KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
Work Logs Found: 28
Category Work Time: 156 Hours
 Date
Hours
Work Log Summary

Details

 07-31-2018
1.00
tested landing light
Details
       

 06-29-2018
1.00
Built a external power plug
Details
       

 06-04-2016
0.00
Attempted to Degauss Rollbar
Details
       

 06-03-2016
1.00
powder coated the spot light bracket
Details
     

 05-22-2016
1.00
Buitl a spot light 2
Details
       

 05-22-2016
1.00
Built a cockpit spotlight 1
Details
       

 01-26-2015
10.00
Added wing wiring disconect
Details
       

 07-02-2014
4.00
Wired the subpanel
Details
     

 06-30-2014
4.00
Stick wire harness installation
Details
       

 06-24-2014
8.00
Control stick wiring
Details
       

 06-18-2014
4.00
Made support brackets clips for control stick wiri
Details
       

 04-09-2014
4.00
Finished Stick Grips
Details
       

 04-08-2014
4.00
Stick grip wieing
Details
       

 03-22-2014
4.00
Floor ready to install
Details
       

 03-21-2014
20.00
Routing wires under the floor
Details
       

 02-03-2014
2.00
Installed VHF Com Antenna
Details
       

 12-30-2013
2.00
Finished ELT wire harness
Details
       

 12-28-2013
4.00
Made up the ELT wire harness
Details
       

 10-01-2013
10.00
Started on subpanel
Details
       

 04-16-2013
8.00
Finished the Pitot heat instalation
Details
       

 04-15-2013
4.00
Wing tip Nav/Strobe lights
Details
     

 04-10-2013
6.00
Bending ADAHRS Tubes
Details
       

 03-12-2013
8.00
Building ADAHRS wire harness
Details
       

 12-19-2012
5.00
Built a wing tip Nav/Strobe light bracket
Details
       

 11-25-2012
5.00
Built ELT bracket
Details
       

 09-19-2012
5.00
Built dummy ADAHARS sensor
Details
     

 09-12-2012
10.00
Built ADAHARS bracket
Details
       

 08-16-2012
20.00
Designed Dynon ADAHARS support bracket for wing
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.