Date
|
Hours
|
Work Log Summary
|
Details
|
11-15-2024
|
0.70
|
Replace the P/S/AOA push-on fittings
|
Details
|
|
|
08-10-2024
|
0.40
|
Battery back in and connected
|
Details
|
|
|
07-28-2024
|
4.20
|
Horizontal Stab alignment test
|
Details
|
|
|
07-25-2024
|
2.00
|
Garmin GSA 28 Service Bulletin
|
Details
|
|
|
07-05-2024
|
2.90
|
Baggage door spring
|
Details
|
|
|
07-04-2024
|
1.50
|
Baggage Door latch blocks #3
|
Details
|
|
|
07-03-2024
|
1.90
|
Baggage door latch blocks #2
|
Details
|
|
|
06-26-2024
|
1.80
|
Baggage door latch blocks
|
Details
|
|
|
06-19-2024
|
1.00
|
Skirt sanding for close gap
|
Details
|
|
|
06-19-2024
|
3.50
|
Rivet the baggage door hinge
|
Details
|
|
|
06-17-2024
|
1.10
|
Seal upper firewall
|
Details
|
|
|
06-16-2024
|
1.10
|
Firewall rivets done
|
Details
|
|
|
06-08-2024
|
3.00
|
Pull rivets and next steps
|
Details
|
|
|
06-06-2024
|
3.90
|
Rivet the front top skin
|
Details
|
|
|
06-05-2024
|
3.30
|
Final Prep for top skin rivets
|
Details
|
|
|
06-04-2024
|
3.00
|
Finished glare shield switch and rheo
|
Details
|
|
|
06-02-2024
|
3.00
|
Miscellaneous prep work
|
Details
|
|
|
06-01-2024
|
3.60
|
More glare shield prep
|
Details
|
|
|
05-31-2024
|
0.60
|
Painted the glare shield
|
Details
|
|
|
05-29-2024
|
2.60
|
Forward skin support ribs and TCW IBBS
|
Details
|
|
|
05-27-2024
|
3.10
|
Vent slats in the top skin + canopy fit
|
Details
|
|
|
05-23-2024
|
1.60
|
Vent scat, oil line fittings, and cowl spacer
|
Details
|
|
|
05-21-2024
|
2.00
|
Pitot/AOA/Static connections
|
Details
|
|
|
05-16-2024
|
2.50
|
Fuel Vent and glareshield holes
|
Details
|
|
|
05-14-2024
|
2.60
|
Fuel Vent and Flap Sensor work
|
Details
|
|
|
05-11-2024
|
5.90
|
Misc work - Flap Sensor, GPS antenna, vacuum
|
Details
|
|
|
05-09-2024
|
2.20
|
Pitot/AOA tubing routing
|
Details
|
|
|
12-17-2023
|
0.50
|
Step platform
|
Details
|
|
|
09-27-2023
|
1.10
|
Bellcrank Orientation Fix Final
|
Details
|
|
|
09-26-2023
|
2.80
|
Bellcrank Orientation Fix #2
|
Details
|
|
|
09-24-2023
|
3.60
|
Bellcrank Orientation Fix
|
Details
|
|
|
09-10-2023
|
1.10
|
Control stick movement issue
|
Details
|
|
|
04-29-2023
|
1.30
|
Torque the Landing Gear nuts
|
Details
|
|
|
02-05-2023
|
2.70
|
Prepping and Priming
|
Details
|
|
|
02-03-2023
|
1.00
|
Manufacture the tie-down anchor
|
Details
|
|
|
01-26-2023
|
1.10
|
Pilot Stick labels and schematic update
|
Details
|
|
|
01-21-2023
|
14.00
|
Many items crossed off the to-do list
|
Details
|
|
|
01-17-2023
|
0.70
|
Install flexible brake lines
|
Details
|
|
|
11-13-2022
|
3.50
|
Landing gear and misc. priming
|
Details
|
|
|
11-12-2022
|
0.40
|
Primer Prep taping
|
Details
|
|
|
06-15-2022
|
1.20
|
Remove Exterior Canopy Handle
|
Details
|
|
|
06-03-2022
|
0.50
|
Seat check
|
Details
|
|
|
05-20-2022
|
2.00
|
More labels
|
Details
|
|
|
04-25-2022
|
0.40
|
Seats arrive!
|
Details
|
|
|
03-03-2022
|
0.00
|
Panel Labels - revisions #2
|
Details
|
|
|
03-03-2022
|
2.00
|
Panel Labels - revisions
|
Details
|
|
|
02-12-2022
|
2.00
|
Second label order finalization
|
Details
|
|
|
02-10-2022
|
1.00
|
Seat heat wire issues to resolve
|
Details
|
|
|
01-17-2022
|
1.50
|
PIC/GIB Seat core fitting
|
Details
|
|
|
01-05-2022
|
1.20
|
Seat core test - PIC
|
Details
|
|
|
12-14-2021
|
1.00
|
Seat cushion cores arrived
|
Details
|
|
|
11-24-2021
|
1.80
|
Panel Labels
|
Details
|
|
|
11-18-2021
|
1.00
|
Seat dimensions - Final decision
|
Details
|
|
|
11-17-2021
|
2.50
|
Seat cushion dimensions - Part 1
|
Details
|
|
|
11-16-2021
|
1.00
|
Wood cutting for seat planks
|
Details
|
|
|
11-09-2021
|
1.10
|
Worked on placing the seat order
|
Details
|
|
|
06-27-2021
|
1.50
|
Riveting the Doubler
|
Details
|
|
|
06-26-2021
|
1.90
|
Standoffs, nutplates
|
Details
|
|
|
06-23-2021
|
1.00
|
Antenna Doubler - nutplates, final prep
|
Details
|
|
|
06-19-2021
|
3.50
|
Prime doubler, standoffs, misc.
