Work Logs Found: 141
Category Work Time: 432 Hours
 Date
Hours
Work Log Summary

Details

 06-18-2018
2.00
Out flow cowling work.
Details
     

 05-31-2018
6.00
Worked on cowling. Prime, sand and fill 4 bids on
Details
       

 04-26-2018
3.00
Rivet on hinges to lower cowling.
Details
       

 04-18-2018
2.00
3 bids on lower wing for cowling hinge
Details
       

 04-17-2018
2.00
Heat cowling to fit hinges.
Details
       

 04-15-2018
3.00
Mount hinges to cowling and wing flange.
Details
       

 04-14-2018
2.00
Upper and lower cowling hinge.
Details
     

 04-13-2018
4.00
3 bids on wing for hinges to mount too.
Details
       

 04-11-2018
2.00
Fill in lower cowling gap.
Details
       

 04-10-2018
3.00
Cowling is ready to be joined.
Details
       

 03-29-2018
4.00
Co-pilot wing cut out on cowling
Details
       

 01-22-2018
4.00
Stainless was cut and riveted into place.
Details
     

 11-27-2017
2.00
2 bids on outside cowling center section.
Details
     

 11-24-2017
2.00
Work on center cowling to fit bottom and top
Details
       

 11-23-2017
2.00
Hinges at end of cowling.
Details
       

 11-21-2017
1.00
The heat lights to the rescue.
Details
     

 11-19-2017
3.00
Installed cowling and gapped for clearance.
Details
       

 11-19-2017
1.00
Fill and sand on cowling
Details
     

 11-17-2017
1.00
Tig welded hinge pins to handle
Details
     

 11-13-2017
5.00
Upper and lower wing hinges installed on flange an
Details
       

 11-13-2017
2.00
Hing for upper and lower cowling
Details
       

 11-12-2017
3.00
3 bids on upper wing for cowling hinge.
Details
       

 11-09-2017
2.00
Cut cowling and 1 bids on outside
Details
       

 11-08-2017
2.00
Bid the bottom to the top cowling
Details
       

 11-05-2017
3.00
3 bids onto bottom wing for cowling to attach too.
Details
       

 10-28-2017
2.00
Add cut peace back onto cowling.
Details
       

 09-10-2017
3.00
Gapping wing to strake
Details
       

 07-05-2017
4.00
Fit wing to cowling for cutting.
Details
     

 05-16-2017
2.00
Move recirculation fan bracket
Details
       

 05-07-2017
6.00
Install micro switch for throttle (gear up warning
Details
       

 04-18-2017
5.00
Worked on securing cables and finished alternate a
Details
       

 04-13-2017
5.00
I worked on the governor today.
Details
       

 04-12-2017
4.00
Governor was put into place and making bracket for
Details
       

 04-11-2017
3.00
Mounted throttle and mixture cables.
Details
       

 04-10-2017
3.00
Mounts to hold the throttle and mixture cables.
Details
       

 04-10-2017
2.00
Finish fuel lines with Tees and fire shield
Details
       

 04-09-2017
2.00
Latch mounting for oil cowling door.
Details
       

 04-07-2017
3.00
Run and mount Tee handle for alternate air source
Details
     

 03-30-2017
2.00
Worked on alternate air source
Details
     

 03-17-2017
3.00
Trim on fuel hatch door. Remove handle bases
Details
       

 03-16-2017
2.00
Worked on oil hatch door.
Details
     

 03-15-2017
5.00
Made alternate air source for fuel servo.
Details
       

 03-14-2017
3.00
Worked on the oil access door today.
Details
       

 03-13-2017
4.00
Worked on cabin air return
Details
       

 03-12-2017
4.00
Worked on cabin heat system.
Details
       

 03-11-2017
1.00
Structurally glued the front Naca door tab on
Details
     

 03-11-2017
5.00
More fuel line work and heat shield for back cylin
Details
       

 03-10-2017
2.00
Worked on Naca door
Details
       

 03-10-2017
2.00
Worked on fuel lines from servo to spider
Details
       

 03-09-2017
3.00
Made naca door @ oil cooler.
Details
       

 03-07-2017
3.00
Glassed in air return duct for oil cooler
Details
       

 03-06-2017
2.00
More work on cabin air return through oil cooler
Details
       

 03-05-2017
3.00
Anchor nuts for winter cover mounted.
Details
       

 03-03-2017
3.00
Worked on cabin return air
Details
       

 03-01-2017
4.00
Making cabin return air fir heater
Details
       

 02-27-2017
4.00
Time to micro the exhaust tubes on the cowling.
Details
       

 02-26-2017
4.00
More fuel line work on plane
Details
       

 02-25-2017
3.00
Clean up & 2 bid on inside of cowling for exhaust
Details
       

 02-24-2017
2.00
Installed alternator and fuel servo line bumbs.
Details
     

 02-23-2017
8.00
Fitted exhaust cowling tubes for exhaust pips.
Details
       

 02-22-2017
4.00
Had to make room for alternator and made 4” tube
Details
       

 02-21-2017
4.00
Cut cowling for exhaust and made 4” tube.
Details
       

 02-20-2017
4.00
Fuel servo, fuel lines, and cowling cutouts
Details
       

 02-15-2017
2.00
Ran more fuel lines.
Details
       

 02-03-2017
4.00
Oil lines, fuel fiitings Throttle, mixture, govern
Details
       

 01-18-2017
3.00
Run more fuel lines
Details
       

 01-17-2017
4.00
Modified exhaust manifold to fit plane.
Details
       

 01-04-2017
6.00
Running fuel lines and ordering fittings and stuff
Details
     

 01-02-2017
2.00
Installed fuel boost pump regulator
