Project Blue Angels SeaRey
Work
Logs
Found:
22
|
Category Work Time: 71 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
01-24-2014
|
8.00
|
Section 32, Final install of the nose deck
|
Details
|
|
|
01-20-2014
|
2.00
|
Section 32, beginning to secure the nose
|
Details
|
|
|
01-18-2014
|
3.00
|
Section 30, sponson assembly
|
Details
|
|
|
04-05-2013
|
3.00
|
Working section 20, bow eye
|
Details
|
|
|
02-08-2013
|
2.00
|
Section 17, installing the hull side angles
|
Details
|
|
|
01-04-2013
|
4.00
|
Section 5: Finished locking down the airframe to t
|
Details
|
|
|
01-02-2013
|
4.00
|
Section 5, final fitting airframe to the hull
|
Details
|
|
|
12-30-2012
|
1.00
|
Section 5, installing bilge thru-hull
|
Details
|
|
|
12-30-2012
|
3.00
|
Section 5, installed elevator tube boot, rudder an
|
Details
|
|
|
12-30-2012
|
2.00
|
Section 5, hull to gear boots
|
Details
|
|
|
12-30-2012
|
2.00
|
Section 5, cut the landing gear holes in the hull
|
Details
|
|
|
12-29-2012
|
6.00
|
Section 5, frame finally in place
|
Details
|
|
|
12-28-2012
|
4.00
|
Section 5, making bulkhead cross tube cutout
|
Details
|
|
|
12-28-2012
|
3.00
|
Made brackets to help secure the airframe to the h
|
Details
|
|
|
12-28-2012
|
2.00
|
Installed bilge pump
|
Details
|
|
|
12-27-2012
|
4.00
|
Finished cutting transom
|
Details
|
|
|
12-26-2012
|
3.00
|
Section 5, cutting the hull
|
Details
|
|
|
12-26-2012
|
6.00
|
Beginning section 5, installation of airframe into
|
Details
|
|
|
12-25-2012
|
2.00
|
Installed sound proofing
|
Details
|
|
|
12-24-2012
|
2.00
|
Installed hull drain plug
|
Details
|
|
|
12-24-2012
|
2.00
|
Built cabin heater bracket and ran heater hose
|
Details
|
|
|
12-22-2012
|
3.00
|
Installed keel guard
|
Details
|
|
|
|
|
|
|
|
|