Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Empennage / Elevator
Work Logs Found:
15
Category Work Time:
39 Hours
Date
Hours
Work Log Summary
Details
07-14-2002
1.50
Adjusted elevator counterweights
Details
04-03-2002
2.50
Attach the trim tab to the elevator
Details
04-02-2002
4.50
Assemble electric elevator trim system
Details
04-01-2002
4.50
Fabricate the elevator trim tab
Details
03-26-2002
2.45
Roll the elevator leading edge
Details
03-24-2002
2.00
Rivet elevator skins to the frame
Details
03-23-2002
1.50
Prepare elevator counterbalence
Details
03-22-2002
2.00
Rivet the elevator frame
Details
03-21-2002
2.00
Drill and prime the elevator frame
Details
02-21-2002
1.40
Rivet stiffeners to elevator skins
Details
02-04-2002
2.00
Prime the elevator skins and stiffeners
Details
02-02-2002
1.50
Debur and dimple the elevators
Details
02-01-2002
3.00
Drill elevator stiffeners
Details
01-31-2002
6.20
Fabricate the elevator stiffeners
Details
01-30-2002
1.50
Drill skins to spar
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.