|
Details
|
|
|
05-05-2021
|
1.00
|
Cabin heat cable run
|
Details
|
|
|
04-25-2021
|
0.30
|
Rivet Battery Tray
|
Details
|
|
|
04-24-2021
|
1.50
|
Replace / Upgrade hardware, Cabin Heat Box
|
Details
|
|
|
04-24-2021
|
0.50
|
Front Baggage Hinge Support
|
Details
|
|
|
04-24-2021
|
1.00
|
Battery Tray build
|
Details
|
|
|
03-31-2021
|
1.50
|
Replace Static Line
|
Details
|
|
|
03-28-2021
|
1.00
|
Parking Brake Cable #6
|
Details
|
|
|
03-27-2021
|
2.50
|
Parking Brake Cable #5
|
Details
|
|
|
03-25-2021
|
2.00
|
Parking Brake Cable #4
|
Details
|
|
|
03-23-2021
|
0.00
|
Parking Brake Cable #3
|
Details
|
|
|
03-23-2021
|
3.00
|
Parking Brake Cable #2
|
Details
|
|
|
03-22-2021
|
1.20
|
Parking Brake Cable #1
|
Details
|
|
|
03-20-2021
|
1.90
|
B. Primer and paint on the panel and others
|
Details
|
|
|
03-20-2021
|
2.00
|
A. Final Prep before Priming / Paint
|
Details
|
|
|
03-14-2021
|
1.30
|
Remove panel in prep for primer
|
Details
|
|
|
02-23-2021
|
0.50
|
Unpack Final panel - quick install
|
Details
|
|
|
12-13-2020
|
0.50
|
Steel Nuts
|
Details
|
|
|
11-28-2020
|
2.30
|
Firewall cowl hinges
|
Details
|
|
|
11-25-2020
|
1.00
|
Built a cardboard battery mockup
|
Details
|
|
|
11-15-2020
|
2.20
|
Service Letter-00014 Tail cone Stiffener
|
Details
|
|
|
07-19-2020
|
0.50
|
Front cockpit screen
|
Details
|
|
|
06-16-2020
|
0.70
|
Grind down the buss bolts
|
Details
|
|
|
06-15-2020
|
1.00
|
Lower baggage area
|
Details
|
|
|
06-13-2020
|
3.10
|
The tool is ready - let's torque
|
Details
|
|
|
06-12-2020
|
2.00
|
Tooling process, Nut-torquer V2.0
|
Details
|
|
|
06-11-2020
|
2.10
|
Two steps backwards...
|
Details
|
|
|
06-08-2020
|
0.40
|
Remove LG bolts that were too short
|
Details
|
|
|
05-25-2020
|
2.50
|
Replace Van's fuel gages with drink holder
|
Details
|
|
|
05-11-2020
|
1.00
|
Installing U-803 Outboard wear plates
|
Details
|
|
|
05-09-2020
|
2.00
|
Installed parking brake brackets
|
Details
|
|
|
05-08-2020
|
1.00
|
Finished brake line fitting and flaring
|
Details
|
|
|
05-07-2020
|
1.00
|
Switched the inner wear plates
|
Details
|
|
|
05-03-2020
|
9.00
|
Re-make the brake lines
|
Details
|
|
|
05-02-2020
|
1.50
|
Landing gear hardware install for brakes
|
Details
|
|
|
04-30-2020
|
2.00
|
Left brake line redo
|
Details
|
|
|
04-26-2020
|
1.00
|
Throttle assembly re-install
|
Details
|
|
|
04-25-2020
|
4.50
|
Fab the parking brake cable brackets
|
Details
|
|
|
12-26-2019
|
2.20
|
Panel riveting
|
Details
|
|
|
11-11-2019
|
4.00
|
Seat Mod & Rear seat hinge
|
Details
|
|
|
10-08-2019
|
1.20
|
Remove worm clamps on smoke tank
|
Details
|
|
|
10-07-2019
|
1.00
|
Static line "T" – secure with zip ties
|
Details
|
|
|
09-29-2019
|
0.50
|
A. Greasing the wheel bearings
|
Details
|
|
|
09-28-2019
|
7.00
|
B. Cypering and install work on the smoke system
|
Details
|
|
|
09-28-2019
|
2.00
|
A. Ran the static line up to the panel
|
Details
|
|
|
09-08-2019
|
1.00
|
Smoke System decisions
|
Details
|
|
|
08-18-2019
|
2.50
|
Storage - latch and primer
|
Details
|
|
|
08-03-2019
|
1.50
|
Storage door work
|
Details
|
|
|
07-31-2019
|
2.50
|
More storage door and lip work
|
Details
|
|
|
07-22-2019
|
1.70
|
Canopy storage door
|
Details
|
|
|
06-12-2019
|
2.00
|
Storage door work
|
Details
|
|
|
04-16-2019
|
1.30
|
Proper orientation of the parking brake
|
Details
|
|
|
03-31-2019
|
1.00
|
parking brake install
|
Details
|
|
|
03-02-2019
|
1.50
|
Parking brake install
|
Details
|
|
|
03-02-2019
|
1.00
|
Panel cut for front air vent
|
Details
|
|
|
08-10-2018
|
2.50
|
Canopy slide rail mod - redo
|
Details
|
|
|
05-24-2018
|
1.00
|
Empennage Fairing
|
Details
|
|
|
04-05-2018
|
1.40
|
Redo Brake Lines
|
Details
|
|
|
03-31-2018
|
2.70
|
Console storage - finished up exterior
|
Details
|
|
|
03-29-2018
|
2.00
|
console storage - bond flange to box
|
Details
|
|
|
03-27-2018
|
1.00
|
more console and flange sanding
|
Details
|
|
|
03-23-2018
|
3.70
|
Console storage - foam removal, sanding
|
Details
|
|
|
03-20-2018
|
1.00
|
Console storage - flange work
|
Details
|
|
|
03-19-2018
|
2.00
|
Console storage flanges, another partial layer
|
Details
|
|
|
03-18-2018
|
0.80
|
Console storage
|
Details
|
|
|
03-16-2018
|
1.00
|
Console storage work
|
Details
|
|
|
03-06-2018
|
2.30
|
Fiberglass console - 2nd layers
|
Details
|
|
|
03-05-2018
|
2.60
|
Fiberglass console storage
|
Details
|
|
|
03-04-2018
|
3.00
|
Fiberglass right console
|
Details
|
|
|
03-01-2018
|
1.00
|
Brake lines from reservoir to pedals
|
Details
|
|
|
02-25-2018
|
3.00
|
Brake lines to the gear
|
Details
|
|
|
02-19-2018
|
1.30
|
Safety wire the flap rod end bearing
|
Details
|
|
|
02-16-2018
|
3.00
|
Gear / Brake line decision, tweak fuel lines
|
Details
|
|
|
01-29-2018
|
1.50
|
Brake System
|
Details
|
|
|
01-27-2018
|
3.00
|
Fuel lines - done...
