Work Logs Found: 46
Category Work Time: 90 Hours
 Date
Hours
Work Log Summary

Details

 09-08-2014
0.75
Tied some cht/egt wires to the engine mount with 2
Details
     

 09-07-2014
2.50
Last baffle tension rod, Reroute some wires, Heat
Details
       

 08-28-2014
1.75
Manifold pressure hose and misc
Details
       

 08-22-2014
1.50
oil lines and fittings torqued. Fuel lines and pr
Details
     

 08-18-2014
5.00
Finish routing and securing all the engine compart
Details
       

 08-14-2014
1.50
Start securing wires on left engine side
Details
       

 08-13-2014
5.50
Attach throttle and mixture cables to carb. Variou
Details
       

 04-27-2014
2.50
Engine cables sealed in with fire barrier on firew
Details
       

 04-18-2014
2.00
dry fit the thottle and mixture cables to the carb
Details
       

 04-07-2014
5.00
Wired the mags and alternator and starter. Electri
Details
       

 04-06-2014
1.00
Finsih connectors on EGT sensors and start on P-le
Details
       

 04-04-2014
6.00
Mount oil cooler, Attach EGT probes, Connectorize
Details
       

 04-03-2014
2.50
EGT/CHT wire crimping
Details
     

 03-29-2014
1.50
Pressurize and leak test the fuel line thru red cu
Details
       

 03-25-2014
5.50
connecting engine sensor wires and misc.
Details
       

 03-20-2014
4.50
Sensor connections
Details
       

 03-18-2014
2.50
More red cube mounting
Details
       

 03-11-2014
1.50
redcube positioning and fuel pump venting
Details
       

 12-15-2013
1.50
Shunt wires and battery bus wire fab
Details
       

 12-15-2013
1.00
Heat shield for wires exiting firewall rt side
Details
       

 12-03-2013
1.50
baffle 5
Details

 11-18-2013
2.50
Torque and cotter pin engine and mount. Starter re
Details
       

 11-10-2013
1.00
Starter relay bracket fabrication and fitting
Details
       

 11-10-2013
1.25
Installed the Filter airbox flap control cable
Details
       

 11-02-2013
1.00
Shunt and manifold pressure sensor mounted
Details
       

 11-02-2013
1.50
Install gascolator
Details
       

 11-02-2013
1.00
Control cable grommets and heat shields drilled
Details
       

 11-01-2013
1.00
Transducer manifold spacer fabrication
Details
       

 11-01-2013
2.50
Steel FW pass throughs for wire
Details
       

 10-31-2013
2.50
Drilling and attaching fire sleeve pass thrus for
Details
       

 09-23-2013
0.75
lord mounts loosely placed
Details
     

 09-23-2013
0.50
install fittings on the pressure manifold
Details
       

 09-22-2013
0.75
pressure manifold drilled for install
Details
       

 08-22-2013
2.25
misc fuselage work
Details
       

 07-24-2013
2.00
engine mount install
Details
       

 07-17-2013
2.00
Engine mount install
Details
       

 05-05-2013
0.25
Heat valve box final instal
Details
     

 03-30-2013
1.50
Rivit battery tray to firewall
Details
       

 02-09-2013
1.00
battery shelf/mount 6
Details
       

 12-18-2012
0.25
Tg-10 two
Details
       

 12-18-2012
0.25
battery mount-5
Details
       

 12-11-2012
0.50
TG-10 position delima-1
Details
     

 12-11-2012
2.00
Battery mount-4
Details
       

 12-10-2012
2.00
battery tray-3
Details
       

 12-08-2012
1.75
Battery tray -2
Details
       

 11-30-2012
1.00
battery hold down fabrication-1
Details
       