Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Interior
Work Logs Found:
48
Category Work Time:
163 Hours
Date
Hours
Work Log Summary
Details
09-27-2012
1.30
Interior Side Panels
Details
09-19-2012
3.30
Side panel and wheel fairings
Details
07-18-2012
1.50
Installed Aileron Rod Seal
Details
11-04-2011
1.50
Right Seat Control Stick Pin
Details
09-06-2011
5.00
Interior packed away
Details
09-01-2011
5.10
Interior
Details
08-30-2011
2.90
Interior
Details
08-19-2011
4.00
Interior
Details
08-16-2011
3.90
Interior installation
Details
08-15-2011
4.40
Seat Attachment
Details
08-15-2011
2.00
Seat Attachment
Details
07-21-2011
3.30
Insulation
Details
07-20-2011
6.00
Insulation and Sound Proofing
Details
06-15-2011
3.20
Glare Shield
Details
06-06-2011
4.00
Trimming Side Panel
Details
06-03-2011
5.80
Control Cables & Headset Jacks
Details
06-02-2011
3.30
Reinstalling cables
Details
05-30-2011
5.50
Interior Side Panel
Details
05-11-2011
2.60
Fuel Cover and Wiring
Details
05-10-2011
3.90
Fuel Cover
Details
05-02-2011
2.30
Right Seat Stick Pin
Details
04-30-2011
3.60
Seat Belt Crotch Strap
Details
04-30-2011
3.00
Seat Belt Crotch Strap
Details
04-29-2011
4.60
Seat Belt Crotch Strap
Details
04-28-2011
2.00
Sidewall Panel
Details
04-28-2011
3.00
Seat Belt Crotch Strap
Details
04-27-2011
2.00
Fit Sidewall Panel
Details
04-18-2011
3.20
Order the interior
Details
03-01-2011
3.10
Right Seat Stick pin
Details
06-13-2005
5.00
Installed armrest support
Details
12-27-2004
3.50
Modify center floor cover
Details
09-07-2004
2.00
Installed air vent hose
Details
05-06-2004
6.50
Reassembled the forward cockpit area
Details
05-05-2004
6.00
Forward cockpit assembly
Details
11-26-2003
2.50
Wired the flap motor
Details
11-26-2003
2.00
Riveted the seats together
Details
11-25-2003
1.50
Installed Flap control
Details
11-24-2003
3.00
Routed the Rudder Cable
Details
11-13-2003
3.50
Riveted Seats
Details
11-12-2003
4.50
Primed the interior
Details
11-11-2003
3.00
Masked fuselage for interior painting
Details
04-23-2003
1.50
Installed Static Port
Details
01-06-2003
2.60
Cockpit floor panels
Details
01-05-2003
5.00
Preparing interior panels
Details
01-04-2003
2.60
Preparing cockpit floor panels
Details
12-31-2002
2.50
Installed seat frames
Details
12-23-2002
4.50
Cockpit seats
Details
10-24-2002
2.30
Flight control assembly
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.