|
Details
|
|
|
01-26-2018
|
1.90
|
Rear seat rudder pedals - drilling pushrods
|
Details
|
|
|
01-22-2018
|
2.50
|
Finished rear seat rudder pedals - almost
|
Details
|
|
|
01-21-2018
|
1.00
|
Rear seat rudder pedals – pedal install
|
Details
|
|
|
01-20-2018
|
4.20
|
Fuel system work
|
Details
|
|
|
01-16-2018
|
3.70
|
Rear Seat Rudder Pedals #1
|
Details
|
|
|
01-07-2018
|
2.20
|
Reassembled the Rudder pedals and re-installed
|
Details
|
|
|
01-01-2018
|
3.00
|
Rudder Pedal extensions
|
Details
|
|
|
12-10-2017
|
1.30
|
Rudder pedal extensions
|
Details
|
|
|
06-20-2017
|
1.60
|
Baggage door lock - finished
|
Details
|
|
|
06-14-2017
|
2.00
|
Baggage Door Reveal & Lock
|
Details
|
|
|
06-11-2017
|
2.30
|
Baggage Door – continued, Part 3
|
Details
|
|
|
06-10-2017
|
1.70
|
Baggage Door – continued, Part 2
|
Details
|
|
|
06-10-2017
|
1.80
|
Baggage Door – continued
|
Details
|
|
|
06-10-2017
|
2.40
|
Aft fuselage skin rivets – Part 2
|
Details
|
|
|
06-10-2017
|
2.00
|
Aft fuselage skin rivets – Part 1
|
Details
|
|
|
06-09-2017
|
1.50
|
Ran conduit
|
Details
|
|
|
06-07-2017
|
3.00
|
Magnetometer shelf behind the aft baggage
|
Details
|
|
|
06-04-2017
|
0.50
|
Static line removal to open up holes
|
Details
|
|
|
05-28-2017
|
4.00
|
Access under aft baggage shelf – day 1 and 2
|
Details
|
|
|
05-14-2017
|
2.50
|
Pitch trim servo hardware pre-install
|
Details
|
|
|
05-13-2017
|
2.30
|
ELT mount Prep, Prime....then Riveted
|
Details
|
|
|
05-12-2017
|
2.00
|
ELT stiffeners V2.0
|
Details
|
|
|
05-09-2017
|
0.70
|
Fab the ELT stiffeners
|
Details
|
|
|
05-09-2017
|
2.00
|
ELT mounting platform
|
Details
|
|
|
05-04-2017
|
1.00
|
ELT mount and shop clean up
|
Details
|
|
|
04-24-2017
|
0.90
|
Rivet the rudder cable fairings
|
Details
|
|
|
04-23-2017
|
1.90
|
Finish prepping for the rudder cable fairings
|
Details
|
|
|
04-22-2017
|
2.30
|
C. Rudder cable exit fairing, Part 1
|
Details
|
|
|
04-22-2017
|
1.00
|
B. Riveting / Bolting the Elevator stops
|
Details
|
|
|
04-22-2017
|
1.00
|
A. Empennage disassemble for riveting
|
Details
|
|
|
04-17-2017
|
0.20
|
Removed the tie-down ring storage
|
Details
|
|
|
04-15-2017
|
1.80
|
Baggage Door - cleco, rivet
|
Details
|
|
|
04-09-2017
|
3.00
|
Prep and Prime of the FWD top skin and door
|
Details
|
|
|
04-08-2017
|
1.00
|
Prep the shop for canopy p/u
|
Details
|
|
|
03-29-2017
|
0.90
|
Baggage door deburring, Part C
|
Details
|
|
|
03-23-2017
|
0.00
|
Baggage door drilling and deburring, Part B
|
Details
|
|
|
03-23-2017
|
2.50
|
Baggage door drilling and deburring
|
Details
|
|
|
03-22-2017
|
1.90
|
Baggage Door parts deburring
|
Details
|
|
|
03-21-2017
|
1.00
|
Dimpling Fwd top skin parts & bulkheads
|
Details
|
|
|
03-20-2017
|
2.50
|
deburring and dimpling Fwd Fuse top skin
|
Details
|
|
|
03-18-2017
|
3.50
|
F-821-1 Fwd Top fuselage skin
|
Details
|
|
|
03-17-2017
|
1.00
|
F-803C-1 Instrument panel attach flange
|
Details
|
|
|
03-16-2017
|
2.00
|
Fwd fuselage top skin
|
Details
|
|
|
02-18-2017
|
2.00
|
F-866A-1/B1 upper/lower fwd baggage bulkheads
|
Details
|
|
|
02-17-2017
|
2.00
|
Panel
|
Details
|
|
|
02-11-2017
|
2.00
|
Painting of some odds and ends
|
Details
|
|
|
02-11-2017
|
2.00
|
A visit from the technical counselor
|
Details
|
|
|
02-07-2017
|
1.30
|
Upper / Lower front baggage bulkheads
|
Details
|
|
|
02-07-2017
|
1.30
|
Drilling the WD-814 Windscreen support
|
Details
|
|
|
02-06-2017
|
2.00
|
Miscellaneous catch up
|
Details
|
|
|
02-03-2017
|
0.00
|
Van's Static system #2
|
Details
|
|
|
02-03-2017
|
4.00
|
Van's Static system #1
|
Details
|
|
|
02-02-2017
|
2.50
|
Elevator stop - Up
|
Details
|
|
|
01-31-2017
|
0.50
|
Rudder stop rivets and some blind rivets
|
Details
|
|
|
01-25-2017
|
1.90
|
Rudder stops, shape, c/s, deburr, prime
|
Details
|
|
|
01-23-2017
|
1.70
|
2. Rudder pedal install
|
Details
|
|
|
01-23-2017
|
1.50
|
1. Rudder control cable install
|
Details
|
|
|
01-22-2017
|
3.00
|
Rudder stops / limit set
|
Details
|
|
|
01-22-2017
|
2.30
|
Rear baggage tie downs for F869 bulkhead gussets
|
Details
|
|
|
01-21-2017
|
1.50
|
Setting elevator travel limits
|
Details
|
|
|
01-19-2017
|
2.50
|
Disassemble elevator, fill bellcrank, reassemble,
|
Details
|
|
|
01-17-2017
|
1.50
|
Flap motor
|
Details
|
|
|
01-16-2017
|
4.00
|
Mounting pushrods/HS/Elevators
|
Details
|
|
|
12-16-2016
|
2.00
|
installed controls, sticks and pushrods
|
Details
|
|
|
12-12-2016
|
1.00
|
removing trim tape from interior
|
Details
|
|
|
12-11-2016
|
0.00
|
3. Painting the interior - continued
|
Details
|
|
|
12-11-2016
|
3.00
|
2. Painting the interior
|
Details
|
|
|
12-11-2016
|
1.50
|
1. Interior paint setup
|
Details
|
|
|
12-10-2016
|
2.00
|
Paint prep
|
Details
|
|
|
12-03-2016
|
0.00
|
3...Interior paint parts - not in the fuse
