Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Baffeling
Work Logs Found:
46
Category Work Time:
178 Hours
Date
Hours
Work Log Summary
Details
02-25-2009
4.00
Remade rear baffle fuel line access holes
Details
02-24-2009
2.00
Baffles sealed with RTV
Details
02-23-2009
2.00
Stitched baffle seals
Details
02-22-2009
3.40
Forward baffle bracket
Details
02-15-2009
2.50
Safety wire lower baffles
Details
01-26-2009
1.20
Baffle seals
Details
01-16-2009
3.80
Baffle seals
Details
01-15-2009
4.30
Baffle finishing
Details
01-14-2009
4.00
Baffle finishing
Details
10-22-2008
4.00
Oil Coller Support
Details
10-20-2008
2.50
Baffle Seals
Details
10-16-2008
3.50
Baffle Seals at Inlets
Details
10-13-2008
4.00
Fitting Baffle Seals
Details
10-09-2008
3.40
Baffle Seal Drilling
Details
10-08-2008
3.00
Baffle Seals Cut
Details
01-28-2008
4.00
Oil cooler spacers and baffel fit
Details
01-27-2008
5.50
Riveted L Rear baffels
Details
01-26-2008
2.50
Oil cooler mounting
Details
01-25-2008
4.30
Oil cooler mounting
Details
01-24-2008
5.50
Left rear baffels built up
Details
01-23-2008
3.50
Riveted left side baffels
Details
01-22-2008
4.40
Heat Risers and Air Intake
Details
09-16-2007
3.60
Right forward baffel
Details
09-02-2007
4.00
Baffel Work
Details
09-01-2007
5.50
Inlet Ducts and Baffels
Details
08-31-2007
5.00
Inlet Ducts
Details
08-30-2007
2.80
Cowl Inlet Ducts
Details
08-29-2007
4.00
Forward Baffels
Details
08-28-2007
3.50
Drilled Froward Baffels
Details
01-06-2007
6.00
Forward Baffles
Details
01-04-2007
6.80
FAB Epoxy Complete. Fwd Baffles
Details
01-03-2007
3.50
FAB and Baffles
Details
01-02-2007
6.60
Filtered Air Intake
Details
01-01-2007
4.50
FAB and Baffle Trimming
Details
12-31-2006
3.60
FAB and Began Baffle Trimming
Details
12-30-2006
2.00
Filtered Air Box
Details
12-29-2006
2.50
FAB and Filter Positioning
Details
12-28-2006
4.80
FAB and Trim Forward Floor and Cowl
Details
12-27-2006
6.00
FAB and Baffle Brackets
Details
12-26-2006
3.50
Forward Baffle Floors and FAB
Details
12-23-2006
5.00
Forward Baffle Floors
Details
12-22-2006
3.00
Right Front Baffle Floor
Details
12-21-2006
3.00
Left Forward Floor
Details
12-14-2006
4.00
Baffeling
Details
12-13-2006
5.00
Baffeling
Details
12-11-2006
2.50
Began fitting the engine baffeling
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.