Details
       

 01-01-2017
5.00
Installed gascolator, fuel filter and fuel pump to
Details
       

 12-20-2016
1.00
Flanged for oil cooler installed, Scat added.
Details
     

 12-08-2016
1.00
Scat was installed for air intake
Details
     

 11-27-2016
6.00
Make and install oil cooler shroud and radiator
Details
       

 11-23-2016
2.00
Install fuel servo (carburetor)
Details
     

 11-17-2016
5.00
Coffee can air-filter in new spot
Details
       

 11-16-2016
3.00
Coffee can air filter work & retracts
Details
       

 11-15-2016
5.00
More work on coffee air cleaner can
Details
       

 11-14-2016
3.00
Making coffee can air filter can
Details
       

 11-11-2016
3.00
Cleaned up side flange and make air cleaner flange
Details
       

 11-03-2016
2.00
Staring to make the air cleaner can
Details
       

 07-22-2016
2.00
Sand, assemble and paint air box with truck liner
Details
     

 07-14-2016
2.00
Flange was cured and now to trim and bolt on
Details
       

 07-13-2016
2.00
Work on the oil filler access trough plenum
Details
       

 07-11-2016
3.00
Bolt on baffles to stop air from escaping
Details
       

 07-06-2016
4.00
More work on air plenum
Details
       

 06-28-2016
4.00
Riveted nut plates on, trimmed plug caps, and prim
Details
       

 06-27-2016
3.00
Drill and fit caps over spark plug holes
Details
       

 06-26-2016
4.00
Sand & prime main grear. 3" spark plug holes made.
Details
       

 06-24-2016
4.00
Clean up bid, sand micro and add, sand fill prime
Details
       

 06-23-2016
3.00
Trimmed glass, added to ends to stiffen, micro on
Details
       

 06-20-2016
3.00
Glass inside of air box
Details
       

 06-19-2016
5.00
Worked on plenum opening for air flow
Details
       

 06-18-2016
6.00
Worked on intake to air box (plenum)
Details
       

 06-14-2016
5.00
Work on air box and NACA runners
Details
       

 05-23-2016
5.00
Worked on air plenum
Details
       

 05-22-2016
3.00
Lay-up triax and now fitting to top of air plenum
Details
     

 05-17-2016
4.00
Finish box and fit air plenum to cowling
Details
       

 05-01-2016
5.00
Working on cooling plenum
Details
       

 03-20-2016
3.00
Cut and fit plenum over cylinder heads
Details
       

 03-15-2016
2.00
Glass up triax for plenum
Details
       

 03-10-2016
2.00
Cut triax for air plenum
Details
     

 03-03-2016
3.00
Making templates for cooling air plenum
Details
       

 02-29-2016
3.00
Cylinder head plenum prep 4 bid
Details
       

 02-28-2016
5.00
Header tank reinstalled, engine bolted on.
Details
       

 02-27-2016
3.00
NACA outlet to fire wall
Details
     

 02-22-2016
3.00
Engine mount back on engine
Details
       

 02-21-2016
10.00
Engine work and prep for mounting
Details
       

 02-16-2016
3.00
Triax added at bolt hole locations
Details
     

 02-13-2016
3.00
Bolt engine to fire wall
Details
       

 02-12-2016
3.00
Get engine out of crate and flox firewall stainles
Details
       

 02-04-2016
3.00
Cowling on and engine brought home from hanger
Details
       

 02-02-2016
4.00
Install fiberfrax and 1/16” stainless steel to fir
Details
       

 01-31-2016
3.00
Floxed on lower cowling flange and clean up
Details
       

 01-30-2016
3.00
Lower cowling flange for no screws
Details
       

 01-29-2016
2.00
Floxed on cowling flange to firewall
Details
       

 01-28-2016
3.00
Cut bid and did a 3 bid lay-up for upper cowling
Details
       

 01-26-2016
3.00
Hang up canard, move plane, cleco cowling on.
Details
       

 01-12-2016
1.00
Trace out firewall stainless
Details
       

 01-11-2016
2.00
Sand NACA funnels and make template for firewall s
Details
       

 01-10-2016
2.00
Removed NACA outflow funnels and trimmed
Details
     

 01-09-2016
2.00
3 bid on the foam from the NACA outlet
Details
       

 01-07-2016
2.00
NACA plenum cooling part of engine
Details
       

 01-05-2016
1.00
Engine cooling plenum chamber
Details
     

 01-01-2013
2.00
More heater work
Details
     

 12-29-2012
3.00
Time to finish the heater to the cabin
Details
       

 12-28-2012
3.50
Heater cable time
Details
       

 12-27-2012
1.50
Sanded heater/cooler out flow
Details
     

 12-24-2012
3.00
Oil lines get a place to be
Details
       

 12-18-2012
3.00
Heater/Cooler work
Details
       

 12-16-2012
1.50
Heater duct gets 1 bid lay-up
Details
       

 12-15-2012
1.00
Heat shrinked oil lines.
Details
     

 12-15-2012
3.00
Bolted on heater and lay-upped the out flow
Details
     

 12-10-2012
1.00
Sand and attached foam
Details
     

 12-09-2012
1.50
Refit out-let ducting
Details
       

 12-08-2012
1.50
Heater tubes for cabin
Details
       

 12-08-2012
1.50
Floxed in bed for weather stripping
Details
       

 12-07-2012
1.00
Sanded cabin heater intake
Details
       

 12-04-2012
2.50
More work on heater
Details
       

 12-02-2012
3.50
More heater work
Details
       

 11-30-2012
3.50
Bid in Heater/cooler scoop
Details
       

 11-29-2012
2.50
Nose Mounted Cooler
Details
       