|
Details
|
|
|
12-03-2016
|
6.50
|
2...Taping off the parts I don't want paint on
|
Details
|
|
|
12-03-2016
|
3.50
|
1...Pre-work to Prep work
|
Details
|
|
|
12-01-2016
|
3.30
|
Conception, design and build of the “caboose”
|
Details
|
|
|
11-30-2016
|
1.00
|
Picked up the upgraded rotisserie
|
Details
|
|
|
11-16-2016
|
2.00
|
Working on the rotisserie
|
Details
|
|
|
11-16-2016
|
1.20
|
Drill engine mount holes
|
Details
|
|
|
11-12-2016
|
2.30
|
engine mount holes
|
Details
|
|
|
11-08-2016
|
1.40
|
Masking and rotisserie (engine stand)
|
Details
|
|
|
11-06-2016
|
2.20
|
Control column in the fuse
|
Details
|
|
|
11-05-2016
|
2.50
|
Control column assembly
|
Details
|
|
|
11-01-2016
|
0.40
|
Rivet and prime exterior of F-840
|
Details
|
|
|
10-31-2016
|
2.20
|
F-840, F-839 pushrods
|
Details
|
|
|
10-12-2016
|
1.00
|
Welding the hole shut
|
Details
|
|
|
10-12-2016
|
0.50
|
Priming the exterior of the F-841 pushrod
|
Details
|
|
|
10-11-2016
|
0.50
|
Priming the inside of F-841 pushrod
|
Details
|
|
|
10-10-2016
|
2.50
|
F841 Pushrod
|
Details
|
|
|
10-02-2016
|
2.60
|
Drilling the elevator horns
|
Details
|
|
|
09-28-2016
|
0.90
|
Bellcrank Prep and prime
|
Details
|
|
|
09-24-2016
|
2.00
|
Elevator fitting
|
Details
|
|
|
09-13-2016
|
0.00
|
Rear throttle handle
|
Details
|
|
|
09-07-2016
|
0.50
|
VS spacer and attach rivets
|
Details
|
|
|
09-05-2016
|
3.00
|
Empennage Attach - Finish critical drilling
|
Details
|
|
|
09-04-2016
|
4.00
|
Empennage Attach - Vertical Stab drill
|
Details
|
|
|
09-03-2016
|
3.00
|
Empennage Attach - Drill HS
|
Details
|
|
|
09-01-2016
|
2.50
|
Empennage Attach – Level fuse
|
Details
|
|
|
08-27-2016
|
3.80
|
finished rivets in the gear towers
|
Details
|
|
|
08-23-2016
|
0.50
|
Rear seat back rivets
|
Details
|
|
|
07-04-2016
|
0.00
|
Milestone...
|
Details
|
|
|
07-04-2016
|
2.20
|
forward seat ramp - rivet platenuts
|
Details
|
|
|
07-02-2016
|
1.30
|
Prime all parts to this point
|
Details
|
|
|
07-01-2016
|
1.40
|
Prep parts for primer
|
Details
|
|
|
06-30-2016
|
5.00
|
Aft top skin and misc
|
Details
|
|
|
06-29-2016
|
2.00
|
Hardwoods installed
|
Details
|
|
|
06-25-2016
|
1.70
|
Aft upper skin and bulkheads and misc
|
Details
|
|
|
06-23-2016
|
1.00
|
tap cable anchor
|
Details
|
|
|
06-22-2016
|
2.00
|
F-864E-1 cable anchor (engine control)
|
Details
|
|
|
06-12-2016
|
1.30
|
right console nutplates and more tapping
|
Details
|
|
|
06-11-2016
|
1.50
|
seat ramp stuff
|
Details
|
|
|
06-11-2016
|
1.00
|
nutplates in the longerons
|
Details
|
|
|
06-04-2016
|
2.50
|
mid cabin covers
|
Details
|
|
|
06-02-2016
|
1.00
|
drilled out a few front cooling ramp rivets
|
Details
|
|
|
05-31-2016
|
3.00
|
Gear Box screws
|
Details
|
|
|
05-30-2016
|
1.00
|
F-861-PP Landing gear cover plates
|
Details
|
|
|
05-29-2016
|
3.00
|
rivet in the cooling ramp
|
Details
|
|
|
05-27-2016
|
0.40
|
enlarge aft cooling ramp rivet holes
|
Details
|
|
|
05-26-2016
|
2.00
|
bottom forward skins riveted
|
Details
|
|
|
05-21-2016
|
3.00
|
Glue cooling ramp rib & other misc stuff
|
Details
|
|
|
05-09-2016
|
2.50
|
Finished riveting F-850-1
|
Details
|
|
|
03-17-2016
|
0.00
|
Riveting F-851 Bottom Floor Skin (B)
|
Details
|
|
|
03-17-2016
|
3.00
|
Riveting F-851 Bottom Floor Skin (A)
|
Details
|
|
|
03-08-2016
|
0.20
|
Test of Fire Barrier in shear
|
Details
|
|
|
03-06-2016
|
0.00
|
F-861-PP Gear covers (B)
|
Details
|
|
|
03-06-2016
|
3.00
|
F-861-PP Gear covers (A)
|
Details
|
|
|
02-15-2016
|
1.50
|
cooling ramp / floor support
|
Details
|
|
|
02-01-2016
|
0.70
|
Prep / Prime the bottom front skins
|
Details
|
|
|
01-22-2016
|
1.20
|
Prep work for bottom front skin priming
|
Details
|
|
|
01-19-2016
|
1.50
|
lower front skin cutting and smoothing to LG
|
Details
|
|
|
01-18-2016
|
4.50
|
landing gear prep work for lower skin riveting
|
Details
|
|
|
01-16-2016
|
0.50
|
SS Cooling Ramp v2.1 #7
|
Details
|
|
|
01-15-2016
|
1.50
|
SS Cooling Ramp v2.1 #6
|
Details
|
|
|
01-14-2016
|
0.50
|
SS Cooling Ramp v2.1 #5
|
Details
|
|
|
01-11-2016
|
2.50
|
SS Cooling Ramp v2.1 #4
|
Details
|
|
|
01-10-2016
|
1.90
|
SS Cooling Ramp v2.1 #3
|
Details
|
|
|
01-09-2016
|
1.00
|
SS Cooling Ramp v2.1 #2
|
Details
|
|
|
01-08-2016
|
1.50
|
SS Cooling Ramp v2.1 #1
|
Details
|
|
|
12-20-2015
|
1.30
|
Stainless Steel Cooling Ramp Mod #4
|
Details
|
|
|
12-19-2015
|
1.50
|
Stainless Steel Cooling Ramp Mod #3
|
Details
|
|
|
12-15-2015
|
1.70
|
Stainless Steel Cooling Ramp Mod #2
|
Details
|
|
|
12-14-2015
|
0.70
|
Stainless Steel Cooling Ramp Mod #1
|
Details
|
|
|
12-12-2015
|
0.00
|
Forward Bottom Skins #2
|
Details
|
|
|
12-12-2015
|
6.10
|
Forward Bottom Skins #1
|
Details
|
|
|
10-29-2015
|
2.30
|
Prep baggage parts for primer/paint & Misc.
