4.00
Lower strake half glassing to main spar
Details
       

 02-19-2014
1.50
2 bid lay up on upper strake
Details
       

 02-18-2014
2.50
Cut and fit upper stake Pilot side
Details
       

 02-17-2014
1.50
2 bid on back of strake
Details
     

 02-16-2014
7.00
Cut end of wing and cut in lower strake
Details
       

 02-15-2014
4.00
Prep for lower Strake
Details
       

 02-13-2014
1.50
Wing strake cutout
Details
       

 02-11-2014
1.00
Paint resin on strake one more time
Details
     

 02-10-2014
2.00
Vent and Fuel line from Strake
Details
       

 02-09-2014
3.00
2 bid on fuel sight gauge
Details
       

 02-06-2014
2.00
Fuel sight gauge
Details
       

 02-05-2014
2.50
Fuel cap installation
Details
       

 02-02-2014
4.00
Micro ,1 bid, & paint resin
Details
       

 02-01-2014
3.00
Grooved out bulkheads and baffles. Add resin to st
Details
       

 01-31-2014
1.00
Videoed the strake baffle for proper clearance
Details
     

 01-30-2014
1.00
Add Flange to baffle
Details
     

 01-28-2014
1.50
Install flange on baggage bulkhead
Details
       

 01-27-2014
2.50
Cleaned up mouse holes and gear socket
Details
       

 01-26-2014
4.00
Added more bid to out side fuel bulkhead
Details
       

 01-25-2014
4.50
Strake baffels bid applyed
Details
       

 01-23-2014
2.00
Bondo Strake baffles in place
Details
     

 01-22-2014
6.00
Installed the wheel well tonight
Details
       

 01-19-2014
2.00
Install flange on gear leg baffle and resin mouse
Details
       

 01-18-2014
4.00
Gear leg baffle install.
Details
       

 01-16-2014
4.00
Fuel screens, bid on flanges, add micro-flox to bu
Details
       

 01-14-2014
3.50
Bid and flange work on bulkheads
Details
       

 01-12-2014
3.00
Fuel vent hard piont installed
Details
       

 01-12-2014
4.00
Bid in the other side of fuel bulkhead
Details
       

 01-11-2014
7.00
Bid in bulkheads and fuel out let
Details
       

 01-10-2014
2.00
Bulkhead hard piont for fitting
Details
       

 01-06-2014
2.50
Floxed on 1.5" flange for rear bulkhead
Details
       

 01-02-2014
1.50
More I beam lay-ups
Details
     

 01-01-2014
2.00
Floxed on angle pices to baffles
Details
       

 12-31-2013
3.00
Lay-up and cut to size 1" angle
Details
       

 12-30-2013
4.00
Sand bulkheads and fill in over leg cover
Details
       

 12-29-2013
3.50
90 degree flanges and moues holes
Details
       

 12-28-2013
6.00
Fit more baffles and lay-ups on bulkheads.
Details
       

 12-27-2013
5.50
Fit bulkheads and baffles
Details
       

 12-26-2013
5.00
Lay-ups for wheel well flange.
Details
     

 12-26-2013
1.50
Cut out more baggage opening
Details
       

 12-25-2013
4.00
Prep top strake for wheel well flange
Details
       

 12-24-2013
1.50
Cut bid for baffles and bulkheads
Details
     

 12-23-2013
3.50
Bid in leg cover and added to wheel well
Details
     

 12-22-2013
5.00
Cut out strake for tire and prep for leg cover
Details
       

 12-21-2013
3.00
Cut out strake for gear leg
Details
       

 12-17-2013
1.50
Trace out bulkheads and baffles for fuel tank
Details
       

 12-15-2013
3.50
Glass strake to fueslage
Details
       

 12-14-2013
4.00
Lower strake glassing to main spar
Details
       

 12-14-2013
2.50
Glass the 4x8 Dyvinicel foam for baffels
Details
       

 12-10-2013
1.50
2 bid on upper Co-Pilot strake
Details
     

 12-08-2013
2.50
Cut out baggage area in the strake
Details
     

 12-04-2013
1.50
Lay - up on bottom strake
Details
     

 12-03-2013
1.50
Fit upper strake on Co-Pilot side
Details
     

 12-02-2013
2.00
Fit the lower Co-Pilot strake
Details
       

 12-01-2013
3.00
Got the Co-Pilot wing on
Details
       

 11-30-2013
2.00
Lower strake alignment
Details
       

 05-05-2013
4.00
Move tubing to out side of keel for cable
Details
       

 05-05-2013
3.00
Intalled fuel shut off cable
Details
       

 05-03-2013
4.00
Fit fuel shut off holder in place
Details
     

 04-30-2013
3.50
Time to make fuel knob holder
Details
       

 04-28-2013
4.50
Tubing was installed for fuel shut off cable.
Details
       

 04-27-2013
4.50
Sump tank go back in
Details
       

 04-05-2013
1.00
Working on the fuel venting
Details
     

 04-05-2013
4.00
Fuel line work
Details
       

 03-03-2013
4.00
Fuel and vent lines
Details
       

 03-02-2013
4.00
Vent lines
Details
       

 03-01-2013
2.00
Sunp tank instllation
Details
     

 01-26-2013
1.50
Tabs for sump tank
Details
     

 01-25-2013
1.50
More resin on header tank
Details
     

 01-19-2013
1.00
Sump tank lid
Details
     

 01-17-2013
2.50
Hard points for fuel inlets
Details
     

 01-15-2013
1.50
Sump tank prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.