Powered By Kitlog Pro v2.0
TAB Aircraft LLC Web Site
Searey LSX
Wings
Work Logs Found:
42
Category Work Time:
80 Hours
Date
Hours
Work Log Summary
Details
05-08-2014
1.00
Page 490 Installing Trim Tab
Details
05-07-2014
0.50
Page 489 Installing Wing Bolt Hole Covers
Details
11-02-2013
1.00
Page 399 Installed Weather Strip to Gap Seal
Details
10-28-2013
2.00
Page 394 Installed Taxi and Landing Lights
Details
10-27-2013
3.00
Page 393 Installed the Top part of the Gap Seal
Details
10-26-2013
0.00
Page 392 Found right Flap twisted
Details
10-25-2013
1.00
Page 391 Replaced Wrong sized bolts on struts
Details
10-24-2013
3.00
Page 390 Installing Gap Seals to Wing
Details
10-22-2013
2.00
Page 388 Installed the Wings
Details
10-20-2013
6.00
Page 386 Getting the Wing Ready to Hang
Details
10-09-2013
1.50
Page 375 Installed Pitot and A.O.A. Tubes in Wing
Details
04-15-2013
2.00
Page 228 Installed Navigation Lights
Details
04-08-2013
0.75
Page 225 Installed all the Cotter Pins
Details
04-02-2013
1.50
Page 224 Installed the Aileron Control Horns
Details
03-29-2013
1.00
Page 221 Strut Assembly 2
Details
03-28-2013
0.50
Page 220 Strut Assembly 1
Details
03-27-2013
1.00
Page 219 Sponson Assembly 2
Details
03-26-2013
1.00
Page 218 Sponson Assembly 1
Details
03-25-2013
1.00
Page 217 Installed Gap Seal Attach Angles
Details
03-19-2013
2.00
Page 213 Installing Gap Seals 4
Details
03-18-2013
4.00
Page 212 Installing Gap Seals 3
Details
03-17-2013
2.00
Page 211 Installing Gap Seals 2
Details
03-16-2013
8.00
Page 210 Installing Gap Seals 1
Details
03-13-2013
1.50
Page 207 Installed Wing Hinges
Details
03-12-2013
1.00
Page 206 Installed the Aileron Torque Tube Horn
Details
03-09-2013
1.50
Page 203 Installed Aileron and Flap Hinges
Details
03-08-2013
1.00
Page 202 Riveting the Root Gap Seal underside
Details
03-07-2013
3.00
Page 201 Installing the Stabilizer Root Gap Seal
Details
03-06-2013
3.00
Page 200 Installing Control Horn on the Elevator
Details
02-27-2013
1.00
Page 198 Installing the Stabilizer to the Bracket
Details
02-26-2013
2.00
Page 197 Installing the Vertical Fin Forward Cove
Details
02-23-2013
1.00
Page 194 Rudder Final Finishes
Details
02-22-2013
0.50
Page 193 Vertical Fin Final Finishes
Details
02-07-2013
2.00
Page 178 Installing the Gap Seals
Details
02-06-2013
0.00
Page 177 Visit to the Paint Shop 5
Details
01-25-2013
3.00
Page 165 Getting Ready to Paint 5
Details
01-24-2013
1.00
Page 164 Getting Ready to Paint 4
Details
01-22-2013
2.00
Page 162 Getting Ready to Paint 3
Details
01-19-2013
1.00
Page 159 Getting Ready to Paint 1
Details
12-17-2012
4.00
Page 130 Installed the 3" Linear Tape on the Seam
Details
12-14-2012
3.00
Page 129 Covering the Vertical Stabilizer
Details
11-29-2012
3.00
Page 114 Covering the Vertical Stabilizer
Details
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
546
800
Aircraft
7
2
Airframe
58
113
Avionics
45
86
Background
20
1
Brakes
5
4
Cockpit
67
130
Education
17
2
Engine
38
28
Exterior Trim
24
25
Fly-In/Party
7
Fuselage
5
9
Gear Assembly
21
22
Hull
12
19
Interior Trim
27
38
Miscellaneous
22
2
Modifications
42
72
None
1
Prop
5
4
Turtle Deck
16
32
Wings
42
80
Wiring
53
131
Work Shop/Hanger
12
Copyright © 2001-2024 Matronics. All Rights Reserved.