|
Details
|
|
|
10-28-2015
|
2.00
|
Battling the rear seat back rivets
|
Details
|
|
|
10-27-2015
|
0.00
|
photo op with the floors and seats intalled
|
Details
|
|
|
10-27-2015
|
2.00
|
Floor nutplates, seat back hinges and footwells
|
Details
|
|
|
10-26-2015
|
2.00
|
Seat floors – back riveting stiffeners
|
Details
|
|
|
10-25-2015
|
1.00
|
Riveting rear seat back – upper support
|
Details
|
|
|
10-22-2015
|
1.10
|
Rivet the front seatback
|
Details
|
|
|
10-18-2015
|
3.00
|
Seatbacks and floor parts primed
|
Details
|
|
|
10-17-2015
|
4.80
|
Floors - drilling, deburring and dimpling + prime
|
Details
|
|
|
09-25-2015
|
1.20
|
Seat floors - stiffeners
|
Details
|
|
|
09-24-2015
|
2.10
|
Seat Floors - front floor / foot wells
|
Details
|
|
|
09-23-2015
|
3.00
|
Seat Floors - brackets, front hinge, and keeper
|
Details
|
|
|
09-20-2015
|
2.00
|
Seat Floors - Flap bearing blocks
|
Details
|
|
|
09-15-2015
|
2.00
|
Seat Floors - more deburring and drilling
|
Details
|
|
|
09-14-2015
|
1.30
|
Seat Floors - Deburring
|
Details
|
|
|
09-10-2015
|
0.70
|
Rear Seat Back - finish prep
|
Details
|
|
|
09-09-2015
|
2.50
|
Rear Seat Back - start
|
Details
|
|
|
09-09-2015
|
1.40
|
Front Seat Back - finished
|
Details
|
|
|
09-08-2015
|
1.50
|
Front Seat Back
|
Details
|
|
|
08-30-2015
|
0.30
|
Reversing AN3 bolts in the gear tower
|
Details
|
|
|
08-26-2015
|
1.00
|
Bob Avery drilled the inboard gear holes
|
Details
|
|
|
08-23-2015
|
3.70
|
Drilled landing gear mounting holes!
|
Details
|
|
|
08-22-2015
|
4.00
|
Landing gear drill prep
|
Details
|
|
|
08-22-2015
|
2.00
|
Finish aft skin rivets on F-823, F-826/F-827
|
Details
|
|
|
08-22-2015
|
3.00
|
F-820-L/R-1 forward side skins - finished for now
|
Details
|
|
|
08-20-2015
|
3.00
|
more riveting of F-820-L/R-1 forward side skins
|
Details
|
|
|
08-16-2015
|
3.50
|
Panel back modification #3 + rear throttle
|
Details
|
|
|
08-15-2015
|
2.50
|
Panel back modification #2
|
Details
|
|
|
08-14-2015
|
1.70
|
Panel back modification #1
|
Details
|
|
|
08-01-2015
|
1.00
|
Game plan the measuring of the landing gear
|
Details
|
|
|
07-26-2015
|
1.00
|
thinning left side of landing gear
|
Details
|
|
|
07-26-2015
|
3.30
|
Landing gear
|
Details
|
|
|
07-25-2015
|
1.00
|
finish installing the WD-823 seat back support
|
Details
|
|
|
07-23-2015
|
3.30
|
last of the seatback rivets and the weldment
|
Details
|
|
|
07-13-2015
|
1.70
|
More riveting of the F-817-L/R-1 seat back support
|
Details
|
|
|
07-08-2015
|
0.30
|
a bit more riveting of the F-820-R-1 fwd side skin
|
Details
|
|
|
07-05-2015
|
1.70
|
Finish cockpit rails & F-817-1 seatback supports
|
Details
|
|
|
07-04-2015
|
1.50
|
F-816-L/R-1 Cockpit side rails
|
Details
|
|
|
07-03-2015
|
2.30
|
more riveting of F-820-L/R-1 forward side skins
|
Details
|
|
|
07-01-2015
|
1.40
|
more riveting of F-820-L/R-1 forward side skins
|
Details
|
|
|
06-29-2015
|
1.20
|
more riveting of F-820-L/R-1 forward side skins
|
Details
|
|
|
06-26-2015
|
0.70
|
more riveting of F-820-L/R-1 forward side skins
|
Details
|
|
|
06-25-2015
|
1.50
|
Rivet F-820-L/R-1 Forward side skins
|
Details
|
|
|
06-25-2015
|
1.50
|
Prep for riveting F-820-L/R-1 fwd side skins
|
Details
|
|
|
06-23-2015
|
1.00
|
SV-1 cockpit air vent in fuselage
|
Details
|
|
|
06-21-2015
|
2.70
|
Fuse stuff – making more tubing
|
Details
|
|
|
06-18-2015
|
0.50
|
landing gear #1
|
Details
|
|
|
06-14-2015
|
2.20
|
rear seat throttle - delrin slides
|
Details
|
|
|
06-13-2015
|
5.50
|
rear seat throttle
|
Details
|
|
|
06-12-2015
|
2.70
|
Riveted pitch servo bracket and some other things
|
Details
|
|
|
06-11-2015
|
0.70
|
Prep and prime the F-805F-1 Spacer
|
Details
|
|
|
06-10-2015
|
0.00
|
spacers and gussets and supports - oh my!
