Powered By Kitlog Pro v2.0
TERRY'S WEB SITE
RV 10
Empennage
Work Logs Found:
22
Category Work Time:
130 Hours
Date
Hours
Work Log Summary
Details
12-08-2015
4.00
Tail fairing fit up
Details
12-07-2015
8.00
Tail fairing fit up
Details
12-05-2015
3.00
Tail Fairing work
Details
11-30-2015
7.00
Tail fitting fit up
Details
01-16-2013
5.00
Base paint on fairings
Details
01-09-2013
2.00
Poly Fiber Smooth Prime. UV protection
Details
01-08-2013
0.20
Verification holes added in push tubes
12-22-2012
0.10
05---673 Grommet added to protect elevator trim c
12-20-2012
7.00
Ray Allen 7A installed in Rudder Trim
12-20-2012
1.00
Done except fiberglass on wing tips
12-05-2012
8.00
Installed H.Stab
Details
11-29-2012
1.00
Working on the bottom skin
Details
11-05-2012
8.00
Called in reinforcements
Details
10-29-2012
8.00
HStab initial fit up
Details
10-27-2012
8.00
HStab work
Details
10-26-2012
8.00
Work on rudder
Details
10-25-2012
8.00
Wiring the rudder trim
Details
10-24-2012
8.00
Rudder work
Details
10-23-2012
8.00
Rudder
Details
10-22-2012
8.00
Vertical Stabilizer
Details
10-19-2012
10.00
Details
10-13-2012
10.00
Vertical Stabilizer
Details
SITE NAVIGATION
Contact Builder
RV 10 Home
Category
# Logs
# Hours
All
643
3955
Avionics
73
463
Empennage
22
130
Engine
64
380
Final Assembly
37
228
Fuselage
344
2131
Milestones
6
11
Miscellaneous
4
12
None
6
11
Prop
8
46
Tools
1
1
Wings
78
542
Copyright © 2001-2024 Matronics. All Rights Reserved.