Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Electrical
Work Logs Found:
59
Category Work Time:
238 Hours
Date
Hours
Work Log Summary
Details
11-14-2012
2.00
Electrical Schematic
Details
11-13-2012
1.50
Wired Battery Charger
Details
11-07-2012
2.00
Installed the Battery
Details
10-29-2012
1.60
Installed Boots to Electrical Contacts FWF
Details
07-06-2012
1.00
Secured Wiring under the Cockpit Floor
Details
07-08-2009
3.30
ACS wiring
Details
07-07-2009
3.70
ACS 2002 wiring
Details
07-01-2009
4.40
Panel wiring connections
Details
06-23-2009
2.90
Lightspeed ignition power wiring
Details
01-17-2006
6.00
Wiring clean-up
Details
01-16-2006
5.50
Reconfigured Bus Bars
Details
01-15-2006
4.00
Circuit Breaker Panel
Details
11-23-2005
3.00
Tieing wire bundles
Details
11-22-2005
2.50
Map Light Wiring
Details
10-14-2005
6.00
Finished wiring pilot stick and trim
Details
10-13-2005
6.70
Rewiring the trim and pilot stick
Details
10-12-2005
5.00
Rewired the pilot stick and trim.
Details
10-07-2005
4.00
Map Lights & Panel Support
Details
09-29-2005
3.00
Wiring
Details
09-27-2005
5.00
Panel troubleshooting
Details
09-25-2005
4.00
Electrical Troubleshooting
Details
09-02-2005
3.50
Panel troubleshooting
Details
08-31-2005
5.00
Panel troubleshooting
Details
08-30-2005
3.00
Panel Audio Checks
Details
08-29-2005
4.00
ACS 2002 connections
Details
08-27-2005
3.30
Wired Relays
Details
08-26-2005
4.50
Wired Relays
Details
07-19-2005
4.00
Amp sensor
Details
06-11-2005
7.30
Wired Autopilot wiring connectors
Details
03-07-2005
6.30
Auto Pilot Roll Servo Wiring
Details
03-06-2005
4.00
Auro Pilot Pitch Harness
Details
02-24-2005
4.00
Wiring tail lights
Details
02-24-2005
3.50
Mounted map lights
Details
02-23-2005
5.00
Wiring auto pilot and mounted relays
Details
02-22-2005
6.00
Wiring from panel to wings
Details
02-21-2005
6.30
Wired trim and position indicators
Details
02-20-2005
5.30
Flap Position Indicator
Details
02-19-2005
3.00
Stick Trim Wiring
Details
02-18-2005
4.60
Elevator Trim Wiring
Details
02-17-2005
4.00
Wiring harness for com 2
Details
02-16-2005
3.50
Added Second Com Radio
Details
01-20-2005
6.00
Control Stick Wiring
Details
01-19-2005
2.00
Wiring runs
Details
01-19-2005
5.00
ELT Antenna
Details
01-18-2005
7.30
Strobe and ELT wiring
Details
01-01-2005
3.50
Wired the fuel pump and FF
Details
12-30-2004
3.00
Switched Circuit Breakers
Details
12-28-2004
2.00
Installed wiring conduit below panel
Details
11-28-2004
4.00
Attached poser feeds to the busses
Details
11-26-2004
4.50
Electrical buss power feeds
Details
10-17-2004
4.00
Avionics Soledoid and ground block
Details
10-10-2004
3.00
Mounted ACS 2002 Control box
Details
10-09-2004
4.00
Installed dimmer transformer and encoder
Details
10-08-2004
6.00
Attached Diodes, organized shop
Details
10-07-2004
2.00
Assembled Diodes for relays.
Details
10-06-2004
4.00
Planning electrical connections
Details
10-04-2004
4.00
Connected Bettery and Starter relays.
Details
07-10-2002
3.50
Electrical wiring in left wing
Details
07-04-2002
2.50
Electrical wiring in right wing
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.