|
Details
|
|
|
06-10-2015
|
2.00
|
Prep pitch servo brackets
|
Details
|
|
|
06-09-2015
|
1.90
|
Rivet bellcrank rib, F-818D-1
|
Details
|
|
|
06-08-2015
|
1.50
|
Autopilot, pitch control bracket measuring
|
Details
|
|
|
06-07-2015
|
3.00
|
aft deck riveted on
|
Details
|
|
|
06-06-2015
|
2.00
|
Some center section backriveting
|
Details
|
|
|
05-25-2015
|
2.30
|
...more bottom skins rivets - getting close
|
Details
|
|
|
05-24-2015
|
1.70
|
More bottom skin rivets
|
Details
|
|
|
05-24-2015
|
0.50
|
A practice session
|
Details
|
|
|
05-18-2015
|
0.50
|
Frustration with rivets
|
Details
|
|
|
05-16-2015
|
2.00
|
gear work, misc, clean up
|
Details
|
|
|
05-15-2015
|
1.60
|
More bottom skin rivets - F-826/F-827
|
Details
|
|
|
05-12-2015
|
1.50
|
Rivet bottom skin F-842-1
|
Details
|
|
|
04-27-2015
|
0.00
|
Smoke System
|
Details
|
|
|
04-02-2015
|
1.00
|
notched the F802-K's
|
Details
|
|
|
03-28-2015
|
1.30
|
More deconstruction of intercoastal ribs F-802M
|
Details
|
|
|
03-27-2015
|
0.00
|
Why the one piece Grove gear modification? (Pt.2)
|
Details
|
|
|
03-27-2015
|
0.00
|
Why the one piece Grove gear modification?
|
Details
|
|
|
03-26-2015
|
0.90
|
Deconstruct F-802M intercoastal ribs for LG
|
Details
|
|
|
03-23-2015
|
0.30
|
Unwrap and Inventory Landing gear
|
Details
|
|
|
03-22-2015
|
1.00
|
Inspect fuel/air tubing flares
|
Details
|
|
|
03-16-2015
|
0.00
|
Grove has my gear ready to ship!
|
Details
|
|
|
02-12-2015
|
1.00
|
Rock n' Roll...she's inverted
|
Details
|
|
|
02-08-2015
|
1.00
|
A few more rivets and ready to "roll"
|
Details
|
|
|
02-01-2015
|
1.00
|
"Stupid Tax" payment
|
Details
|
|
|
01-31-2015
|
1.00
|
Skin Riveting – Finish F-824R
|
Details
|
|
|
01-27-2015
|
1.90
|
Skin Riveting – F-824R, F-828
|
Details
|
|
|
01-25-2015
|
3.70
|
Skin Riveting - F823R, F824L, F828L
|
Details
|
|
|
01-24-2015
|
4.50
|
Skin Riveting - F-823-1 L/R
|
Details
|
|
|
01-23-2015
|
0.70
|
Skin Riveting - F-823-1 L/R
|
Details
|
|
|
01-22-2015
|
2.00
|
Skin Riveting - F-823-1 L/R & parts dump
|
Details
|
|
|
01-18-2015
|
2.30
|
Skin Riveting - F-823-1 L/R
|
Details
|
|
|
01-15-2015
|
1.00
|
Rear Throttle
|
Details
|
|
|
01-03-2015
|
4.00
|
Fuel Vents - Lower part
|
Details
|
|
|
01-01-2015
|
1.50
|
Clean up and sawhorse raising
|
Details
|
|
|
12-31-2014
|
0.00
|
Fuel Gauge ramp - Side cover #2
|
Details
|
|
|
12-31-2014
|
4.60
|
Fuel Gauge ramp - Side cover
|
Details
|
|
|
12-27-2014
|
1.00
|
More fuel gauge ramp work
|
Details
|
|
|
12-26-2014
|
5.00
|
Redo spacers / fuel gauge ramp
|
Details
|
|
|
12-23-2014
|
2.50
|
Add unions to fuel vents - fuse to sawhorse
|
Details
|
|
|
12-17-2014
|
2.00
|
Built sawhorse for fuse riveting
|
Details
|
|
|
12-16-2014
|
1.00
|
Bent right tank tube exit, saw horse planning
|
Details
|
|
|
12-13-2014
|
0.50
|
Rudder stop mod adjustment
|
Details
|
|
|
12-13-2014
|
3.70
|
Fuel line - Redo the right and left tank line
|
Details
|
|
|
12-12-2014
|
2.70
|
Brake Lines
|
Details
|
|
|
12-10-2014
|
2.00
|
Fuel Vent tubes
|
Details
|
|
|
12-09-2014
|
0.70
|
Rudder pedal brake fittings
|
Details
|
|
|
12-09-2014
|
0.50
|
Fuel Vent tubes
|
Details
|
|
|
12-04-2014
|
0.30
|
Skunkworks - fuel gauges (#2)
|
Details
|
|
|
12-04-2014
|
1.50
|
Skunkworks - fuel gauges
|
Details
|
|
|
11-26-2014
|
3.40
|
Fuel Lines - #5
|
Details
|
|
|
11-22-2014
|
0.00
|
Fuel Lines - #4
|
Details
|
|
|
11-22-2014
|
4.50
|
Fuel Lines - #3
|
Details
|
|
|
11-21-2014
|
0.00
|
Fuel Lines - #2
|
Details
|
|
|
11-21-2014
|
7.00
|
Fuel Lines
|
Details
|
|
|
11-19-2014
|
1.40
|
Rudder Pedals – Finish V2.0
|
Details
|
|
|
11-16-2014
|
5.00
|
Rudder pedals – Finish
|
Details
|
|
|
11-12-2014
|
1.80
|
Rudder pedals - #3
|
Details
|
|
|
11-11-2014
|
1.50
|
Rudder pedals - #2
|
Details
|
|
|
11-09-2014
|
3.30
|
Rudder pedals - cockpit adjustable
|
Details
|
|
|
11-09-2014
|
2.10
|
Final Fuse Assembly – Fuel filter & pump
|
Details
|
|
|
11-08-2014
|
7.00
|
Final Fuse Assembly - Cleco the fuse back together
|
Details
|
|
|
11-07-2014
|
2.00
|
Final Fuse Assembly - F-824 Skins
|
Details
|
|
|
11-06-2014
|
1.20
|
Final Fuse Assembly – Prime F-824’s
|
Details
|
|
|
11-05-2014
|
1.90
|
Fuse Final Assembly – Bulkhead 807
|
Details
|
|
|
10-23-2014
|
2.50
|
Final Fuse Assembly – Upper Engine Bracket / Longe
