Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Systems
Work Logs Found:
26
Category Work Time:
106 Hours
Date
Hours
Work Log Summary
Details
01-19-2006
4.00
Re did brake system connections
Details
10-16-2005
5.50
Flight Control Bushings
Details
07-25-2005
3.00
Defog Vent
Details
07-24-2005
3.60
Defog vent
Details
01-17-2005
5.00
Wiring conduit
Details
01-05-2005
4.00
Wiring conduits added
Details
01-03-2005
4.00
Mounted ELT and Strobe power pack
Details
01-02-2005
3.00
Made mounts for ELT and Strobe
Details
08-24-2004
4.50
Fuel and purge lines
Details
07-18-2004
6.50
Heat box and fuel flow sensor
Details
07-11-2004
1.00
Brake pedals and lines
Details
05-16-2004
4.80
Auto pilot servos
Details
05-10-2004
3.60
Elevator auto pilot servo bracket
Details
05-09-2004
4.50
Completed airleron trim
Details
05-08-2004
3.80
Installed aileron trim servo
Details
05-07-2004
5.00
Aileron trim
Details
05-04-2004
3.60
Prepared the air vents
Details
03-31-2004
5.60
Installed the brake lines.
Details
02-20-2004
4.70
Parking Brake Valve
Details
01-18-2004
2.50
Side panel and brake plate fitting.
Details
01-16-2004
6.00
HP fuel pump lines
Details
01-15-2004
4.60
HP fuel pump lines
Details
01-13-2004
2.50
Fuel vent fittings
Details
01-12-2004
4.00
Fuel vent line
Details
01-03-2004
3.50
Fuel pump and selector valve
Details
01-02-2004
2.80
Fuel pump housing
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.