Powered By Kitlog Pro v2.0
Chops' Web Site
RV-8
Empennage
Work Logs Found:
28
Category Work Time:
100 Hours
Date
Hours
Work Log Summary
Details
07-15-2017
6.00
Fin installation
Details
01-19-2015
20.00
SB 14-01-31 Horizontal stabiliser forward spar mod
Details
12-14-2013
1.00
Elevator bellcrank centre pivot
Details
11-09-2013
4.00
Elevator initial installlation
Details
11-06-2013
8.00
Elevator trim tab
Details
08-03-2013
1.00
Trial fit of elevators
Details
08-03-2013
3.00
Roll R/H elevator leading edge
Details
07-27-2013
3.00
Roll L/H elevator leading edge
Details
09-28-2012
4.00
Left elevator assembly
Details
09-25-2012
3.00
Left elevator priming
Details
09-16-2012
3.00
Right elevator assembly
Details
09-15-2012
3.00
Right elevator priming
Details
07-19-2011
4.00
Rudder completion
Details
08-07-2010
1.00
Unpacking
Details
10-26-2007
1.00
Packing
Details
04-17-2005
7.00
Horizontal stabiliser assembled
Details
03-28-2005
1.50
Horizontal stab spars assembly
Details
03-26-2005
3.50
Vertical fin assembly
Details
03-25-2005
1.00
Left stabiliser and fin priming
Details
03-24-2005
2.00
Horizontal stab and fin priming prep
Details
03-23-2005
1.00
Horizontal stab and fin priming prep
Details
01-26-2005
3.00
Right horizontal stab prep cont.
Details
12-21-2004
4.00
Right horizontal stabiliser prep.
Details
12-20-2004
1.50
Left horizontal stabiliser structure and skins
Details
12-19-2004
4.00
Left horizontal stabiliser ribs prep
Details
11-25-2004
1.00
Horizontal stabiliser spar cont.
Details
11-22-2004
1.50
Horizontal stabiliser spar construction continued.
Details
11-21-2004
4.00
Horizontal stabiliser spar construction
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
156
659
Avionics
14
58
Electrical
10
39
Empennage
28
100
Engine
12
54
Flight controls
6
17
Freight
1
4
Fuel System
7
28
Fuselage
61
266
Miscellaneous
2
6
TC Visit
1
2
Wings
14
85
Copyright © 2001-2024 Matronics. All Rights Reserved.