|
Details
|
|
|
10-22-2014
|
5.00
|
Final Fuse assembly - Mid Side Skins
|
Details
|
|
|
10-21-2014
|
1.60
|
Fuse Final Assembly – Riveting Outbrd Seat Ribs
|
Details
|
|
|
10-17-2014
|
0.60
|
Fuse Final Assembly - Outboard seat ribs
|
Details
|
|
|
10-16-2014
|
2.60
|
Fuse Final Assembly – Center Section attach
|
Details
|
|
|
10-14-2014
|
2.50
|
Fuse Final Assembly – Lower Longerons
|
Details
|
|
|
10-08-2014
|
5.80
|
Prep/Prime Fuse parts
|
Details
|
|
|
10-05-2014
|
2.20
|
Preparing Fuse Parts for Final Assembly - 9
|
Details
|
|
|
10-04-2014
|
3.80
|
Preparing Fuse Parts for Final Assembly - 8
|
Details
|
|
|
10-03-2014
|
2.60
|
Preparing Fuse Parts for Final Assembly - 7
|
Details
|
|
|
10-02-2014
|
3.00
|
Preparing Fuse Parts for Final Assembly - 6
|
Details
|
|
|
10-01-2014
|
1.20
|
Preparing Fuse Parts for Final Assembly - 5
|
Details
|
|
|
09-30-2014
|
1.20
|
Preparing Fuse Parts for Final Assembly - 4
|
Details
|
|
|
09-29-2014
|
5.00
|
Preparing Fuse Parts for Final Assembly - 3
|
Details
|
|
|
09-28-2014
|
5.00
|
Preparing Fuse Parts for Final Assembly - 2
|
Details
|
|
|
09-27-2014
|
0.90
|
Preparing Fuse Parts for Final Assembly - 1
|
Details
|
|
|
09-27-2014
|
1.00
|
Drilling Fuse Skins - Final Deconstruction
|
Details
|
|
|
09-27-2014
|
1.90
|
Drilling Fuse Skins - Andair Fuel Selector
|
Details
|
|
|
09-26-2014
|
2.00
|
Drilling Fuse Skins - Center section
|
Details
|
|
|
09-25-2014
|
2.00
|
Drilling Fuse Skins - Deconstruction
|
Details
|
|
|
09-24-2014
|
2.50
|
Drilling Fuse Skins – WD-409 access
|
Details
|
|
|
09-23-2014
|
2.50
|
Drilling Fuse Skins – WD-409 Tail Spring
|
Details
|
|
|
09-21-2014
|
1.80
|
Drilling Fuse Skins - Front Seat Support F-823
|
Details
|
|
|
09-21-2014
|
4.00
|
Drilling Fuse Skins - Cockpit Rails and LG boxes
|
Details
|
|
|
09-20-2014
|
2.00
|
Drilling Fuse Skins - Aft Skins, 2
|
Details
|
|
|
09-20-2014
|
4.00
|
Drilling Fuse Skins - Aft Skins
|
Details
|
|
|
09-19-2014
|
3.00
|
Drilling Fuse Skins - Fwd & Mid skins
|
Details
|
|
|
09-18-2014
|
0.60
|
Drilling Fuse Skins – Upper Longerons / F-820
|
Details
|
|
|
09-17-2014
|
3.30
|
Drilling Fuse Skins – Fwd skin & longerons
|
Details
|
|
|
09-16-2014
|
1.40
|
Adding Tailcone to Fwd Fuse - finishing
|
Details
|
|
|
09-14-2014
|
4.00
|
Adding Tailcone to Fwd Fuse – Cockpit rails/caps
|
Details
|
|
|
09-12-2014
|
1.00
|
Adding Tailcone to Fwd Fuse – upper longerons
|
Details
|
|
|
09-11-2014
|
3.00
|
Adding Tailcone to Fwd Fuse – Aft Bottom Skins
|
Details
|
|
|
09-10-2014
|
3.30
|
Adding Tailcone to Fwd Fuse – Deburring/Clecoing
|
Details
|
|
|
09-07-2014
|
1.40
|
Adding Tailcone to Fwd Fuse - edging skins
|
Details
|
|
|
09-07-2014
|
2.80
|
0 Aft Fuselage Assembly - edging, plus a fix
|
Details
|
|
|
09-06-2014
|
1.30
|
Tailcone Bulkheads - riveting
|
Details
|
|
|
09-05-2014
|
4.00
|
Prepping and Priming all previous parts
|
Details
|
|
|
09-04-2014
|
2.50
|
Aft Fuse Assembly
|
Details
|
|
|
09-03-2014
|
2.50
|
Tailcone Bulkheads – F-809, F-808, F-807
|
Details
|
|
|
09-02-2014
|
1.50
|
Tailcone Bulkheads – misc bulkhead work
|
Details
|
|
|
09-01-2014
|
3.70
|
Tailcone Bulkheads – Drilling the WD-409
|
Details
|
|
|
08-31-2014
|
4.70
|
Mid Fuse Structure - Finishing
|
Details
|
|
|
08-31-2014
|
3.00
|
Mid Fuse Structure - Combining with Center Section
|
Details
|
|
|
08-24-2014
|
5.10
|
Mid Fuse Structure - bending bottom of mid skins
|
Details
|
|
|
08-23-2014
|
2.30
|
Mid Fuse Structure - Edging & Deburring
|
Details
|
|
|
08-23-2014
|
1.70
|
Forward Fuse - Aux. Longerons
|
Details
|
|
|
08-22-2014
|
1.80
|
Forward Fuse - Drill the Right Lower Longeron
|
Details
|
|
|
08-21-2014
|
2.90
|
Forward Fuse – Drilling Left Lower Longeron
|
Details
|
|
|
08-20-2014
|
1.80
|
Forward Fuse – deburring and L. Lower Longeron
|
Details
|
|
|
08-19-2014
|
1.00
|
Forward Fuse - gussets and deburring
|
Details
|
|
|
08-17-2014
|
0.50
|
Forward Fuse - F-848-1
|
Details
|
|
|
08-15-2014
|
0.00
|
Bending Longerons (more pics)
|
Details
|
|
|
08-15-2014
|
3.20
|
Bending Longerons
|
Details
|
|
|
08-10-2014
|
1.10
|
Forward Fuse
|
Details
|
|
|
08-10-2014
|
2.10
|
Bend Lower Longerons
|
Details
|
|
|
08-08-2014
|
2.00
|
Seat Rib Sub 11) rivet / finish up
|
Details
|
|
|
08-03-2014
|
1.60
|
