Powered By Kitlog Pro v2.0
Anthonys Web Site
RV8A
Empennage
Work Logs Found:
12
Category Work Time:
35 Hours
Date
Hours
Work Log Summary
Details
10-18-2012
1.00
trim tab wiring
Details
10-16-2012
0.50
trim tab wiring
Details
10-15-2012
6.00
Drilling elevator horns to airframe, setting trave
Details
10-10-2012
3.00
trial fitted elevators - trim motor wiring
Details
10-03-2012
2.00
Trim tab wiring
Details
10-02-2012
0.40
remove electric trim motor from elevator
Details
09-30-2012
6.00
attached vertical stab
Details
09-29-2012
5.00
Installed horizontal stab
Details
09-28-2012
1.50
preparing to bolt the HS and VS on the airframe
Details
09-22-2012
5.00
empennage attachment prep
Details
09-14-2012
3.00
Attachement of Vertical and Horizontal stabs
Details
09-13-2012
1.50
fitting the VS and HS
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
559
1548
Avionics
101
342
baffeling
40
104
canopy
89
236
canopy
45
112
cowl
50
137
electrical
10
24
Electrical
58
180
Empennage
12
35
Engine
5
7
Firewall Forward
89
236
Fuselage
31
64
General
3
4
Instruments
2
4
Miscellaneous
2
6
panel
13
44
Shop Supplies
1
1
Systems
8
12
Copyright © 2001-2024 Matronics. All Rights Reserved.