Bobs RV7 Site
Work Logs Found: 45
Category Work Time: 140 Hours
 Date
Hours
Work Log Summary

Details

 08-21-2012
5.10
Empennage Fairing
Details
       

 07-30-2012
0.80
Empennage Fairing Rubber Seal
Details
       

 07-30-2012
1.50
Empennage Fairing Repair
Details
       

 07-17-2012
2.20
Empennage Fairing Final Fit
Details
       

 07-05-2012
2.00
Installed Tailwheel Steering Link
Details
       

 06-20-2012
1.00
Conneted rudder cables
Details
       

 06-18-2012
1.50
Confirmed Elevator and Rudder Travel
Details
       

 06-14-2012
2.40
Rudder Mounted
Details
       

 06-12-2012
3.00
Vertical Stabilizer Mounted
Details
       

 06-12-2012
1.50
Elevator Trim
Details
       

 06-11-2012
2.20
Elevator Trim Connections
Details
       

 06-08-2012
2.70
Mounted the elevator
Details
       

 06-07-2012
2.50
Mounted Horizontal Stabilizer
Details
       

 02-02-2012
8.00
Final Fit of the Empennage Fairing
Details
       

 01-30-2012
4.10
Final Fit of the Rudder Lower Tip
Details
       

 01-27-2012
3.00
Attached Strobe Light to Lower Rudder
Details
       

 01-26-2012
3.60
Drilled and Attached Nutplates to lower Rudder
Details
       

 01-23-2012
5.50
Modified Shape and Fit of the Empennage Fairing
Details
       

 12-19-2011
1.80
Empennage Fairing
Details
       

 12-15-2011
3.00
Lower Rudder Tip
Details
       

 12-13-2011
2.10
Empennage Access Cover
Details
       

 11-23-2011
2.70
Empennage Fairing
Details
       

 11-21-2011
2.50
Reinstalled VS and HS
Details
       

 03-07-2011
3.00
Empennage Tips
Details
       

 02-07-2011
3.00
Empennage Tips
Details
       

 02-02-2011
6.00
Empennage Tips
Details
       

 01-30-2011
4.70
Empennage Tips
Details
       

 01-28-2011
3.50
Empennage Tips
Details
       

 01-25-2011
4.10
Empennage Tips
Details
       

 01-24-2011
4.50
Empennage Tips
Details
       

 10-18-2005
3.60
Installed nutplates for empenage fairings
Details
       

 10-17-2005
4.00
Replaced Elevator Trim Hinge
Details
       

 12-17-2003
5.50
Fitted Empennage fairings
Details
       

 12-16-2003
1.50
Installed rudder stops
Details
     

 12-15-2003
1.60
Manufactured new rudder stop
Details
       

 11-09-2003
5.30
Mounted the Vertical Stabilizer
Details
       

 11-06-2003
2.50
Constructed elevator control rods
Details
       

 11-05-2003
4.30
Mounted the HS
Details
       

 08-21-2002
4.00
Fiberglass Tips
Details
       

 08-20-2002
3.60
Fiberglass Tips
Details
       

 08-19-2002
3.00
Fiberglass Tips
Details
     

 08-18-2002
2.30
Fiberglass tips
Details
     

 08-10-2002
2.00
Began fitting fiberglass tips
Details
     

 05-18-2002
2.00
Fit rudder to VS and elevator to HS
Details
       

 07-25-2001
1.50
Inventory empennage kit
       