KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
Work Logs Found: 46
Category Work Time: 178 Hours
 Date
Hours
Work Log Summary

Details

 02-25-2009
4.00
Remade rear baffle fuel line access holes
Details
       

 02-24-2009
2.00
Baffles sealed with RTV
Details
       

 02-23-2009
2.00
Stitched baffle seals
Details
       

 02-22-2009
3.40
Forward baffle bracket
Details
       

 02-15-2009
2.50
Safety wire lower baffles
Details
       

 01-26-2009
1.20
Baffle seals
Details
       

 01-16-2009
3.80
Baffle seals
Details
       

 01-15-2009
4.30
Baffle finishing
Details
       

 01-14-2009
4.00
Baffle finishing
Details
       

 10-22-2008
4.00
Oil Coller Support
Details
       

 10-20-2008
2.50
Baffle Seals
Details
       

 10-16-2008
3.50
Baffle Seals at Inlets
Details
       

 10-13-2008
4.00
Fitting Baffle Seals
Details
       

 10-09-2008
3.40
Baffle Seal Drilling
Details
       

 10-08-2008
3.00
Baffle Seals Cut
Details
       

 01-28-2008
4.00
Oil cooler spacers and baffel fit
Details
       

 01-27-2008
5.50
Riveted L Rear baffels
Details
       

 01-26-2008
2.50
Oil cooler mounting
Details
       

 01-25-2008
4.30
Oil cooler mounting
Details
       

 01-24-2008
5.50
Left rear baffels built up
Details
       

 01-23-2008
3.50
Riveted left side baffels
Details
       

 01-22-2008
4.40
Heat Risers and Air Intake
Details
       

 09-16-2007
3.60
Right forward baffel
Details
       

 09-02-2007
4.00
Baffel Work
Details
       

 09-01-2007
5.50
Inlet Ducts and Baffels
Details
       

 08-31-2007
5.00
Inlet Ducts
Details
       

 08-30-2007
2.80
Cowl Inlet Ducts
Details
       

 08-29-2007
4.00
Forward Baffels
Details
       

 08-28-2007
3.50
Drilled Froward Baffels
Details
       

 01-06-2007
6.00
Forward Baffles
Details
       

 01-04-2007
6.80
FAB Epoxy Complete. Fwd Baffles
Details
       

 01-03-2007
3.50
FAB and Baffles
Details
       

 01-02-2007
6.60
Filtered Air Intake
Details
       

 01-01-2007
4.50
FAB and Baffle Trimming
Details
       

 12-31-2006
3.60
FAB and Began Baffle Trimming
Details
       

 12-30-2006
2.00
Filtered Air Box
Details
       

 12-29-2006
2.50
FAB and Filter Positioning
Details
       

 12-28-2006
4.80
FAB and Trim Forward Floor and Cowl
Details
       

 12-27-2006
6.00
FAB and Baffle Brackets
Details
       

 12-26-2006
3.50
Forward Baffle Floors and FAB
Details
       

 12-23-2006
5.00
Forward Baffle Floors
Details
       

 12-22-2006
3.00
Right Front Baffle Floor
Details
       

 12-21-2006
3.00
Left Forward Floor
Details
       

 12-14-2006
4.00
Baffeling
Details
       

 12-13-2006
5.00
Baffeling
Details
       

 12-11-2006
2.50
Began fitting the engine baffeling
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.