Seat Rib Sub 10) Aileron Trim and Bottom Skins
|
Details
|
|
|
08-02-2014
|
4.00
|
Seat Rib Sub 9) Rivet sub assembly
|
Details
|
|
|
07-25-2014
|
3.20
|
Seat Rib Sub 8) Etch, prep, prime seat rib sub
|
Details
|
|
|
07-20-2014
|
2.80
|
Seat Rib Sub 7) Finish Deburring & Dimpling
|
Details
|
|
|
07-19-2014
|
2.70
|
Seat Rib Sub 6) Deburring & Edging
|
Details
|
|
|
07-19-2014
|
1.80
|
Seat Rib Sub 5) Cleco, Drill entire subassembly
|
Details
|
|
|
07-18-2014
|
1.30
|
Seat Rib Sub 4) Cleco & Drill rear spar
|
Details
|
|
|
07-17-2014
|
4.50
|
Center Section - 8) Finished
|
Details
|
|
|
07-16-2014
|
3.00
|
Center Section - 7) more work
|
Details
|
|
|
07-15-2014
|
0.50
|
Forward floor - 3) Rivet firewall
|
Details
|
|
|
07-13-2014
|
1.30
|
Seat Rib Sub 3) Aileron Trim
|
Details
|
|
|
07-11-2014
|
3.30
|
Seat Rib Sub 2) F805D & fwd. inbd seat ribs
|
Details
|
|
|
07-10-2014
|
2.10
|
Seat Rib Sub 1) Start
|
Details
|
|
|
07-09-2014
|
1.00
|
Center Section - 6) finished right - forward bulk
|
Details
|
|
|
07-08-2014
|
1.50
|
Center Section - 5) rivet Left Fwd bulkhead
|
Details
|
|
|
07-06-2014
|
1.70
|
Center Section - 4) Prep & Prime
|
Details
|
|
|
07-05-2014
|
1.60
|
Center Section - 3) Aft Bulkheads
|
Details
|
|
|
07-05-2014
|
3.60
|
Center Section - 2) Forward Bulkhead
|
Details
|
|
|
07-04-2014
|
1.00
|
Center Section - 1) Beginning
|
Details
|
|
|
07-03-2014
|
1.50
|
Forward floor - 2) firewall prep for rivets
|
Details
|
|
|
07-03-2014
|
1.50
|
Forward floor - 1) mid cabin braces
|
Details
|
|
|
07-02-2014
|
1.00
|
More riveting - forward substructure
|
Details
|
|
|
07-02-2014
|
2.20
|
Forward fuse structure - radius washers
|
Details
|
|
|
06-29-2014
|
5.00
|
Prep,etch and prime forward fuselage sub-structure
|
Details
|
|
|
06-28-2014
|
4.60
|
Finished Riveting the firewall
|
Details
|
|
|
06-26-2014
|
5.60
|
re-do of the Firewall
|
Details
|
|
|
06-22-2014
|
1.70
|
Misc - Forward / Aft Brace drilled/deburred
|
Details
|
|
|
06-22-2014
|
4.00
|
Left and Right box weldments riveted
|
Details
|
|
|
06-21-2014
|
1.00
|
rivet forward fuse floor
|
Details
|
|
|
06-21-2014
|
4.00
|
bolts on Landing Gear boxes
|
Details
|
|
|
06-20-2014
|
1.70
|
LG box rivets
|
Details
|
|
|
06-15-2014
|
1.60
|
prime the pushrods, forward floor, F-864D-1
|
Details
|
|
|
06-14-2014
|
1.50
|
Rivet Cooling Ramp, L.G. crossmember platenuts
|
Details
|
|
|
06-14-2014
|
0.70
|
prep for primer - pushrods, forward floor
|
Details
|
|
|
06-14-2014
|
2.00
|
Begin riveting L.E box assembly
|
Details
|
|
|
06-13-2014
|
1.00
|
drill out firewall rivets
|
Details
|
|
|
06-12-2014
|
1.40
|
Rivet Firewall
|
Details
|
|
|
06-11-2014
|
0.30
|
Cleco Firewall
|
Details
|
|
|
06-07-2014
|
5.00
|
etch and prime parts
|
Details
|
|
|
06-06-2014
|
3.00
|
clean up parts in prep for etch and primer
|
Details
|
|
|
05-21-2014
|
1.20
|
deburred the LG box Assemblies
|
Details
|
|
|
05-16-2014
|
1.00
|
C/S and disassemble the LG assemblies
|
Details
|
|
|
05-15-2014
|
1.00
|
final drilling of all L.G. assembly parts
|
Details
|
|
|
05-09-2014
|
2.20
|
L.G. assembly edging (cont) + cleco, drilling
|
Details
|
|
|
05-08-2014
|
0.80
|
edge smooth and debur LG box parts
|
Details
|
|
|
05-01-2014
|
0.70
|
Landing Gear Box - prep work
|
Details
|
|
|
04-27-2014
|
3.80
|
Fwd Fuse floor & Cooling ramp
|
Details
|
|
|
04-26-2014
|
1.50
|
firewall aluminum - final c/s & deburring
|
Details
|
|
|
04-24-2014
|
1.20
|
Firewall - Debur & Dimple
|
Details
|
|
|
04-24-2014
|
1.10
|
Firewall - Bending 8 degree
|
Details
|
|
|
04-17-2014
|
1.60
|
Fuselage - match drilled
|
Details
|
|
|
04-16-2014
|
1.40
|
Firewall smoothing
|
Details
|
|
|
04-14-2014
|
2.00
|
edging the firewall parts
|
Details
|
|
|
04-10-2014
|
0.70
|
Start working on the Fuselage
|
Details
|
|
|
03-26-2014
|
0.50
|
Finished Inventory
|
Details
|
|
|
03-23-2014
|
1.00
|
Fuselage hardware inventory - done!
|
Details
|
|
|
03-20-2014
|
2.70
|
Fuselage inventory #3
|
Details
|
|
|
03-18-2014
|
2.50
|
Fuselage inventory #2
|
Details
|
|
|
03-17-2014
|
2.80
|
Fuselage Inventory #1
|
Details
|
|
|
03-14-2014
|
0.00
|
Big Box arrived this morning
|
Details
|
|
|
01-07-2014
|
0.00
|
Ordered Fuselage kit today!
|
Details
|
|
|
01-13-2013
|
0.00
|
Picked up a Bell tailwheel fork
|
Details
|
|